|
API: 15-155-21442
Operator: Honey Oil Co., Inc. Field: Beck East Lease: McGonigle Well 1 |
Location: T23S R8W, Sec. 19, NE NW NE SE
2313 North, 743 West, from SE corner Longitude: -98.2366 Latitude: 38.03458 County: Reno Status: OIL-P&A |
Spud Date: 18-MAY-00
Completion Date: 24-MAY-00 Plugging Date: 23-JUL-12 Total Depth: 3816 Form. at depth: MISSISSIPPIAN Elevation: 1685 KB |
| Test Number: 1 | Data Source: TRILOBITE |
|
Interval: 3675 to 3725
Formation tested: Conglomerate | Date, Time: 23-MAY-00; 13:17:06 |
|
Initial Hydro Pressure: 1798 PSI
First Initial Flow Pressure: 43 PSI First Final Flow Pressure: 84 PSI Initial Shut-in Pressure: 1157 PSI Second Initial Flow Pressure: 77 PSI Second Final Flow Pressure: 140 PSI Final Shut-in Pressure: 1180 PSI Final Hydro Pressure: 1774 PSI |
Tool Data Hole Size: 7.8 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: ft. Drill Pipe Length: 3690 ft. |
|
Initial Flow: Strong blow - bottom of bucket in 50 seconds Gas to surface in 18 minutes. Initial Shutin: Bled down for 10 minutes. No blow back. Final Flow: Strong blow - bottom of bucket in 15 seconds - gauged gas Final Shutin: Bled down for 5 minutes built back to bottom of bucket in 2 minutes |
|
|
Bottom Hole Temperature: 1140 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
|
Recovery 395 of Total Fluid 395 of Fluid in Drill Pipe 3265 of Gas in pipe 120 of Oil & Gas cut mud 275 of Heavy Oil & gas cut mud | |
| View Pressures | View Recovery Gas |