Drill Stem Tests Database
Specific Well--15-055-21677
API: 15-055-21677
Operator: PetroSantander (USA) Inc.
Field: Wildcat
Lease: ALLEY TRUST
Well 1
Location: T23S R31W, Sec. 9, W2 W2 SE
1300 North, 2310 West, from SE corner
Longitude: -100.7266095
Latitude: 38.064586
County: Finney
Status: D&A
Spud Date: 20-MAY-00
Completion Date: 27-MAY-00
Plugging Date: 28-MAY-00
Total Depth: 4900
Form. at depth: MISSISSIPPIAN
Elevation: 2900 KB
Test Number: 1 Data Source: TRILOBITE
Interval: 4776 to 4824
Formation tested: Morrow
Date, Time: 27-MAY-00; 15:27:27
Initial Hydro Pressure: 2350 PSI
First Initial Flow Pressure: 26 PSI
First Final Flow Pressure: 37 PSI
Initial Shut-in Pressure: 625 PSI
Second Initial Flow Pressure: 36 PSI
Second Final Flow Pressure: 44 PSI
Final Shut-in Pressure: 519 PSI
Final Hydro Pressure: 2298 PSI
Tool Data
Hole Size: 7.875 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.5 in.
Drill Collar Length: 708 ft.
Drill Pipe Length: 4151 ft.
Initial Flow: 1/2"" @ open, died back to a weak surface blow. Initial Shut-In: No return.
Final Flow: No blow.
Final Shut-In: No return.
Bottom Hole Temperature: 118 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
15 of Total Fluid
15 of Fluid in Drill Collars
15 of Drilling mud
1500 of Salinity (PPM)
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.