Drill Stem Tests Database
Specific Well--15-033-21090
API: 15-033-21090
Operator: IMPERIAL OIL PROPERTIES, INC.
Field: Nescatunga
Lease: Bergner 'C'
Well 17-1
Location: T32S R18W, Sec. 17, NE NE
660 South, 660 West, from NE corner
Longitude: -99.2939868
Latitude: 37.2643972
County: Comanche
Status: D&A
Spud Date: 24-MAY-00
Completion Date: 06-JUN-00
Plugging Date: 07-JUN-00
Total Depth: 5347
Form. at depth: MISSISSIPPIAN
Elevation: 2154 KB
Test Number: 1 Data Source: TRILOBITE
Interval: 4352 to 4385
Formation tested: Toronto
Date, Time: 31-MAY-00; 17:58:35
Initial Hydro Pressure: 2293 PSI
First Initial Flow Pressure: 633 PSI
First Final Flow Pressure: 673 PSI
Initial Shut-in Pressure: 2012 PSI
Second Initial Flow Pressure: 638 PSI
Second Final Flow Pressure: 688 PSI
Final Shut-in Pressure: 1860 PSI
Final Hydro Pressure: 2197 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 607.41 ft.
Drill Pipe Length: ft.
Initial Flow: Weak blow built to 1 1/2"" in H2O bucket. Initial Shut-In: Bled down for 30 seconds. No blow back
Final Flow: No blow.
Final Shut-In: No blow back.
Bottom Hole Temperature: 113 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
1100 of Total Fluid
607 of Fluid in Drill Collars
493 of Fluid in Drill Pipe
1100 of Drilling Mud
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 2 Data Source: TRILOBITE
Interval: 5090 to 5134
Formation tested: Pawnee
Date, Time: 03-JUN-00; 13:14:05
Initial Hydro Pressure: 2530 PSI
First Initial Flow Pressure: 37 PSI
First Final Flow Pressure: 69 PSI
Initial Shut-in Pressure: 1773 PSI
Second Initial Flow Pressure: 74 PSI
Second Final Flow Pressure: 101 PSI
Final Shut-in Pressure: 1713 PSI
Final Hydro Pressure: 2493 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 607.41 ft.
Drill Pipe Length: ft.
Initial Flow: Weak blow built to 1 1/4"" in H2O bucket. Initial Shut-In: Bled down for 30 seconds. No blow back.
Final Flow: Dead blow.
Final Shut-In: No blow back.
Bottom Hole Temperature: 124 DEG F
Percent Porosity:
Samples: Caraway Analytical
Gas Recovery:
Comments:
Recovery
130 of Total Fluid
130 of Fluid in Drill Collars
130 of Slightly mud cut water
38000 of Salinity (PPM)
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 3 Data Source: TRILOBITE
Interval: 5210 to 5232
Formation tested: Mississippi
Date, Time: 04-JUN-00; 15:06:28
Initial Hydro Pressure: 2596 PSI
First Initial Flow Pressure: 72 PSI
First Final Flow Pressure: 46 PSI
Initial Shut-in Pressure: 1138 PSI
Second Initial Flow Pressure: 30 PSI
Second Final Flow Pressure: 19 PSI
Final Shut-in Pressure: 959 PSI
Final Hydro Pressure: 2595 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 607.41 ft.
Drill Pipe Length: ft.
Initial Flow: Strong blow bottom of bucket in 15 seconds. Gas to surface in 6 minutes. Gauge gas. Initial Shut-In: Bled down for 10 minutes. No blow back.
Final Flow: Strong blow bottom of bucket in 10 seconds. Gauge gas.
Final Shut-In: Bled down for 5 minutes. No blow back
Bottom Hole Temperature: 124 DEG F
Percent Porosity:
Samples: Caraway analytical 728 N.Roosevelt
Gas Recovery:
Comments:
Recovery
10000 of Salinity (PPM)
View Pressures View Recovery Gas
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 4 Data Source: TRILOBITE
Interval: 5232 to 5252
Formation tested: Mississippi
Date, Time: 05-JUN-00; 12:41:55
Initial Hydro Pressure: 2690 PSI
First Initial Flow Pressure: 27 PSI
First Final Flow Pressure: 33 PSI
Initial Shut-in Pressure: 1740 PSI
Second Initial Flow Pressure: 19 PSI
Second Final Flow Pressure: 43 PSI
Final Shut-in Pressure: 1759 PSI
Final Hydro Pressure: 2590 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 607.41 ft.
Drill Pipe Length: ft.
Initial Flow: Fair blow bottom of bucket in 3 minutes. Initial Shut-In: Bled down for 3 minutes. No blow back
Final Flow: Strong blow bottom of bucket in 10 seconds.
Final Shut-In: Bled down for 5 minutes. No blow back
Bottom Hole Temperature: 127 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
65 of Total Fluid
65 of Fluid in Drill Collars
2234 of Gas in pipe.
65 of Slightly gas cut water mud
40000 of Salinity (PPM)
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.