Drill Stem Tests Database
Specific Well--15-033-21104
API: 15-033-21104
Operator: MULL DRILLING CO.
Field: Wildcat
Lease: Lester
Well 1-3
Location: T34S R20W, Sec. 3, SE SW NE
2970 North, 1825 West, from SE corner
Longitude: -99.4758602
Latitude: 37.1134288
County: Comanche
Status: D&A
Spud Date: 06-JUL-00
Completion Date: 24-JUL-00
Plugging Date: 24-JUL-00
Total Depth: 6500
Form. at depth: ARBUCKLE
Elevation: 1780 KB
all Reeves elogs originally mismarked NW SE NE. --cb 12/21/01
Test Number: 1 Data Source: TRILOBITE
Interval: 4845 to 4951
Formation tested: Novinger
Date, Time: 14-JUL-00; 06:43:25
Initial Hydro Pressure: 2293 PSI
First Initial Flow Pressure: 47 PSI
First Final Flow Pressure: 93 PSI
Initial Shut-in Pressure: 441 PSI
Second Initial Flow Pressure: 49 PSI
Second Final Flow Pressure: 82 PSI
Final Shut-in Pressure: 1551 PSI
Final Hydro Pressure: 2279 PSI
Tool Data
Hole Size: 7.78 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.38 in.
Drill Collar Length: 179 ft.
Drill Pipe Length: 4706 ft.
Initial Flow: Strong blow. Bottom of bucket in 1 minute. Initial Shut-In: Bled 2"". No blow back.
Final Flow: Bottom of bucket as soon as tool opened.
Final Shut-In: Bled 2"". No blow back.
Bottom Hole Temperature: DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
150 of Total Fluid
150 of Fluid in Drill Collars
30 of Mud
120 of Gas cut mud
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 2 Data Source: TRILOBITE
Interval: 5055 to 5240
Formation tested: Mississippi
Date, Time: 15-JUL-00; 22:58:33
Initial Hydro Pressure: 2505 PSI
First Initial Flow Pressure: 78 PSI
First Final Flow Pressure: 104 PSI
Initial Shut-in Pressure: 970 PSI
Second Initial Flow Pressure: 63 PSI
Second Final Flow Pressure: 83 PSI
Final Shut-in Pressure: 1827 PSI
Final Hydro Pressure: 2455 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 150.89 ft.
Drill Pipe Length: ft.
Initial Flow: Strong blow built to bottom of bucket in 1 minute 45 seconds. Initial Shut-In: Bled down for 5 minutes. No blow back.
Final Flow: Strong blow bottom of bucket in 15 seconds. Gas to surface in 30 minutes Gauge gas
Final Shut-In: Bled down for 10 minutes. No blow back.
Bottom Hole Temperature: DEG F
Percent Porosity:
Samples: Caraway analytical 728 N.Roosevelt
Gas Recovery:
Comments:
Recovery
90 of Total Fluid
90 of Fluid in Drill Collars
4953 of Gas in pipe.
90 of Slightly gas cut mud
View Pressures View Recovery Gas
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 3 Data Source: TRILOBITE
Interval: 6122 to 6160
Formation tested: Viola
Date, Time: 20-JUL-00; 22:49:42
Initial Hydro Pressure: 2944 PSI
First Initial Flow Pressure: 44 PSI
First Final Flow Pressure: 42 PSI
Initial Shut-in Pressure: 233 PSI
Second Initial Flow Pressure: 45 PSI
Second Final Flow Pressure: 73 PSI
Final Shut-in Pressure: 162 PSI
Final Hydro Pressure: 2874 PSI
Tool Data
Hole Size: 7.875 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 120 ft.
Drill Pipe Length: 6013 ft.
Initial Flow: Weak blow (1 1/4"") Initial Shut-In: No blow.
Final Flow: No blow. Flushed tool 6 minutes into
Final Flow. Weak blow returned (1 1/2"" decreasing)
Final Shut-In: No blow.
Bottom Hole Temperature: 131 DEG F
Percent Porosity: 10
Samples: none
Gas Recovery:
Comments:
Recovery
125 of Total Fluid
125 of Fluid in Drill Collars
125 of Drilling mud
4000 of Salinity (PPM)
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.