|
API: 15-033-21105
Operator: DAYSTAR PETROLEUM, INC. Field: Coulter Southeast Lease: Cronin 'A' Well 1 |
Location: T32S R18W, Sec. 31, SW NE SE NE
1945 South, 653 West, from NE corner Longitude: -99.3120754 Latitude: 37.2170844 County: Comanche Status: O&G-P&A |
Spud Date: 07/01/2000
Completion Date: 08/18/2000 Plugging Date: 03/26/2019 Total Depth: 5370 Form. at depth: MISSISSIPPIAN Elevation: 2130 KB |
| Test Number: 1 | Data Source: TRILOBITE |
|
Interval: 4980 to 4991
Formation tested: Hertha | Date, Time: 07/09/2000; 14:46:44 |
|
Initial Hydro Pressure: 2535 PSI
First Initial Flow Pressure: 26 PSI First Final Flow Pressure: 128 PSI Initial Shut-in Pressure: 1793 PSI Second Initial Flow Pressure: 133 PSI Second Final Flow Pressure: 209 PSI Final Shut-in Pressure: 1786 PSI Final Hydro Pressure: 2443 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 4979 ft. Drill Pipe Length: ft. |
|
Initial Flow: Fair blow built to 11"" in H2O bucket. Initial Shut-In: Bled down for 10 minutes. No blow back. Final Flow: Weak blow built to 7-1/2""in H2O bucket. Final Shut-In: Bled down for 10 minutes. No blow back. |
|
|
Bottom Hole Temperature: 125 DEG F
Percent Porosity: Samples: Caraway Analytical,728 N.Roosevelt Gas Recovery: Comments: | |
|
Recovery 310 of Total Fluid 310 of Fluid in Drill Pipe 60 of Slightly mud cut water 250 of Salt water 28000 of Salinity (PPM) | |
| View Pressures | No Recovery Gas data. |
| Test Number: 2 | Data Source: TRILOBITE |
|
Interval: 5120 to 5135
Formation tested: Altamont | Date, Time: 07/10/2000; 20:55:20 |
|
Initial Hydro Pressure: 2610 PSI
First Initial Flow Pressure: 55 PSI First Final Flow Pressure: 71 PSI Initial Shut-in Pressure: 1789 PSI Second Initial Flow Pressure: 51 PSI Second Final Flow Pressure: 113 PSI Final Shut-in Pressure: 1743 PSI Final Hydro Pressure: 2539 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: ft. Drill Pipe Length: 5107 ft. |
|
Initial Flow: Strong blow. Bottom of bucket in 15 seconds. Gas to surface in 12 minutes Gauge gas. Initial Shut-In: Bled down for 10 minutes. No blow back. Final Flow: Strong blow bottom of bucket in 10 seconds. Gauge gas. Final Shut-In: Bled down for 10 minutes. Very slight blow back 1/8-1/4"" in H2O bucket. |
|
|
Bottom Hole Temperature: 118 DEG F
Percent Porosity: Samples: Caraway Analytical Gas Recovery: Comments: | |
|
Recovery 240 of Total Fluid 240 of Fluid in Drill Pipe 4867 of Gas in pipe. 180 of Free oil slightly gas cut 60 of Heavy oil & gas cut mud 38 of Gravity (API) | |
| View Pressures | View Recovery Gas |
| Test Number: 4 | Data Source: TRILOBITE |
|
Interval: 5274 to 5370
Formation tested: Mississippi | Date, Time: 07/13/2000; 06:55:13 |
|
Initial Hydro Pressure: 2718 PSI
First Initial Flow Pressure: PSI First Final Flow Pressure: PSI Initial Shut-in Pressure: PSI Second Initial Flow Pressure: PSI Second Final Flow Pressure: PSI Final Shut-in Pressure: PSI Final Hydro Pressure: 2665 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: in. Drill Pipe ID: 3.8 in. Drill Collar Length: ft. Drill Pipe Length: 5224 ft. |
| Opened tool packer failed tried to reset failed. | |
|
Bottom Hole Temperature: DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
|
Recovery 600 of Total Fluid 600 of Fluid in Drill Pipe 600 of Drilling mud | |
| View Pressures | No Recovery Gas data. |
| Test Number: 5 | Data Source: TRILOBITE |
|
Interval: 5281 to 5371
Formation tested: Mississippi | Date, Time: 07/13/2000; 23:49:25 |
|
Initial Hydro Pressure: 2723 PSI
First Initial Flow Pressure: 1584 PSI First Final Flow Pressure: PSI Initial Shut-in Pressure: PSI Second Initial Flow Pressure: PSI Second Final Flow Pressure: PSI Final Shut-in Pressure: 2181 PSI Final Hydro Pressure: 2716 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: ft. Drill Pipe Length: 5326 ft. |
|
Initial Flow: Weak blow built to 1"" slowly died in 23 minutes. Initial Shut-In: No blow back. Final Flow: Dead Final Shut-In: No blow back. |
|
|
Bottom Hole Temperature: 126 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
|
Recovery 35 of Total Fluid 35 of Fluid in Drill Pipe 35 of Drilling mud | |
| View Pressures | No Recovery Gas data. |
| Test Number: 3 | Data Source: TRILOBITE |
|
Interval: 5183 to 5220
Formation tested: Pawnee/Ft.Scott | Date, Time: 07/11/2000; 22:55:51 |
|
Initial Hydro Pressure: 2632 PSI
First Initial Flow Pressure: 26 PSI First Final Flow Pressure: 33 PSI Initial Shut-in Pressure: 1788 PSI Second Initial Flow Pressure: 36 PSI Second Final Flow Pressure: 53 PSI Final Shut-in Pressure: 1802 PSI Final Hydro Pressure: 2590 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: ft. Drill Pipe Length: 5170 ft. |
|
Initial Flow: Strong blow. Bottom of bucket in 30 seconds. Initial Shut-In: Bled down for 5 minutes. No blow back Final Flow: Strong blow. Bottom of bucket in 10 seconds. Gas to surface in 5 minutes. Gauge gas. Final Shut-In: Bled down for 10 minutes. No blow back. |
|
|
Bottom Hole Temperature: 124 DEG F
Percent Porosity: Samples: Caraway Analytical 728 N.Roosevelt Gas Recovery: Comments: | |
|
Recovery 80 of Total Fluid 80 of Fluid in Drill Pipe 5090 of Gas in pipe. 80 of Slightly oil & gas cut muddy water 25000 of Salinity (PPM) | |
| View Pressures | View Recovery Gas |