Drill Stem Tests Database
Specific Well--15-081-21314
API: 15-081-21314
Operator: Trees Oil Inc.
Field: Satanta East
Lease: GRACE
Well 22
Location: T30S R34W, Sec. 22, N2 NW NW
4950 North, 4620 West, from SE corner
Longitude: -101.0321527
Latitude: 37.4305444
County: Haskell
Status: OIL-P&A
Spud Date: 28-JUN-00
Completion Date: 21-AUG-00
Plugging Date: 10-JUL-14
Total Depth: 5916
Form. at depth: ST LOUIS
Elevation: 2967 KB
Test Number: 1 Data Source: TRILOBITE
Interval: 5305 to 5345
Formation tested: Upper Morrow
Date, Time: 09-JUL-00; 02:43:12
Initial Hydro Pressure: 2485 PSI
First Initial Flow Pressure: 376 PSI
First Final Flow Pressure: 698 PSI
Initial Shut-in Pressure: 1484 PSI
Second Initial Flow Pressure: 750 PSI
Second Final Flow Pressure: 1185 PSI
Final Shut-in Pressure: 1501 PSI
Final Hydro Pressure: 2459 PSI
Tool Data
Hole Size: 7.78 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 305 ft.
Drill Pipe Length: 5005 ft.
Initial Flow: Strong bottom of bucket in 2 minutes. Initial Shut-In: No blow back.
Final Flow: Strong bottom of bucket in 3 minutes.
Final Shut-In: No blow back. Remarks: Est. 25 Ft. of Pay.
Bottom Hole Temperature: 136 DEG F
Percent Porosity: 15
Samples: None
Gas Recovery:
Comments:
Recovery
2375 of Total Fluid
305 of Fluid in Drill Collars
2070 of Fluid in Drill Pipe
35 of Heavy mud cut water w/ scum of oil
250 of Mud cut water w/ specks of oil
2090 of Gassy water
63500 of Salinity (PPM)
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 2 Data Source: TRILOBITE
Interval: 5478 to 5500
Formation tested: Lower Morrow
Date, Time: 10-JUL-00; 16:27:06
Initial Hydro Pressure: 2545 PSI
First Initial Flow Pressure: 354 PSI
First Final Flow Pressure: 446 PSI
Initial Shut-in Pressure: 1600 PSI
Second Initial Flow Pressure: 441 PSI
Second Final Flow Pressure: 566 PSI
Final Shut-in Pressure: 1619 PSI
Final Hydro Pressure: 2538 PSI
Tool Data
Hole Size: 7.78 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 305 ft.
Drill Pipe Length: 5159 ft.
Initial Flow: Strong bottom of bucket in 2 minutes. ""Packers leaking slowly"" Approximately 30' to 40' of mud Initial Shut-In: No blow back.
Final Flow: Weak 2"" built to strong bottom of bucket in 5 minutes. ""Packers leaking slowly"" Approximately 10' of mud.
Final Shut-In: No blow back.
Bottom Hole Temperature: 134 DEG F
Percent Porosity: 12
Samples: None
Gas Recovery:
Comments:
Recovery
1100 of Total Fluid
305 of Fluid in Drill Collars
795 of Fluid in Drill Pipe
185 of Mud
330 of Gassy water cut mud
585 of Slightly mud cut gassy water
48000 of Salinity (PPM)
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 3 Data Source: TRILOBITE
Interval: 5710 to 5728
Formation tested: Basal Chester
Date, Time: 13-JUL-00; 07:03:06
Initial Hydro Pressure: 2688 PSI
First Initial Flow Pressure: 27 PSI
First Final Flow Pressure: 77 PSI
Initial Shut-in Pressure: 1600 PSI
Second Initial Flow Pressure: 68 PSI
Second Final Flow Pressure: 158 PSI
Final Shut-in Pressure: 1599 PSI
Final Hydro Pressure: 2647 PSI
Tool Data
Hole Size: 7.78 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 305 ft.
Drill Pipe Length: 5405 ft.
Initial Flow: Weak 1/2"" built to strong bottom of bucket in 5 minutes. Cracked 2"" Initial Shut-In: 1"" blow back.
Final Flow: Strong bottom of bucket in 30 seconds Gas to surface in 8 minutes. Gauged 34,700 decreasing to 20,900 CFPD in 55 minutes.
Final 5 minutes of flow shut 2"" to pressure up gas bottle.
Final Shut-In: Strong bottom of bucket blow back.
Bottom Hole Temperature: 139 DEG F
Percent Porosity: 12
Samples: One
Gas Recovery:
Comments:
Recovery
435 of Total Fluid
305 of Fluid in Drill Collars
130 of Fluid in Drill Pipe
5275 of Gas in pipe.
310 of Clean gassy oil
65 of Watery mud cut gassy oil
60 of Slightly oil cut muddy water
30500 of Salinity (PPM)
42 of Gravity (API)
View Pressures View Recovery Gas
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.