Drill Stem Tests Database
Specific Well--15-051-25025
API: 15-051-25025
Operator: Murfin Drilling Co., Inc
Field: Mendota
Lease: Sterling-Fischer
Well 1-5
Location: T11S R20W, Sec. 5, W2 NE SW
2006 North, 3723 West, from SE corner
Longitude: -99.5679104
Latitude: 39.1225509
County: Ellis
Status: OIL
Spud Date: 08-APR-00
Completion Date: 06-MAY-00
Plugging Date:
Total Depth: 3750
Form. at depth: ARBUCKLE
Elevation: 2060 KB
Test Number: 1 Data Source: TRILOBITE
Interval: 3112 to 3128
Formation tested: Topeka
Date, Time: 11-APR-00; 22:00:12
Initial Hydro Pressure: 1474 PSI
First Initial Flow Pressure: 16 PSI
First Final Flow Pressure: 35 PSI
Initial Shut-in Pressure: 852 PSI
Second Initial Flow Pressure: 38 PSI
Second Final Flow Pressure: 72 PSI
Final Shut-in Pressure: 847 PSI
Final Hydro Pressure: 1470 PSI
Tool Data
Hole Size: 7.78 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 240 ft.
Drill Pipe Length: 2885 ft.
Initial Flow: Weak blow throughout. 1/2"" to 1 1/4"" blow.
Final Flow: Weak 1"" blow throughout.
Bottom Hole Temperature: 102 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
125 of Total Fluid
125 of Fluid in Drill Collars
10 of Clean oil
115 of Slightly oil cut muddy water
150000 of Salinity (PPM)
32 of Gravity (API)
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 2 Data Source: TRILOBITE
Interval: 3245 to 3260
Formation tested: Topeka Plattsmouth
Date, Time: 12-APR-00; 16:00:54
Initial Hydro Pressure: 1551 PSI
First Initial Flow Pressure: 25 PSI
First Final Flow Pressure: 87 PSI
Initial Shut-in Pressure: 951 PSI
Second Initial Flow Pressure: 98 PSI
Second Final Flow Pressure: 154 PSI
Final Shut-in Pressure: 957 PSI
Final Hydro Pressure: 1501 PSI
Tool Data
Hole Size: 7.78 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 240 ft.
Drill Pipe Length: 3012 ft.
Initial Flow: Weak to a fair blow. 1/2"" to 5 1/2"" blow.
Final Flow: Fair to a good blow. 5"" to 6"" blow.
Final Shut-In: Had blow.
Bottom Hole Temperature: 109 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
310 of Total Fluid
240 of Fluid in Drill Collars
70 of Fluid in Drill Pipe
40 of Clean oil
30 of Slightly oil cut muddy water
240 of Water
150000 of Salinity (PPM)
34 of Gravity (API)
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 3 Data Source: TRILOBITE
Interval: 3295 to 3404
Formation tested: Toronto&Lans.A,B,C,D
Date, Time: 13-APR-00; 11:28:09
Initial Hydro Pressure: 1574 PSI
First Initial Flow Pressure: 16 PSI
First Final Flow Pressure: 24 PSI
Initial Shut-in Pressure: 675 PSI
Second Initial Flow Pressure: 25 PSI
Second Final Flow Pressure: 29 PSI
Final Shut-in Pressure: 612 PSI
Final Hydro Pressure: 1517 PSI
Tool Data
Hole Size: 7.78 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 240 ft.
Drill Pipe Length: 3042 ft.
Initial Flow: Weak blow throughout 1/4"" blow.
Final Flow: No blow.
Bottom Hole Temperature: 97 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
30 of Total Fluid
30 of Fluid in Drill Collars
30 of Mud with show of oil in tool
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 4 Data Source: TRILOBITE
Interval: 3404 to 3440
Formation tested: Lans. F&G
Date, Time: 14-APR-00; 02:09:18
Initial Hydro Pressure: 1680 PSI
First Initial Flow Pressure: 23 PSI
First Final Flow Pressure: 120 PSI
Initial Shut-in Pressure: 716 PSI
Second Initial Flow Pressure: 127 PSI
Second Final Flow Pressure: 192 PSI
Final Shut-in Pressure: 682 PSI
Final Hydro Pressure: 1599 PSI
Tool Data
Hole Size: 7.78 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 240 ft.
