API: 15-033-21101
Operator: MULL DRILLING COMPANY, INC. Field: Wildcat Lease: Barnes Well 1-35 |
Location: T31S R19W, Sec. 35, SE NE SE
1500 North, 330 West, from SE corner Longitude: -99.346926 Latitude: 37.2989723 County: Comanche Status: D&A |
Spud Date: 15-JUN-00
Completion Date: 01-JUL-00 Plugging Date: 01-JUL-00 Total Depth: 6050 Form. at depth: ARBUCKLE Elevation: 2096 KB |
Test Number: 2 | Data Source: TRILOBITE |
Interval: 5609 to 5628
Formation tested: Viola | Date, Time: 27-JUN-00; 07:31:47 |
Initial Hydro Pressure: 2695 PSI
First Initial Flow Pressure: 57 PSI First Final Flow Pressure: 119 PSI Initial Shut-in Pressure: 1036 PSI Second Initial Flow Pressure: 132 PSI Second Final Flow Pressure: 236 PSI Final Shut-in Pressure: 843 PSI Final Hydro Pressure: 2667 PSI |
Tool Data Hole Size: 7.78 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.38 in. Drill Collar Length: 121 ft. Drill Pipe Length: 5477 ft. |
Initial Flow: Strong blow bottom of bucket in 45 seconds. Gas to surface in 19 minutes Gas will burn. Initial Shut-In: Bled 2"". Blow back built to 9"" Final Flow: Bottom of bucket as soon as tool opened. Final Shut-In: Bled 2"". Blow back built to bottom of bucket. |
|
Bottom Hole Temperature: 140 DEG F
Percent Porosity: Samples: Yes Gas Recovery: Comments: | |
Recovery 682 of Total Fluid 124 of Fluid in Drill Collars 558 of Fluid in Drill Pipe 372 of Clean gassy oil 186 of Gas & mud cut Oil 124 of Gas & oil cut mud 37 of Gravity (API) | |
View Pressures | View Recovery Gas |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |
Test Number: 3 | Data Source: TRILOBITE |
Interval: 5615 to 5638
Formation tested: Viola | Date, Time: 28-JUN-00; 04:19:48 |
Initial Hydro Pressure: 2755 PSI
First Initial Flow Pressure: 125 PSI First Final Flow Pressure: 216 PSI Initial Shut-in Pressure: 1375 PSI Second Initial Flow Pressure: 236 PSI Second Final Flow Pressure: 406 PSI Final Shut-in Pressure: 1229 PSI Final Hydro Pressure: 2667 PSI |
Tool Data Hole Size: 7.875 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 180 ft. Drill Pipe Length: 5415 ft. |
Initial Flow: Strong blow. Bottom of bucket in 1 1/2 minutes. Initial Shut-In; Strong blow. Bottom of bucket in 6 minutes. Final Flow: Strong blow. Gas to surface in 9 minutes. (see gas volume report). Final Shut-In: Strong blow. Bottom of bucket in 6 minutes. |
|
Bottom Hole Temperature: 135 DEG F
Percent Porosity: 16 Samples: Gas sample Gas Recovery: Comments: | |
Recovery 860 of Total Fluid 180 of Fluid in Drill Collars 680 of Fluid in Drill Pipe 125 of Clean gassy oil 240 of Oil, gas & mud cut water 495 of Salt water 96000 of Salinity (PPM) 41 of Gravity (API) | |
View Pressures | View Recovery Gas |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |