Drill Stem Tests Database
Specific Well--15-137-20415
API: 15-137-20415
Operator: Thoroughbred Associates, L.L.C.
Field:
Lease: Kemper
Well 1
Location: T5S R21W, Sec. 14, NE SW SW
990 North, 990 East, from SW corner
Longitude: -99.661608
Latitude: 39.6134218
County: Norton
Status: D&A
Spud Date: 29-MAY-00
Completion Date: 09-JUN-00
Plugging Date: 09-JUN-00
Total Depth: 3583
Form. at depth: ARBUCKLE
Elevation: 2137 KB
Test Number: 1 Data Source: TRILOBITE
Interval: 3518 to 3583
Formation tested: Basal sd.
Date, Time: 09-JUN-00; 04:22:07
Initial Hydro Pressure: 1770 PSI
First Initial Flow Pressure: 19 PSI
First Final Flow Pressure: 46 PSI
Initial Shut-in Pressure: 1052 PSI
Second Initial Flow Pressure: 49 PSI
Second Final Flow Pressure: 66 PSI
Final Shut-in Pressure: 1037 PSI
Final Hydro Pressure: 1748 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 521.38 ft.
Drill Pipe Length: ft.
Initial Flow: Weak blow built to 1"" in H2O bucket. Initial Shut-In: Bled down for 3 minutes. No blow back
Final Flow: Very weak surface blow 1/8"" to 1/4"" in H2O bucket.
Final Shut-In: Bled down for 30 seconds. No blow back.
Bottom Hole Temperature: 103 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
90 of Total Fluid
90 of Fluid in Drill Collars
90 of Drilling mud
View Pressures No Recovery Gas data.