API: 15-033-21099
Operator: Crawford Oil and Gas Inc. Field: Buttermilk East Lease: Basnett Well 1 |
Location: T34S R18W, Sec. 10, NE NW NW
4667 North, 4168 West, from SE corner Longitude: -99.26635 Latitude: 37.10437 County: Comanche Status: GAS-P&A |
Spud Date: 07-JUL-00
Completion Date: 28-JUL-00 Plugging Date: 06-APR-04 Total Depth: 6100 Form. at depth: VIOLA Elevation: 1882 KB |
Test Number: 1 | Data Source: TRILOBITE |
Interval: 5289 to 5335
Formation tested: Mississippi | Date, Time: 16-JUL-00; 18:34:43 |
Initial Hydro Pressure: 2549 PSI
First Initial Flow Pressure: 304 PSI First Final Flow Pressure: 117 PSI Initial Shut-in Pressure: 1506 PSI Second Initial Flow Pressure: 144 PSI Second Final Flow Pressure: 144 PSI Final Shut-in Pressure: 1542 PSI Final Hydro Pressure: 2461 PSI |
Tool Data Hole Size: 7.875 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: ft. Drill Pipe Length: 5269 ft. |
Initial Flow: Strong blow. Gas to surface in 4 minutes. (see gas volume report) Initial Shut-In: No blow. Final Flow: Strong blow. (see gas volume report) Final Shut-In: No blow. |
|
Bottom Hole Temperature: 129 DEG F
Percent Porosity: 10 Samples: Gas sample Gas Recovery: Comments: | |
Recovery 195 of Total Fluid 195 of Fluid in Drill Pipe 105 of Drilling mud 90 of Muddy water 92000 of Salinity (PPM) | |
View Pressures | View Recovery Gas |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |
Test Number: 2 | Data Source: TRILOBITE |
Interval: 5945 to 5975
Formation tested: Viola | Date, Time: 19-JUL-00; 22:21:15 |
Initial Hydro Pressure: 2924 PSI
First Initial Flow Pressure: 12 PSI First Final Flow Pressure: 14 PSI Initial Shut-in Pressure: 490 PSI Second Initial Flow Pressure: 12 PSI Second Final Flow Pressure: 16 PSI Final Shut-in Pressure: 1845 PSI Final Hydro Pressure: 2877 PSI |
Tool Data Hole Size: 7.78 in. Drill Collar ID: in. Drill Pipe ID: 3.8 in. Drill Collar Length: ft. Drill Pipe Length: 5925 ft. |
Initial Flow: Weak building to a fair blow 1/2"" to 4"" throughout Final Flow: Strong blow throughout Final Shut-In: No blow |
|
Bottom Hole Temperature: 135 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
Recovery 5 of Total Fluid 5 of Fluid in Drill Pipe 120 of Gas in pipe 5 of Mud | |
View Pressures | No Recovery Gas data. |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |