|
API: 15-033-21087
Operator: PELICAN HILL OIL & GAS, INC. Field: Wildcat Lease: Lytle 'A' Well 1 |
Location: T32S R18W, Sec. 2, SE SE SE SW
150 North, 2500 East, from SW corner Longitude: -99.2466549 Latitude: 37.2814768 County: Comanche Status: O&G-P&A |
Spud Date: 10-MAY-00
Completion Date: 23-MAY-00 Plugging Date: 01-DEC-14 Total Depth: 5797 Form. at depth: ARBUCKLE Elevation: 2103 KB |
| Test Number: 1 | Data Source: TRILOBITE |
|
Interval: 4987 to 5027
Formation tested: Marmaton | Date, Time: 18-MAY-00; 22:36:06 |
|
Initial Hydro Pressure: 2386 PSI
First Initial Flow Pressure: 95 PSI First Final Flow Pressure: 110 PSI Initial Shut-in Pressure: 1832 PSI Second Initial Flow Pressure: 94 PSI Second Final Flow Pressure: 103 PSI Final Shut-in Pressure: 1833 PSI Final Hydro Pressure: 2365 PSI |
Tool Data Hole Size: 7.78 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 353 ft. Drill Pipe Length: 4610 ft. |
|
Initial Flow: Strong bottom of bucket immediately. Gas to surface in 6 minutes. Gauged 259,000 CFPD. Initial Shut-In: No blow back. Final Flow: Gauged 288,000 CFPD. Final Shut-In: No blow back. Remarks: Est. 5 Ft. of Pay. Gas burned. |
|
|
Bottom Hole Temperature: 109 DEG F
Percent Porosity: 18 Samples: One Gas Recovery: Comments: | |
|
Recovery 190 of Total Fluid 190 of Fluid in Drill Collars 4773 of Gas in pipe. 190 of Mud 5800 of Salinity (PPM) | |
| View Pressures | View Recovery Gas |
| Test Number: 2 | Data Source: TRILOBITE |
|
Interval: 5150 to 5195
Formation tested: Mississippi | Date, Time: 20-MAY-00; 02:52:08 |
|
Initial Hydro Pressure: 2502 PSI
First Initial Flow Pressure: 381 PSI First Final Flow Pressure: 375 PSI Initial Shut-in Pressure: 1774 PSI Second Initial Flow Pressure: 369 PSI Second Final Flow Pressure: 337 PSI Final Shut-in Pressure: 1771 PSI Final Hydro Pressure: 2492 PSI |
Tool Data Hole Size: 7.78 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 353 ft. Drill Pipe Length: 4795 ft. |
|
Initial Flow: Strong bottom of bucket immediately. Gas to surface in 3 minutes. Gauged 1,184,000 CFPD. Initial Shut-In: No blow back. Final Flow: Gauged 1,270,000 CFPD. Final Shut-In: No blow back. Remarks: Est. 15 Ft. of Pay. Gas burned. |
|
|
Bottom Hole Temperature: 113 DEG F
Percent Porosity: 10 Samples: One Gas Recovery: Comments: | |
|
Recovery 270 of Total Fluid 270 of Fluid in Drill Collars 4878 of Gas in pipe. 270 of Gas cut Mud 4200 of Salinity (PPM) | |
| View Pressures | View Recovery Gas |