Drill Stem Tests Database
Specific Well--15-033-21102
API: 15-033-21102
Operator: Samuel Gary Jr. and Assoc., Inc.
Field: Wildcat
Lease: Swisher
Well 26-3
Location: T32S R19W, Sec. 26, NE NW
4610 North, 3330 West, from SE corner
Longitude: -99.3572
Latitude: 37.2348
County: Comanche
Status: GAS-P&A
Spud Date: 06/20/2000
Completion Date: 08/07/2000
Plugging Date: 06/22/2004
Total Depth: 5280
Form. at depth: MISSISSIPPIAN
Elevation: 1985 KB
Test Number: 1 Data Source: TRILOBITE
Interval: 4735 to 4782
Formation tested: Swope
Date, Time: 06/26/2000; 22:43:40
Initial Hydro Pressure: 2325 PSI
First Initial Flow Pressure: 57 PSI
First Final Flow Pressure: 104 PSI
Initial Shut-in Pressure: 1671 PSI
Second Initial Flow Pressure: 121 PSI
Second Final Flow Pressure: 289 PSI
Final Shut-in Pressure: 1645 PSI
Final Hydro Pressure: 2220 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 296.16 ft.
Drill Pipe Length: ft.
Initial Flow: Weak blow built to 8"" in H2O bucket. Initial Shut-In; Bled down for 5 minutes. No blow back
Final Flow: Weak blow built to bottom of bucket in 32 minutes.
Final Shut-In: Bled down for back.
Bottom Hole Temperature: 124 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
552 of Total Fluid
296 of Fluid in Drill Collars
256 of Fluid in Drill Pipe
60 of Very slightly oil cut muddy water
492 of Slightly mud cut water
77000 of Salinity (PPM)
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 2 Data Source: TRILOBITE
Interval: 5136 to 5210
Formation tested: Mississippi
Date, Time: 06/29/2000; 01:55:54
Initial Hydro Pressure: 2569 PSI
First Initial Flow Pressure: 161 PSI
First Final Flow Pressure: 161 PSI
Initial Shut-in Pressure: 1821 PSI
Second Initial Flow Pressure: 150 PSI
Second Final Flow Pressure: 151 PSI
Final Shut-in Pressure: 1751 PSI
Final Hydro Pressure: 2452 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 325.43 ft.
Drill Pipe Length: ft.
Initial Flow: Strong blow. Bottom of bucket in 45 seconds. Gas to surface in 4 minutes. Close tool. Initial Shut-In: Bled down for 15 minutes. No blow back.
Final Flow: Strong blow. Bottom of bucket in 10 seconds. Gauge gas.
Final Shut-In: Bled down for 20 minutes. No blow back.
Bottom Hole Temperature: 135 DEG F
Percent Porosity:
Samples: Caraway analytical 728 N.Roosevelt
Gas Recovery:
Comments:
Recovery
365 of Total Fluid
325 of Fluid in Drill Collars
40 of Fluid in Drill Pipe
4807 of Gas in pipe.
365 of Very slightly gas cut mud
View Pressures View Recovery Gas
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.