API: 15-033-21103
Operator: PELICAN HILL OIL & GAS, INC. Field: Wildcat Lease: Thompson Well 1-13 |
Location: T32S R18W, Sec. 13, NW SW NW
3735 North, 4714 West, from SE corner Longitude: -99.23498 Latitude: 37.2625 County: Comanche Status: GAS-P&A |
Spud Date: 16-JUN-00
Completion Date: 28-JUN-00 Plugging Date: 29-OCT-04 Total Depth: 5800 Form. at depth: ARBUCKLE Elevation: 2070 KB |
Quarter calls on ACO-1 (N2 SE NE) are not right. |
Test Number: 1 | Data Source: TRILOBITE |
Interval: 4922 to 4955
Formation tested: Altamont | Date, Time: 23-JUN-00; 16:52:12 |
Initial Hydro Pressure: 2363 PSI
First Initial Flow Pressure: 66 PSI First Final Flow Pressure: 84 PSI Initial Shut-in Pressure: 1838 PSI Second Initial Flow Pressure: 80 PSI Second Final Flow Pressure: 82 PSI Final Shut-in Pressure: 1844 PSI Final Hydro Pressure: 2344 PSI |
Tool Data Hole Size: 7.875 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 270 ft. Drill Pipe Length: 4650 ft. |
Initial Flow: Strong blow. Gas to surface in 5 1/2 minutes. (see gas volume report) Initial Shut-In: No blow. Final Flow: Strong blow. (see gas volume report) Final Shut-In: No blow. |
|
Bottom Hole Temperature: 120 DEG F
Percent Porosity: 16 Samples: Gas sample Gas Recovery: Comments: | |
Recovery 275 of Total Fluid 270 of Fluid in Drill Collars 5 of Fluid in Drill Pipe 275 of Drilling mud 5000 of Salinity (PPM) | |
View Pressures | View Recovery Gas |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |
Test Number: 2 | Data Source: TRILOBITE |
Interval: 5056 to 5130
Formation tested: Mississippi | Date, Time: 24-JUN-00; 23:06:43 |
Initial Hydro Pressure: 2473 PSI
First Initial Flow Pressure: 37 PSI First Final Flow Pressure: 31 PSI Initial Shut-in Pressure: 33 PSI Second Initial Flow Pressure: PSI Second Final Flow Pressure: PSI Final Shut-in Pressure: PSI Final Hydro Pressure: 2370 PSI |
Tool Data Hole Size: 7.875 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 270 ft. Drill Pipe Length: 4773 ft. |
Initial Flow: Weak blow. 1/2"" or less. Initial Shut-In: No blow. Final Flow: None |
|
Bottom Hole Temperature: 117 DEG F
Percent Porosity: 10 Samples: none Gas Recovery: Comments: | |
Recovery 25 of Total Fluid 25 of Fluid in Drill Collars 25 of Drilling mud 7000 of Salinity (PPM) | |
View Pressures | No Recovery Gas data. |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |