API: 15-033-21107
Operator: PELICAN HILL OIL & GAS, INC. Field: Wildcat Lease: Unruh Well 1-1 |
Location: T32S R18W, Sec. 1, E2 W2 NW
1380 South, 830 East, from NW corner Longitude: -99.2343088 Latitude: 37.2919671 County: Comanche Status: D&A |
Spud Date: 12-JUL-00
Completion Date: 25-JUL-00 Plugging Date: 25-JUL-00 Total Depth: 5752 Form. at depth: ARBUCKLE Elevation: 2138 KB |
Test ticket states elevation as 2125 GL, corrected per ACO-1. SPL 6-4-2003. |
Test Number: 1 | Data Source: TRILOBITE |
Interval: 4979 to 5015
Formation tested: Altamont | Date, Time: 19-JUL-00; 20:55:30 |
Initial Hydro Pressure: 2507 PSI
First Initial Flow Pressure: 62 PSI First Final Flow Pressure: 79 PSI Initial Shut-in Pressure: 653 PSI Second Initial Flow Pressure: 73 PSI Second Final Flow Pressure: 88 PSI Final Shut-in Pressure: 491 PSI Final Hydro Pressure: 2488 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 266.6 ft. Drill Pipe Length: ft. |
Initial Flow: Strong blow bottom of bucket in 15 seconds. Initial Shut-In: Bled down for 10 minutes. No blow back. Final Flow: Strong blow bottom of bucket in 10 seconds. Final Shut-In: Bled down for 10 minutes. No blow back. |
|
Bottom Hole Temperature: 122 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
Recovery 200 of Total Fluid 200 of Fluid in Drill Collars 4783 of Gas in pipe 200 of Oil & gas cut mud | |
View Pressures | No Recovery Gas data. |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |
Test Number: 2 | Data Source: TRILOBITE |
Interval: 5111 to 5207
Formation tested: Mississippi | Date, Time: 21-JUL-00; 14:15:42 |
Initial Hydro Pressure: 2638 PSI
First Initial Flow Pressure: 65 PSI First Final Flow Pressure: 69 PSI Initial Shut-in Pressure: 325 PSI Second Initial Flow Pressure: 56 PSI Second Final Flow Pressure: 73 PSI Final Shut-in Pressure: 280 PSI Final Hydro Pressure: 2565 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 266.45 ft. Drill Pipe Length: ft. |
Initial Flow: Fair blow built to bottom of bucket in 56 seconds. Initial Flow: Bled down for 3 minutes. No blow back. Final Flow: Strong blow built to bottom of bucket in 20 seconds. Final Shut-In: Bled down for 10 minutes. No blow back. |
|
Bottom Hole Temperature: 124 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
Recovery 92 of Total Fluid 92 of Fluid in Drill Collars 1400 of Gas in pipe 92 of Very slightly oil & gas cut mud | |
View Pressures | No Recovery Gas data. |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |