API: 15-081-21308
Operator: HELMERICH & PAYNE Field: Wildcat Lease: Government 'B' Well 4 |
Location: T27S R34W, Sec. 12, SE SW NE SE
1595 North, 824 West, from SE corner Longitude: -100.9826314 Latitude: 37.7119654 County: Haskell Status: OIL-P&A |
Spud Date: 11-AUG-00
Completion Date: 18-OCT-00 Plugging Date: 17-APR-24 Total Depth: 5359 Form. at depth: ST LOUIS Elevation: 2959 KB |
elogs marked 1680' FSL - SKS 3/14/2002 |
Test Number: 1 | Data Source: TRILOBITE |
Interval: 4992 to 5070
Formation tested: Morrow sand | Date, Time: 17-AUG-00; 17:15:25 |
Initial Hydro Pressure: 2362 PSI
First Initial Flow Pressure: 23 PSI First Final Flow Pressure: 114 PSI Initial Shut-in Pressure: 1301 PSI Second Initial Flow Pressure: 99 PSI Second Final Flow Pressure: 215 PSI Final Shut-in Pressure: 1318 PSI Final Hydro Pressure: 2321 PSI |
Tool Data Hole Size: 7.78 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 711 ft. Drill Pipe Length: 4273 ft. |
Initial Flow: Weak blow built to 3"" in bucket in 15 minutes. Initial Shut-In: No blow back. Final Flow: Weak blow built to 3"" in bucket in 60 minutes. Final Shut-In: No blow back. |
|
Bottom Hole Temperature: 119 DEG F
Percent Porosity: Samples: None caught. Gas Recovery: Comments: | |
Recovery 390 of Total Fluid 390 of Fluid in Drill Collars 150 of Drilling mud 240 of Gassy oil cut mud 1200 of Salinity (PPM) | |
View Pressures | No Recovery Gas data. |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |
Test Number: 2 | Data Source: TRILOBITE |
Interval: 5073 to 5220
Formation tested: Morrow/Chester | Date, Time: 18-AUG-00; 00:08:02 |
Initial Hydro Pressure: 2418 PSI
First Initial Flow Pressure: 46 PSI First Final Flow Pressure: 200 PSI Initial Shut-in Pressure: 1373 PSI Second Initial Flow Pressure: 251 PSI Second Final Flow Pressure: 472 PSI Final Shut-in Pressure: 1349 PSI Final Hydro Pressure: 2352 PSI |
Tool Data Hole Size: 7.78 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 711 ft. Drill Pipe Length: 4364 ft. |
Initial Flow: Fair blow built to bottom of bucket in 13 minutes. Initial Shut-In: No blow back. Final Flow: Fair blow built to strong blow bottom of bucket in 28 minutes. Final Shut-In: No blow back. |
|
Bottom Hole Temperature: 121 DEG F
Percent Porosity: Samples: None caught. Gas Recovery: Comments: | |
Recovery 960 of Total Fluid 710 of Fluid in Drill Collars 250 of Fluid in Drill Pipe 780 of Drilling mud 180 of Gassy slightly oil cut mud 2400 of Salinity (PPM) | |
View Pressures | No Recovery Gas data. |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |