|
API: 15-187-20934
Operator: Berexco, Inc. Field: Beauchamp Lease: G&G Well 4 |
Location: T30S R41W, Sec. 21, NE SE SE
888 North, 389 West, from SE corner Longitude: -101.7994891 Latitude: 37.42047 County: Stanton Status: GAS |
Spud Date: 20-JUL-00
Completion Date: 08-SEP-00 Plugging Date: Total Depth: 5600 Form. at depth: ST LOUIS Elevation: 3397 KB |
| Elog headers have Nov. 1999 date, but plot dates on logs say Aug. 2000. | ||
| Test Number: 1 | Data Source: TRILOBITE |
|
Interval: 5068 to 5097
Formation tested: Upper Morrow | Date, Time: 28-JUL-00; 23:58:17 |
|
Initial Hydro Pressure: 2435 PSI
First Initial Flow Pressure: 20 PSI First Final Flow Pressure: 25 PSI Initial Shut-in Pressure: 1174 PSI Second Initial Flow Pressure: 19 PSI Second Final Flow Pressure: 37 PSI Final Shut-in Pressure: 1173 PSI Final Hydro Pressure: 2405 PSI |
Tool Data Hole Size: 7.78 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 369 ft. Drill Pipe Length: 4693 ft. |
|
Initial Flow: Strong bottom of bucket immediately. Cracked 2"" slightly. Initial Shut-In: No blow back. Final Flow: Strong bottom of bucket immediately. Gas to surface in 6 minutes. Gauged 53,300 building to 121,000 CFPD in 90 minutes. Final Shut-In: No blow back. Gas burned. |
|
|
Bottom Hole Temperature: 112 DEG F
Percent Porosity: 22 Samples: One Gas Recovery: Comments: | |
|
Recovery 20 of Total Fluid 20 of Fluid in Drill Collars 5042 of Gas in pipe 20 of Mud | |
| View Pressures | View Recovery Gas |