|
API: 15-033-21106
Operator: PELICAN HILL OIL & GAS Field: Wildcat Lease: Miller Well 1-12 |
Location: T32S R18W, Sec. 12, NW NE SW
2263 North, 3726 West, from SE corner Longitude: -99.2316671 Latitude: 37.2728857 County: Comanche Status: O&G |
Spud Date: 06/30/2000
Completion Date: 07/10/2000 Plugging Date: Total Depth: 5350 Form. at depth: ARBUCKLE Elevation: 2106 KB |
| DST #1 mismarked 2070 KB. --CB 11/12/01 | ||
| Test Number: 1 | Data Source: TRILOBITE |
|
Interval: 4960 to 4993
Formation tested: Altamont | Date, Time: 07/07/2000; 15:11:40 |
|
Initial Hydro Pressure: 2518 PSI
First Initial Flow Pressure: 90 PSI First Final Flow Pressure: 79 PSI Initial Shut-in Pressure: 1821 PSI Second Initial Flow Pressure: 97 PSI Second Final Flow Pressure: 75 PSI Final Shut-in Pressure: 1830 PSI Final Hydro Pressure: 2484 PSI |
Tool Data Hole Size: 7.875 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 270 ft. Drill Pipe Length: 4675 ft. |
|
Initial Flow: Strong blow. Gas to surface in 6 minutes. (see gas volume report) Initial Shut-In: No blow. Final Flow: Strong blow. (see gas volume report) Final Shut-In: No blow. |
|
|
Bottom Hole Temperature: 116 DEG F
Percent Porosity: 16 Samples: Gas sample Gas Recovery: Comments: | |
|
Recovery 110 of Total Fluid 110 of Fluid in Drill Collars 110 of Drilling mud 6000 of Salinity (PPM) | |
| View Pressures | View Recovery Gas |
| Test Number: 2 | Data Source: TRILOBITE |
|
Interval: 5090 to 5195
Formation tested: Mississippi | Date, Time: 07/08/2000; 20:18:40 |
|
Initial Hydro Pressure: 2553 PSI
First Initial Flow Pressure: 463 PSI First Final Flow Pressure: 454 PSI Initial Shut-in Pressure: 1763 PSI Second Initial Flow Pressure: 412 PSI Second Final Flow Pressure: 442 PSI Final Shut-in Pressure: 1758 PSI Final Hydro Pressure: 2430 PSI |
Tool Data Hole Size: 7.875 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 270 ft. Drill Pipe Length: 4802 ft. |
|
Initial Flow: Strong blow. Gas to surface in 4 minutes. (see gas volume report) Initial Shut-In: Weak blow. Final Flow: Strong blow. (see gas volume report) Final Shut-In: Weak blow. |
|
|
Bottom Hole Temperature: 125 DEG F
Percent Porosity: 20 Samples: Gas sample Gas Recovery: Comments: | |
|
Recovery 290 of Total Fluid 270 of Fluid in Drill Collars 20 of Fluid in Drill Pipe 290 of Drilling mud 8000 of Salinity (PPM) | |
| View Pressures | View Recovery Gas |