Drill Stem Tests Database
Specific Well--15-129-21604
API: 15-129-21604
Operator: PIONEER OIL COMPANY, INC.
Field: Richfield
Lease: Speakman
Well 1-126
Location: T32S R40W, Sec. 26, N2 NE NE
330 South, 660 West, from NE corner
Longitude: -101.6302293
Latitude: 37.2424794
County: Morton
Status: D&A
Spud Date: 06/19/2000
Completion Date: 07/06/2000
Plugging Date: 07/06/2000
Total Depth: 6183
Form. at depth: MISSISSIPPIAN
Elevation: 3260 KB

Download DST Test Data

Test Number: 1 Data Source: TRILOBITE
Interval: 5827 to 5842
Formation tested: Lower Morrow
Date, Time: 07/02/2000; 10:44:19
Initial Hydro Pressure: 2700 PSI
First Initial Flow Pressure: PSI
First Final Flow Pressure: PSI
Initial Shut-in Pressure: PSI
Second Initial Flow Pressure: PSI
Second Final Flow Pressure: PSI
Final Shut-in Pressure: PSI
Final Hydro Pressure: 2689 PSI
Tool Data
Hole Size: 7.78 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.38 in.
Drill Collar Length: 548 ft.
Drill Pipe Length: 5254 ft.
MISRUN!! Too much fill. Could not get to bottom. Approximately 27' fill. Tool slid about 15'. pulled loose 50,000 over string. Tore both packers
Bottom Hole Temperature: DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
110 of Total Fluid
110 of Fluid in Drill Collars
110 of Mud
View Pressures No Recovery Gas data.
 
Test Number: 3 Data Source: TRILOBITE
Interval: 5728 to 5807
Formation tested: Morrow
Date, Time: 07/05/2000; 14:28:01
Initial Hydro Pressure: 2721 PSI
First Initial Flow Pressure: 29 PSI
First Final Flow Pressure: 52 PSI
Initial Shut-in Pressure: 1271 PSI
Second Initial Flow Pressure: 49 PSI
Second Final Flow Pressure: 87 PSI
Final Shut-in Pressure: 1358 PSI
Final Hydro Pressure: 2670 PSI
Tool Data
Hole Size: 7.78 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.38 in.
Drill Collar Length: 639 ft.
Drill Pipe Length: 5485 ft.
Initial Flow: Weak blow built to 5"". Initial Shut-In: No blow back.
Final Flow: 6 1/2"" blow died back to weak surface blow. built back to 2"".
Final Shut-In: No blow back.
Bottom Hole Temperature: 140 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
115 of Total Fluid
115 of Fluid in Drill Collars
115 of Mud
View Pressures No Recovery Gas data.