Drill Stem Tests Database
Specific Well--15-033-21092
API: 15-033-21092
Operator: Samuel Gary Jr. and Assoc., Inc.
Field: Colter West
Lease: Jellison
Well 10-2
Location: T33S R19W, Sec. 10, NE SW NW NE
820 South, 2280 West, from NE corner
Longitude: -99.3709336
Latitude: 37.1907052
County: Comanche
Status: GAS
Spud Date: 23-MAY-00
Completion Date: 24-JUN-00
Plugging Date:
Total Depth: 5400
Form. at depth: MISSISSIPPIAN
Elevation: 2004 KB
Test Number: 1 Data Source: TRILOBITE
Interval: 5036 to 5120
Formation tested: Marmaton
Date, Time: 31-MAY-00; 17:11:42
Initial Hydro Pressure: 2410 PSI
First Initial Flow Pressure: 69 PSI
First Final Flow Pressure: 95 PSI
Initial Shut-in Pressure: 1835 PSI
Second Initial Flow Pressure: 76 PSI
Second Final Flow Pressure: 107 PSI
Final Shut-in Pressure: 1817 PSI
Final Hydro Pressure: 2382 PSI
Tool Data
Hole Size: 7.78 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 300 ft.
Drill Pipe Length: 4730 ft.
Initial Flow: Strong blow in 1 minute.
Final Flow: Strong blow gas to surface in 27 minutes.
Bottom Hole Temperature: 124 DEG F
Percent Porosity:
Samples: gas sample
Gas Recovery:
Comments:
Recovery
260 of Total Fluid
260 of Fluid in Drill Collars
260 of Gas cut mud
View Pressures View Recovery Gas
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 2 Data Source: TRILOBITE
Interval: 5240 to 5312
Formation tested: Mississippi
Date, Time: 01-JUN-00; 22:09:52
Initial Hydro Pressure: 2539 PSI
First Initial Flow Pressure: 33 PSI
First Final Flow Pressure: 45 PSI
Initial Shut-in Pressure: 1852 PSI
Second Initial Flow Pressure: 38 PSI
Second Final Flow Pressure: 38 PSI
Final Shut-in Pressure: 1873 PSI
Final Hydro Pressure: 2528 PSI
Tool Data
Hole Size: 7.78 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 300 ft.
Drill Pipe Length: 4940 ft.
Initial Flow: Strong blow throughout
Final Flow: Strong blow gas to surface in 3 minutes.
Final Shut-In: No blow.
Bottom Hole Temperature: 129 DEG F
Percent Porosity:
Samples: gas sample
Gas Recovery:
Comments:
Recovery
75 of Total Fluid
75 of Fluid in Drill Collars
75 of Gas cut mud
View Pressures View Recovery Gas
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.