API: 15-081-21314
Operator: Trees Oil Inc. Field: Satanta East Lease: GRACE Well 22 |
Location: T30S R34W, Sec. 22, N2 NW NW
4950 North, 4620 West, from SE corner Longitude: -101.0321527 Latitude: 37.4305444 County: Haskell Status: OIL-P&A |
Spud Date: 28-JUN-00
Completion Date: 21-AUG-00 Plugging Date: 10-JUL-14 Total Depth: 5916 Form. at depth: ST LOUIS Elevation: 2967 KB |
Test Number: 1 | Data Source: TRILOBITE |
Interval: 5305 to 5345
Formation tested: Upper Morrow | Date, Time: 09-JUL-00; 02:43:12 |
Initial Hydro Pressure: 2485 PSI
First Initial Flow Pressure: 376 PSI First Final Flow Pressure: 698 PSI Initial Shut-in Pressure: 1484 PSI Second Initial Flow Pressure: 750 PSI Second Final Flow Pressure: 1185 PSI Final Shut-in Pressure: 1501 PSI Final Hydro Pressure: 2459 PSI |
Tool Data Hole Size: 7.78 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 305 ft. Drill Pipe Length: 5005 ft. |
Initial Flow: Strong bottom of bucket in 2 minutes. Initial Shut-In: No blow back. Final Flow: Strong bottom of bucket in 3 minutes. Final Shut-In: No blow back. Remarks: Est. 25 Ft. of Pay. |
|
Bottom Hole Temperature: 136 DEG F
Percent Porosity: 15 Samples: None Gas Recovery: Comments: | |
Recovery 2375 of Total Fluid 305 of Fluid in Drill Collars 2070 of Fluid in Drill Pipe 35 of Heavy mud cut water w/ scum of oil 250 of Mud cut water w/ specks of oil 2090 of Gassy water 63500 of Salinity (PPM) | |
View Pressures | No Recovery Gas data. |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |
Test Number: 2 | Data Source: TRILOBITE |
Interval: 5478 to 5500
Formation tested: Lower Morrow | Date, Time: 10-JUL-00; 16:27:06 |
Initial Hydro Pressure: 2545 PSI
First Initial Flow Pressure: 354 PSI First Final Flow Pressure: 446 PSI Initial Shut-in Pressure: 1600 PSI Second Initial Flow Pressure: 441 PSI Second Final Flow Pressure: 566 PSI Final Shut-in Pressure: 1619 PSI Final Hydro Pressure: 2538 PSI |
Tool Data Hole Size: 7.78 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 305 ft. Drill Pipe Length: 5159 ft. |
Initial Flow: Strong bottom of bucket in 2 minutes. ""Packers leaking slowly"" Approximately 30' to 40' of mud Initial Shut-In: No blow back. Final Flow: Weak 2"" built to strong bottom of bucket in 5 minutes. ""Packers leaking slowly"" Approximately 10' of mud. Final Shut-In: No blow back. |
|
Bottom Hole Temperature: 134 DEG F
Percent Porosity: 12 Samples: None Gas Recovery: Comments: | |
Recovery 1100 of Total Fluid 305 of Fluid in Drill Collars 795 of Fluid in Drill Pipe 185 of Mud 330 of Gassy water cut mud 585 of Slightly mud cut gassy water 48000 of Salinity (PPM) | |
View Pressures | No Recovery Gas data. |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |
Test Number: 3 | Data Source: TRILOBITE |
Interval: 5710 to 5728
Formation tested: Basal Chester | Date, Time: 13-JUL-00; 07:03:06 |
Initial Hydro Pressure: 2688 PSI
First Initial Flow Pressure: 27 PSI First Final Flow Pressure: 77 PSI Initial Shut-in Pressure: 1600 PSI Second Initial Flow Pressure: 68 PSI Second Final Flow Pressure: 158 PSI Final Shut-in Pressure: 1599 PSI Final Hydro Pressure: 2647 PSI |
Tool Data Hole Size: 7.78 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 305 ft. Drill Pipe Length: 5405 ft. |
Initial Flow: Weak 1/2"" built to strong bottom of bucket in 5 minutes. Cracked 2"" Initial Shut-In: 1"" blow back. Final Flow: Strong bottom of bucket in 30 seconds Gas to surface in 8 minutes. Gauged 34,700 decreasing to 20,900 CFPD in 55 minutes. Final 5 minutes of flow shut 2"" to pressure up gas bottle. Final Shut-In: Strong bottom of bucket blow back. |
|
Bottom Hole Temperature: 139 DEG F
Percent Porosity: 12 Samples: One Gas Recovery: Comments: | |
Recovery 435 of Total Fluid 305 of Fluid in Drill Collars 130 of Fluid in Drill Pipe 5275 of Gas in pipe. 310 of Clean gassy oil 65 of Watery mud cut gassy oil 60 of Slightly oil cut muddy water 30500 of Salinity (PPM) 42 of Gravity (API) | |
View Pressures | View Recovery Gas |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |