Drill Stem Tests Database
Specific Well--15-033-21107
API: 15-033-21107
Operator: PELICAN HILL OIL & GAS, INC.
Field: Wildcat
Lease: Unruh
Well 1-1
Location: T32S R18W, Sec. 1, E2 W2 NW
1380 South, 830 East, from NW corner
Longitude: -99.2343088
Latitude: 37.2919671
County: Comanche
Status: D&A
Spud Date: 12-JUL-00
Completion Date: 25-JUL-00
Plugging Date: 25-JUL-00
Total Depth: 5752
Form. at depth: ARBUCKLE
Elevation: 2138 KB
Test ticket states elevation as 2125 GL, corrected per ACO-1. SPL 6-4-2003.
Test Number: 1 Data Source: TRILOBITE
Interval: 4979 to 5015
Formation tested: Altamont
Date, Time: 19-JUL-00; 20:55:30
Initial Hydro Pressure: 2507 PSI
First Initial Flow Pressure: 62 PSI
First Final Flow Pressure: 79 PSI
Initial Shut-in Pressure: 653 PSI
Second Initial Flow Pressure: 73 PSI
Second Final Flow Pressure: 88 PSI
Final Shut-in Pressure: 491 PSI
Final Hydro Pressure: 2488 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 266.6 ft.
Drill Pipe Length: ft.
Initial Flow: Strong blow bottom of bucket in 15 seconds. Initial Shut-In: Bled down for 10 minutes. No blow back.
Final Flow: Strong blow bottom of bucket in 10 seconds.
Final Shut-In: Bled down for 10 minutes. No blow back.
Bottom Hole Temperature: 122 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
200 of Total Fluid
200 of Fluid in Drill Collars
4783 of Gas in pipe
200 of Oil & gas cut mud
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 2 Data Source: TRILOBITE
Interval: 5111 to 5207
Formation tested: Mississippi
Date, Time: 21-JUL-00; 14:15:42
Initial Hydro Pressure: 2638 PSI
First Initial Flow Pressure: 65 PSI
First Final Flow Pressure: 69 PSI
Initial Shut-in Pressure: 325 PSI
Second Initial Flow Pressure: 56 PSI
Second Final Flow Pressure: 73 PSI
Final Shut-in Pressure: 280 PSI
Final Hydro Pressure: 2565 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 266.45 ft.
Drill Pipe Length: ft.
Initial Flow: Fair blow built to bottom of bucket in 56 seconds. Initial Flow: Bled down for 3 minutes. No blow back.
Final Flow: Strong blow built to bottom of bucket in 20 seconds.
Final Shut-In: Bled down for 10 minutes. No blow back.
Bottom Hole Temperature: 124 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
92 of Total Fluid
92 of Fluid in Drill Collars
1400 of Gas in pipe
92 of Very slightly oil & gas cut mud
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.