API: 15-033-21086
Operator: AMERICAN WARRIOR INC. Field: Coldwater Townsite Lease: Lenertz Well 2 |
Location: T32S R19W, Sec. 13, SE
1280 North, 1260 West, from SE corner Longitude: -99.332078 Latitude: 37.2547142 County: Comanche Status: GAS |
Spud Date: 08-MAY-00
Completion Date: 23-AUG-00 Plugging Date: Total Depth: 6050 Form. at depth: ARBUCKLE Elevation: 2063 KB |
Test Number: 1 | Data Source: TRILOBITE |
Interval: 4648 to 4676
Formation tested: Kansas city | Date, Time: 15-MAY-00; 01:37:59 |
Initial Hydro Pressure: 2300 PSI
First Initial Flow Pressure: 57 PSI First Final Flow Pressure: 148 PSI Initial Shut-in Pressure: 1576 PSI Second Initial Flow Pressure: 117 PSI Second Final Flow Pressure: 224 PSI Final Shut-in Pressure: 1585 PSI Final Hydro Pressure: 2180 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 292.94 ft. Drill Pipe Length: ft. |
Initial Flow: Strong blow bottom of bucket in 20 seconds. Gas to surface in 14 minutes Gauge gas. Initial Shut-In: Bled down for 10 minutes. No blow back. Final Flow: Strong blow. Bottom of bucket in 40 seconds. Gauge gas. Final Shut-In: Bled down for 15 minutes. No blow back. |
|
Bottom Hole Temperature: 121 DEG F
Percent Porosity: Samples: Caraway analytical Gas Recovery: Comments: | |
Recovery 410 of Total Fluid 293 of Fluid in Drill Collars 117 of Fluid in Drill Pipe 4232 of Gas in pipe. 120 of Slightly gas cut muddy water 290 of Gas cut salt water 65000 of Salinity (PPM) | |
View Pressures | View Recovery Gas |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |
Test Number: 2 | Data Source: TRILOBITE |
Interval: 4943 to 5004
Formation tested: Marmaton | Date, Time: 16-MAY-00; 14:39:41 |
Initial Hydro Pressure: 2410 PSI
First Initial Flow Pressure: 701 PSI First Final Flow Pressure: 718 PSI Initial Shut-in Pressure: 1859 PSI Second Initial Flow Pressure: 471 PSI Second Final Flow Pressure: 738 PSI Final Shut-in Pressure: 1840 PSI Final Hydro Pressure: 2330 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 292.94 ft. Drill Pipe Length: ft. |
Initial Flow: Strong blow. Bottom of bucket in 20 seconds. Gas to surface in 2 minutes. Gauge gas. Initial Shut-In: Bled down for 20 minutes. Built back to 1/4"". Final Flow: Strong blow. Bottom of bucket in 10 seconds. Gauge gas. Fluid to surface in 24 minutes. Final Shut-In: Bled down for 20 minutes. Built back to bottom of bucket. |
|
Bottom Hole Temperature: 126 DEG F
Percent Porosity: Samples: Caraway Analytical Gas Recovery: Comments: | |
Recovery 1020 of Total Fluid 293 of Fluid in Drill Collars 727 of Fluid in Drill Pipe 3902 of Gas in pipe. 120 of Slightly gas & condensate cut watery mud 900 of Slightly gas cut water 50000 of Salinity (PPM) | |
View Pressures | View Recovery Gas |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |
Test Number: 3 | Data Source: TRILOBITE |
Interval: 5173 to 5193
Formation tested: Mississippi | Date, Time: 17-MAY-00; 18:12:27 |
Initial Hydro Pressure: PSI
First Initial Flow Pressure: PSI First Final Flow Pressure: PSI Initial Shut-in Pressure: PSI Second Initial Flow Pressure: PSI Second Final Flow Pressure: PSI Final Shut-in Pressure: PSI Final Hydro Pressure: PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 292.94 ft. Drill Pipe Length: ft. |
Initial Flow: Hit bridge 350-400 feet off bottom. Could not go through it. ISI: FF: FSI: | |
Bottom Hole Temperature: 118 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
View Pressures | No Recovery Gas data. |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |
Test Number: 4 | Data Source: TRILOBITE |
Interval: 5173 to 5193
Formation tested: Mississippi | Date, Time: 18-MAY-00; 05:04:07 |
Initial Hydro Pressure: 2515 PSI
First Initial Flow Pressure: 159 PSI First Final Flow Pressure: 169 PSI Initial Shut-in Pressure: 1704 PSI Second Initial Flow Pressure: 187 PSI Second Final Flow Pressure: 329 PSI Final Shut-in Pressure: 1642 PSI Final Hydro Pressure: 2498 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 292.94 ft. Drill Pipe Length: ft. |
Initial Flow: Fair blow Bottom of bucket in 20 seconds. Gas to surface in 8 minutes. Gauge gas. Initial Shut-In: Bled down for 10 minutes. Built back to 1/2"" in H2O bucket. Final Flow: Fair blow bottom of bucket in 2 minutes. Gauge gas. Final Shut-In: Bled down for to bottom of bucket in 4 minutes. |
|
Bottom Hole Temperature: 132 DEG F
Percent Porosity: Samples: Caraway Analytical 728 N.Roosevelt Gas Recovery: Comments: | |
Recovery 690 of Total Fluid 293 of Fluid in Drill Collars 397 of Fluid in Drill Pipe 4480 of Gas in pipe. 120 of Slightly oil & gas cut muddy water. 570 of Salt water 80000 of Salinity (PPM) | |
View Pressures | View Recovery Gas |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |
Test Number: 5 | Data Source: TRILOBITE |
Interval: 5674 to 5715
Formation tested: Viola | Date, Time: 20-MAY-00; 10:38:30 |
Initial Hydro Pressure: 2758 PSI
First Initial Flow Pressure: 1773 PSI First Final Flow Pressure: 1791 PSI Initial Shut-in Pressure: 2035 PSI Second Initial Flow Pressure: 1704 PSI Second Final Flow Pressure: 1781 PSI Final Shut-in Pressure: 2028 PSI Final Hydro Pressure: 2739 PSI |
Tool Data Hole Size: 7.78 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 292 ft. Drill Pipe Length: 5380 ft. |
Initial Flow: Very strong blow bottom of bucket in 15 seconds. Gas to surface in 1 1/2 minutes. Initial Shut-In: 1"" blow back. Final Flow: Bottom of bucket immediately. Final Shut-In: Surface blow back. Gas will burn. |
|
Bottom Hole Temperature: 132 DEG F
Percent Porosity: 18 Samples: Caught one sample Gas Recovery: Comments: | |
Recovery 2 of Total Fluid 2 of Fluid in Drill Collars 5670 of Gas in pipe. 2 of Condensate | |
View Pressures | View Recovery Gas |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |