API: 15-051-25025
Operator: Murfin Drilling Co., Inc Field: Mendota Lease: Sterling-Fischer Well 1-5 |
Location: T11S R20W, Sec. 5, W2 NE SW
2006 North, 3723 West, from SE corner Longitude: -99.5679104 Latitude: 39.1225509 County: Ellis Status: OIL |
Spud Date: 08-APR-00
Completion Date: 06-MAY-00 Plugging Date: Total Depth: 3750 Form. at depth: ARBUCKLE Elevation: 2060 KB |
Test Number: 1 | Data Source: TRILOBITE |
Interval: 3112 to 3128
Formation tested: Topeka | Date, Time: 11-APR-00; 22:00:12 |
Initial Hydro Pressure: 1474 PSI
First Initial Flow Pressure: 16 PSI First Final Flow Pressure: 35 PSI Initial Shut-in Pressure: 852 PSI Second Initial Flow Pressure: 38 PSI Second Final Flow Pressure: 72 PSI Final Shut-in Pressure: 847 PSI Final Hydro Pressure: 1470 PSI |
Tool Data Hole Size: 7.78 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 240 ft. Drill Pipe Length: 2885 ft. |
Initial Flow: Weak blow throughout. 1/2"" to 1 1/4"" blow. Final Flow: Weak 1"" blow throughout. |
|
Bottom Hole Temperature: 102 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
Recovery 125 of Total Fluid 125 of Fluid in Drill Collars 10 of Clean oil 115 of Slightly oil cut muddy water 150000 of Salinity (PPM) 32 of Gravity (API) | |
View Pressures | No Recovery Gas data. |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |
Test Number: 2 | Data Source: TRILOBITE |
Interval: 3245 to 3260
Formation tested: Topeka Plattsmouth | Date, Time: 12-APR-00; 16:00:54 |
Initial Hydro Pressure: 1551 PSI
First Initial Flow Pressure: 25 PSI First Final Flow Pressure: 87 PSI Initial Shut-in Pressure: 951 PSI Second Initial Flow Pressure: 98 PSI Second Final Flow Pressure: 154 PSI Final Shut-in Pressure: 957 PSI Final Hydro Pressure: 1501 PSI |
Tool Data Hole Size: 7.78 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 240 ft. Drill Pipe Length: 3012 ft. |
Initial Flow: Weak to a fair blow. 1/2"" to 5 1/2"" blow. Final Flow: Fair to a good blow. 5"" to 6"" blow. Final Shut-In: Had blow. |
|
Bottom Hole Temperature: 109 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
Recovery 310 of Total Fluid 240 of Fluid in Drill Collars 70 of Fluid in Drill Pipe 40 of Clean oil 30 of Slightly oil cut muddy water 240 of Water 150000 of Salinity (PPM) 34 of Gravity (API) | |
View Pressures | No Recovery Gas data. |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |
Test Number: 3 | Data Source: TRILOBITE |
Interval: 3295 to 3404
Formation tested: Toronto&Lans.A,B,C,D | Date, Time: 13-APR-00; 11:28:09 |
Initial Hydro Pressure: 1574 PSI
First Initial Flow Pressure: 16 PSI First Final Flow Pressure: 24 PSI Initial Shut-in Pressure: 675 PSI Second Initial Flow Pressure: 25 PSI Second Final Flow Pressure: 29 PSI Final Shut-in Pressure: 612 PSI Final Hydro Pressure: 1517 PSI |
Tool Data Hole Size: 7.78 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 240 ft. Drill Pipe Length: 3042 ft. |
Initial Flow: Weak blow throughout 1/4"" blow. Final Flow: No blow. |
|
Bottom Hole Temperature: 97 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
Recovery 30 of Total Fluid 30 of Fluid in Drill Collars 30 of Mud with show of oil in tool | |
View Pressures | No Recovery Gas data. |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |
Test Number: 4 | Data Source: TRILOBITE |
Interval: 3404 to 3440
Formation tested: Lans. F&G | Date, Time: 14-APR-00; 02:09:18 |
Initial Hydro Pressure: 1680 PSI
First Initial Flow Pressure: 23 PSI First Final Flow Pressure: 120 PSI Initial Shut-in Pressure: 716 PSI Second Initial Flow Pressure: 127 PSI Second Final Flow Pressure: 192 PSI Final Shut-in Pressure: 682 PSI Final Hydro Pressure: 1599 PSI |
Tool Data Hole Size: 7.78 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 240 ft. Drill Pipe Length: 3164 ft. |
Initial Flow: Weak to a strong blow in 12 minutes. Final Flow: Fair to a strong blow in 8 minutes. Final Shut-In: Had blow back. |
|
Bottom Hole Temperature: 110 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
Recovery 420 of Total Fluid 240 of Fluid in Drill Collars 180 of Fluid in Drill Pipe 840 of Gas in pipe. 180 of Clean oil 240 of Muddy gassy oil 38 of Gravity (API) | |
View Pressures | No Recovery Gas data. |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |
Test Number: 5 | Data Source: TRILOBITE |
Interval: 3454 to 3550
Formation tested: Lans. H-L | Date, Time: 14-APR-00; 20:15:26 |
Initial Hydro Pressure: 1677 PSI
First Initial Flow Pressure: 33 PSI First Final Flow Pressure: 232 PSI Initial Shut-in Pressure: 936 PSI Second Initial Flow Pressure: 244 PSI Second Final Flow Pressure: 391 PSI Final Shut-in Pressure: 830 PSI Final Hydro Pressure: 1679 PSI |
Tool Data Hole Size: 7.78 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 240 ft. Drill Pipe Length: 3194 ft. |
Initial Flow: Weak to a strong blow in 8 minutes. Final Flow: Weak to a strong blow in 25 minutes. Final Shut-In: Had a weak blow back. |
|
Bottom Hole Temperature: 113 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
Recovery 960 of Total Fluid 240 of Fluid in Drill Collars 720 of Fluid in Drill Pipe 120 of Gas in pipe 180 of Clean oil 540 of Gassy mud & water cut oil 240 of Slightly oil & gas cut water 90000 of Salinity (PPM) 40 of Gravity (API) | |
View Pressures | No Recovery Gas data. |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |
Test Number: 6 | Data Source: TRILOBITE |
Interval: 3642 to 3654
Formation tested: Arbuckle | Date, Time: 15-APR-00; 14:34:45 |
Initial Hydro Pressure: 1786 PSI
First Initial Flow Pressure: 429 PSI First Final Flow Pressure: 721 PSI Initial Shut-in Pressure: 1111 PSI Second Initial Flow Pressure: 697 PSI Second Final Flow Pressure: 927 PSI Final Shut-in Pressure: 1101 PSI Final Hydro Pressure: 1750 PSI |
Tool Data Hole Size: 7.78 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 240 ft. Drill Pipe Length: 3412 ft. |
Initial Flow: Strong blow in 1 minute. Final Flow: Strong blow in 3 minutes. Final Shut-In: Had blow back. |
|
Bottom Hole Temperature: 119 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
Recovery 2500 of Total Fluid 240 of Fluid in Drill Collars 2260 of Fluid in Drill Pipe 180 of Gas in pipe. 2500 of Clean oil 26 of Gravity (API) | |
View Pressures | No Recovery Gas data. |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |
Test Number: 7 | Data Source: TRILOBITE |
Interval: 3657 to 3669
Formation tested: Arbuckle | Date, Time: 16-APR-00; 04:51:03 |
Initial Hydro Pressure: 1745 PSI
First Initial Flow Pressure: 50 PSI First Final Flow Pressure: 265 PSI Initial Shut-in Pressure: 1136 PSI Second Initial Flow Pressure: 268 PSI Second Final Flow Pressure: 412 PSI Final Shut-in Pressure: 1141 PSI Final Hydro Pressure: 1725 PSI |
Tool Data Hole Size: 7.78 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 240 ft. Drill Pipe Length: 3414 ft. |
Initial Flow: Strong blow in 5 minutes. Final Flow: Weak to a strong blow in 10 minutes. Final Shut-In: Had blow back. |
|
Bottom Hole Temperature: 107 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
Recovery 1080 of Total Fluid 240 of Fluid in Drill Collars 840 of Fluid in Drill Pipe 120 of Gas in pipe 1080 of Clean oil 26 of Gravity (API) | |
View Pressures | No Recovery Gas data. |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |