Drill Stem Tests Database
Specific Well--15-033-21095
API: 15-033-21095
Operator: R. J. PATRICK OPERATING CO.
Field: Wildcat
Lease: Donald Herd
Well 2-10
Location: T33S R19W, Sec. 10, NE SE
1960 North, 700 West, from SE corner
Longitude: -99.3653139
Latitude: 37.1839025
County: Comanche
Status: O&G
Spud Date: 22-MAY-00
Completion Date: 14-JUN-00
Plugging Date:
Total Depth: 6136
Form. at depth: ARBUCKLE
Elevation: 2029 KB
Test Number: 1 Data Source: TRILOBITE
Interval: 5073 to 5086
Formation tested: Altamont
Date, Time: 30-MAY-00; 23:48:01
Initial Hydro Pressure: PSI
First Initial Flow Pressure: PSI
First Final Flow Pressure: PSI
Initial Shut-in Pressure: PSI
Second Initial Flow Pressure: PSI
Second Final Flow Pressure: PSI
Final Shut-in Pressure: PSI
Final Hydro Pressure: PSI
Tool Data
Hole Size: 7.875 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: ft.
Drill Pipe Length: 1100 ft.
IF:n/a ISI: FF:n/a FSI:
Bottom Hole Temperature: 121 DEG F
Percent Porosity: 10
Samples: None
Gas Recovery:
Comments:
Recovery
8000 of Salinity (PPM)
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 3 Data Source: TRILOBITE
Interval: 5088 to 5152
Formation tested: Pawnee
Date, Time: 01-JUN-00; 03:51:05
Initial Hydro Pressure: 2519 PSI
First Initial Flow Pressure: 48 PSI
First Final Flow Pressure: 60 PSI
Initial Shut-in Pressure: 1657 PSI
Second Initial Flow Pressure: 51 PSI
Second Final Flow Pressure: 68 PSI
Final Shut-in Pressure: 1776 PSI
Final Hydro Pressure: 2374 PSI
Tool Data
Hole Size: 7.875 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 120 ft.
Drill Pipe Length: 4949 ft.
Initial Flow: Strong blow. Bottom of bucket in 12 minutes. Initial Shut-In: No blow.
Final Flow: Strong blow. Bottom of bucket in 3-5 seconds.
Final Shut-In: No blow.
Bottom Hole Temperature: 120 DEG F
Percent Porosity: 9
Samples: None
Gas Recovery:
Comments:
Recovery
130 of Total Fluid
120 of Fluid in Drill Collars
10 of Fluid in Drill Pipe
310 of Gas in pipe.
130 of Heavy mud.
8000 of Salinity (PPM)
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 6 Data Source: TRILOBITE
Interval: 5363 to 5442
Formation tested: Mississippi
Date, Time: 04-JUN-00; 03:54:29
Initial Hydro Pressure: 2667 PSI
First Initial Flow Pressure: 55 PSI
First Final Flow Pressure: 72 PSI
Initial Shut-in Pressure: 1706 PSI
Second Initial Flow Pressure: 73 PSI
Second Final Flow Pressure: 114 PSI
Final Shut-in Pressure: 1701 PSI
Final Hydro Pressure: 2626 PSI
Tool Data
Hole Size: 7.875 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 120 ft.
Drill Pipe Length: 5233 ft.
Intial Flow: Strong blow. Bottom of bucket in 2-3 seconds. Initial Shut-In: No blow.
Final Flow: Strong blow. Gas to surface in 11 minutes. (see gas volume report)
Final Shut-In: Weak blow. 1/2 - 2"".
Bottom Hole Temperature: 126 DEG F
Percent Porosity: 10
Samples: none
Gas Recovery:
Comments:
Recovery
205 of Total Fluid
120 of Fluid in Drill Collars
85 of Fluid in Drill Pipe
85 of Slightly oil cut mud
120 of Slightly oil cut muddy water
87000 of Salinity (PPM)
View Pressures View Recovery Gas
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 2 Data Source: TRILOBITE
Interval: 5073 to 5086
Formation tested: Altamont
Date, Time: 31-MAY-00; 07:05:29
Initial Hydro Pressure: 2503 PSI
First Initial Flow Pressure: 26 PSI
First Final Flow Pressure: 23 PSI
Initial Shut-in Pressure: 354 PSI
Second Initial Flow Pressure: 22 PSI
Second Final Flow Pressure: 25 PSI
Final Shut-in Pressure: 671 PSI
Final Hydro Pressure: 2387 PSI
Tool Data
Hole Size: 7.875 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 120 ft.
Drill Pipe Length: 4951 ft.
Initial Flow: Fair to strong blow. Bottom of bucket in 29 minutes. Initial Shut-In: No blow.
Final Flow: Strong blow. Bottom of bucket in 8 minutes.
Final Shut-In: No blow.
Bottom Hole Temperature: 119 DEG F
Percent Porosity: 10
Samples: None
Gas Recovery:
Comments:
Recovery
20 of Total Fluid
20 of Fluid in Drill Collars
530 of Gas in pipe.
20 of Drilling mud
8000 of Salinity (PPM)
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 4 Data Source: TRILOBITE
Interval: 5150 to 5172
Formation tested: Ft.Scott
Date, Time: 01-JUN-00; 22:10:39
Initial Hydro Pressure: 2509 PSI
First Initial Flow Pressure: 19 PSI
First Final Flow Pressure: 21 PSI
Initial Shut-in Pressure: 1848 PSI
Second Initial Flow Pressure: 18 PSI
Second Final Flow Pressure: 22 PSI
Final Shut-in Pressure: 1864 PSI
Final Hydro Pressure: 2452 PSI
Tool Data
Hole Size: 7.875 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 120 ft.
Drill Pipe Length: 5010 ft.
Initial Flow: Strong blow. Bottom of bucket in 3 1/2 minutes. Initial Shut-In: No blow.
Final Flow. Strong blow. Bottom of bucket in 2 seconds. Gas to surface in 5 1/2 minutes. (See gas volume report).
Final Shut-In: No blow.
Bottom Hole Temperature: 116 DEG F
Percent Porosity: 12
Samples: Gas sample
Gas Recovery:
Comments:
Recovery
30 of Total Fluid
30 of Fluid in Drill Collars
30 of Drilling mud
8000 of Salinity (PPM)
View Pressures View Recovery Gas
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.