Drill Stem Tests Database
Specific Well--15-129-21604
API: 15-129-21604
Operator: PIONEER OIL COMPANY, INC.
Field: Richfield
Lease: Speakman
Well 1-126
Location: T32S R40W, Sec. 26, N2 NE NE
330 South, 660 West, from NE corner
Longitude: -101.6302293
Latitude: 37.2424794
County: Morton
Status: D&A
Spud Date: 19-JUN-00
Completion Date: 06-JUL-00
Plugging Date: 06-JUL-00
Total Depth: 6183
Form. at depth: MISSISSIPPIAN
Elevation: 3260 KB
Test Number: 1 Data Source: TRILOBITE
Interval: 5827 to 5842
Formation tested: Lower Morrow
Date, Time: 02-JUL-00; 10:44:19
Initial Hydro Pressure: 2700 PSI
First Initial Flow Pressure: PSI
First Final Flow Pressure: PSI
Initial Shut-in Pressure: PSI
Second Initial Flow Pressure: PSI
Second Final Flow Pressure: PSI
Final Shut-in Pressure: PSI
Final Hydro Pressure: 2689 PSI
Tool Data
Hole Size: 7.78 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.38 in.
Drill Collar Length: 548 ft.
Drill Pipe Length: 5254 ft.
MISRUN!! Too much fill. Could not get to bottom. Approximately 27' fill. Tool slid about 15'. pulled loose 50,000 over string. Tore both packers
Bottom Hole Temperature: DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
110 of Total Fluid
110 of Fluid in Drill Collars
110 of Mud
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 3 Data Source: TRILOBITE
Interval: 5728 to 5807
Formation tested: Morrow
Date, Time: 05-JUL-00; 14:28:01
Initial Hydro Pressure: 2721 PSI
First Initial Flow Pressure: 29 PSI
First Final Flow Pressure: 52 PSI
Initial Shut-in Pressure: 1271 PSI
Second Initial Flow Pressure: 49 PSI
Second Final Flow Pressure: 87 PSI
Final Shut-in Pressure: 1358 PSI
Final Hydro Pressure: 2670 PSI
Tool Data
Hole Size: 7.78 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.38 in.
Drill Collar Length: 639 ft.
Drill Pipe Length: 5485 ft.
Initial Flow: Weak blow built to 5"". Initial Shut-In: No blow back.
Final Flow: 6 1/2"" blow died back to weak surface blow. built back to 2"".
Final Shut-In: No blow back.
Bottom Hole Temperature: 140 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
115 of Total Fluid
115 of Fluid in Drill Collars
115 of Mud
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.