Drill Pipe Length: 3164 ft.
Initial Flow: Weak to a strong blow in 12 minutes.
Final Flow: Fair to a strong blow in 8 minutes.
Final Shut-In: Had blow back.
Bottom Hole Temperature: 110 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
420 of Total Fluid
240 of Fluid in Drill Collars
180 of Fluid in Drill Pipe
840 of Gas in pipe.
180 of Clean oil
240 of Muddy gassy oil
38 of Gravity (API)
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 5 Data Source: TRILOBITE
Interval: 3454 to 3550
Formation tested: Lans. H-L
Date, Time: 14-APR-00; 20:15:26
Initial Hydro Pressure: 1677 PSI
First Initial Flow Pressure: 33 PSI
First Final Flow Pressure: 232 PSI
Initial Shut-in Pressure: 936 PSI
Second Initial Flow Pressure: 244 PSI
Second Final Flow Pressure: 391 PSI
Final Shut-in Pressure: 830 PSI
Final Hydro Pressure: 1679 PSI
Tool Data
Hole Size: 7.78 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 240 ft.
Drill Pipe Length: 3194 ft.
Initial Flow: Weak to a strong blow in 8 minutes.
Final Flow: Weak to a strong blow in 25 minutes.
Final Shut-In: Had a weak blow back.
Bottom Hole Temperature: 113 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
960 of Total Fluid
240 of Fluid in Drill Collars
720 of Fluid in Drill Pipe
120 of Gas in pipe
180 of Clean oil
540 of Gassy mud & water cut oil
240 of Slightly oil & gas cut water
90000 of Salinity (PPM)
40 of Gravity (API)
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 6 Data Source: TRILOBITE
Interval: 3642 to 3654
Formation tested: Arbuckle
Date, Time: 15-APR-00; 14:34:45
Initial Hydro Pressure: 1786 PSI
First Initial Flow Pressure: 429 PSI
First Final Flow Pressure: 721 PSI
Initial Shut-in Pressure: 1111 PSI
Second Initial Flow Pressure: 697 PSI
Second Final Flow Pressure: 927 PSI
Final Shut-in Pressure: 1101 PSI
Final Hydro Pressure: 1750 PSI
Tool Data
Hole Size: 7.78 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 240 ft.
Drill Pipe Length: 3412 ft.
Initial Flow: Strong blow in 1 minute.
Final Flow: Strong blow in 3 minutes.
Final Shut-In: Had blow back.
Bottom Hole Temperature: 119 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
2500 of Total Fluid
240 of Fluid in Drill Collars
2260 of Fluid in Drill Pipe
180 of Gas in pipe.
2500 of Clean oil
26 of Gravity (API)
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 7 Data Source: TRILOBITE
Interval: 3657 to 3669
Formation tested: Arbuckle
Date, Time: 16-APR-00; 04:51:03
Initial Hydro Pressure: 1745 PSI
First Initial Flow Pressure: 50 PSI
First Final Flow Pressure: 265 PSI
Initial Shut-in Pressure: 1136 PSI
Second Initial Flow Pressure: 268 PSI
Second Final Flow Pressure: 412 PSI
Final Shut-in Pressure: 1141 PSI
Final Hydro Pressure: 1725 PSI
Tool Data
Hole Size: 7.78 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 240 ft.
Drill Pipe Length: 3414 ft.
Initial Flow: Strong blow in 5 minutes.
Final Flow: Weak to a strong blow in 10 minutes.
Final Shut-In: Had blow back.
Bottom Hole Temperature: 107 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
1080 of Total Fluid
240 of Fluid in Drill Collars
840 of Fluid in Drill Pipe
120 of Gas in pipe
1080 of Clean oil
26 of Gravity (API)
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.