Drill Stem Tests Database
Specific Well--15-033-21087
API: 15-033-21087
Operator: PELICAN HILL OIL & GAS, INC.
Field: Wildcat
Lease: Lytle 'A'
Well 1
Location: T32S R18W, Sec. 2, SE SE SE SW
150 North, 2500 East, from SW corner
Longitude: -99.2466549
Latitude: 37.2814768
County: Comanche
Status: O&G-P&A
Spud Date: 10-MAY-00
Completion Date: 23-MAY-00
Plugging Date: 01-DEC-14
Total Depth: 5797
Form. at depth: ARBUCKLE
Elevation: 2103 KB
Test Number: 1 Data Source: TRILOBITE
Interval: 4987 to 5027
Formation tested: Marmaton
Date, Time: 18-MAY-00; 22:36:06
Initial Hydro Pressure: 2386 PSI
First Initial Flow Pressure: 95 PSI
First Final Flow Pressure: 110 PSI
Initial Shut-in Pressure: 1832 PSI
Second Initial Flow Pressure: 94 PSI
Second Final Flow Pressure: 103 PSI
Final Shut-in Pressure: 1833 PSI
Final Hydro Pressure: 2365 PSI
Tool Data
Hole Size: 7.78 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 353 ft.
Drill Pipe Length: 4610 ft.
Initial Flow: Strong bottom of bucket immediately. Gas to surface in 6 minutes. Gauged 259,000 CFPD. Initial Shut-In: No blow back.
Final Flow: Gauged 288,000 CFPD.
Final Shut-In: No blow back. Remarks: Est. 5 Ft. of Pay. Gas burned.
Bottom Hole Temperature: 109 DEG F
Percent Porosity: 18
Samples: One
Gas Recovery:
Comments:
Recovery
190 of Total Fluid
190 of Fluid in Drill Collars
4773 of Gas in pipe.
190 of Mud
5800 of Salinity (PPM)
View Pressures View Recovery Gas
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 2 Data Source: TRILOBITE
Interval: 5150 to 5195
Formation tested: Mississippi
Date, Time: 20-MAY-00; 02:52:08
Initial Hydro Pressure: 2502 PSI
First Initial Flow Pressure: 381 PSI
First Final Flow Pressure: 375 PSI
Initial Shut-in Pressure: 1774 PSI
Second Initial Flow Pressure: 369 PSI
Second Final Flow Pressure: 337 PSI
Final Shut-in Pressure: 1771 PSI
Final Hydro Pressure: 2492 PSI
Tool Data
Hole Size: 7.78 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 353 ft.
Drill Pipe Length: 4795 ft.
Initial Flow: Strong bottom of bucket immediately. Gas to surface in 3 minutes. Gauged 1,184,000 CFPD. Initial Shut-In: No blow back.
Final Flow: Gauged 1,270,000 CFPD.
Final Shut-In: No blow back. Remarks: Est. 15 Ft. of Pay. Gas burned.
Bottom Hole Temperature: 113 DEG F
Percent Porosity: 10
Samples: One
Gas Recovery:
Comments:
Recovery
270 of Total Fluid
270 of Fluid in Drill Collars
4878 of Gas in pipe.
270 of Gas cut Mud
4200 of Salinity (PPM)
View Pressures View Recovery Gas
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.