API: 15-033-21104
Operator: MULL DRILLING CO. Field: Wildcat Lease: Lester Well 1-3 |
Location: T34S R20W, Sec. 3, SE SW NE
2970 North, 1825 West, from SE corner Longitude: -99.4758602 Latitude: 37.1134288 County: Comanche Status: D&A |
Spud Date: 06-JUL-00
Completion Date: 24-JUL-00 Plugging Date: 24-JUL-00 Total Depth: 6500 Form. at depth: ARBUCKLE Elevation: 1780 KB |
all Reeves elogs originally mismarked NW SE NE. --cb 12/21/01 |
Test Number: 1 | Data Source: TRILOBITE |
Interval: 4845 to 4951
Formation tested: Novinger | Date, Time: 14-JUL-00; 06:43:25 |
Initial Hydro Pressure: 2293 PSI
First Initial Flow Pressure: 47 PSI First Final Flow Pressure: 93 PSI Initial Shut-in Pressure: 441 PSI Second Initial Flow Pressure: 49 PSI Second Final Flow Pressure: 82 PSI Final Shut-in Pressure: 1551 PSI Final Hydro Pressure: 2279 PSI |
Tool Data Hole Size: 7.78 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.38 in. Drill Collar Length: 179 ft. Drill Pipe Length: 4706 ft. |
Initial Flow: Strong blow. Bottom of bucket in 1 minute. Initial Shut-In: Bled 2"". No blow back. Final Flow: Bottom of bucket as soon as tool opened. Final Shut-In: Bled 2"". No blow back. |
|
Bottom Hole Temperature: DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
Recovery 150 of Total Fluid 150 of Fluid in Drill Collars 30 of Mud 120 of Gas cut mud | |
View Pressures | No Recovery Gas data. |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |
Test Number: 2 | Data Source: TRILOBITE |
Interval: 5055 to 5240
Formation tested: Mississippi | Date, Time: 15-JUL-00; 22:58:33 |
Initial Hydro Pressure: 2505 PSI
First Initial Flow Pressure: 78 PSI First Final Flow Pressure: 104 PSI Initial Shut-in Pressure: 970 PSI Second Initial Flow Pressure: 63 PSI Second Final Flow Pressure: 83 PSI Final Shut-in Pressure: 1827 PSI Final Hydro Pressure: 2455 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 150.89 ft. Drill Pipe Length: ft. |
Initial Flow: Strong blow built to bottom of bucket in 1 minute 45 seconds. Initial Shut-In: Bled down for 5 minutes. No blow back. Final Flow: Strong blow bottom of bucket in 15 seconds. Gas to surface in 30 minutes Gauge gas Final Shut-In: Bled down for 10 minutes. No blow back. |
|
Bottom Hole Temperature: DEG F
Percent Porosity: Samples: Caraway analytical 728 N.Roosevelt Gas Recovery: Comments: | |
Recovery 90 of Total Fluid 90 of Fluid in Drill Collars 4953 of Gas in pipe. 90 of Slightly gas cut mud | |
View Pressures | View Recovery Gas |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |
Test Number: 3 | Data Source: TRILOBITE |
Interval: 6122 to 6160
Formation tested: Viola | Date, Time: 20-JUL-00; 22:49:42 |
Initial Hydro Pressure: 2944 PSI
First Initial Flow Pressure: 44 PSI First Final Flow Pressure: 42 PSI Initial Shut-in Pressure: 233 PSI Second Initial Flow Pressure: 45 PSI Second Final Flow Pressure: 73 PSI Final Shut-in Pressure: 162 PSI Final Hydro Pressure: 2874 PSI |
Tool Data Hole Size: 7.875 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 120 ft. Drill Pipe Length: 6013 ft. |
Initial Flow: Weak blow (1 1/4"") Initial Shut-In: No blow. Final Flow: No blow. Flushed tool 6 minutes into Final Flow. Weak blow returned (1 1/2"" decreasing) Final Shut-In: No blow. |
|
Bottom Hole Temperature: 131 DEG F
Percent Porosity: 10 Samples: none Gas Recovery: Comments: | |
Recovery 125 of Total Fluid 125 of Fluid in Drill Collars 125 of Drilling mud 4000 of Salinity (PPM) | |
View Pressures | No Recovery Gas data. |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |