|
API: 15-033-21110
Operator: Samuel Gary Jr. and Assoc., Inc. Field: Wildcat Lease: Jellison Well 10-8 |
Location: T33S R19W, Sec. 10, S2 SE NE
2310 South, 700 West, from NE corner Longitude: -99.3654081 Latitude: 37.1866255 County: Comanche Status: D&A |
Spud Date: 07/17/2000
Completion Date: 07/29/2000 Plugging Date: 07/29/2000 Total Depth: 6260 Form. at depth: MISSISSIPPIAN Elevation: 2031 KB |
| Test Number: 1 | Data Source: TRILOBITE |
|
Interval: 5150 to 5194
Formation tested: Ft.Scott | Date, Time: 07/25/2000; 21:16:16 |
|
Initial Hydro Pressure: 2587 PSI
First Initial Flow Pressure: 19 PSI First Final Flow Pressure: 19 PSI Initial Shut-in Pressure: 92 PSI Second Initial Flow Pressure: 20 PSI Second Final Flow Pressure: 22 PSI Final Shut-in Pressure: 878 PSI Final Hydro Pressure: 2532 PSI |
Tool Data Hole Size: 7.875 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: ft. Drill Pipe Length: 5129 ft. |
|
Initial Flow: Fair to strong blow. Bottom of bucket in 4 1/2 minutes. Initial Shut-In: Weak blow. (1 - 2"") Final Flow: Fair to strong blow. Bottom of bucket in 13 minutes. Final Shut-In: No blow. |
|
|
Bottom Hole Temperature: 120 DEG F
Percent Porosity: 14 Samples: none Gas Recovery: Comments: | |
|
Recovery 30 of Total Fluid 30 of Fluid in Drill Pipe 300 of Gas in pipe. 30 of Drilling mud 9000 of Salinity (PPM) | |
| View Pressures | No Recovery Gas data. |
| Test Number: 2 | Data Source: TRILOBITE |
|
Interval: 5257 to 5350
Formation tested: Mississippi | Date, Time: 07/27/2000; 05:38:26 |
|
Initial Hydro Pressure: 2674 PSI
First Initial Flow Pressure: 110 PSI First Final Flow Pressure: 56 PSI Initial Shut-in Pressure: 1695 PSI Second Initial Flow Pressure: 81 PSI Second Final Flow Pressure: 75 PSI Final Shut-in Pressure: 1524 PSI Final Hydro Pressure: 2582 PSI |
Tool Data Hole Size: 7.875 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: ft. Drill Pipe Length: 5254 ft. |
|
Initial Flow: Strong blow. Bottom of bucket in 40 seconds. Initial Shut-In: Gas to surface in 1 minute. No blow after blow down. Final Flow: Strong blow. (see gas volume report) Final Shut-In: No blow. |
|
|
Bottom Hole Temperature: 134 DEG F
Percent Porosity: 10 Samples: Gas sample Gas Recovery: Comments: | |
|
Recovery 118 of Total Fluid 118 of Fluid in Drill Pipe 118 of Drilling mud 11000 of Salinity (PPM) | |
| View Pressures | View Recovery Gas |
| Test Number: 3 | Data Source: TRILOBITE |
|
Interval: 5350 to 5420
Formation tested: Mississippi | Date, Time: 07/28/2000; 03:30:13 |
|
Initial Hydro Pressure: 2675 PSI
First Initial Flow Pressure: 67 PSI First Final Flow Pressure: 45 PSI Initial Shut-in Pressure: 1582 PSI Second Initial Flow Pressure: 68 PSI Second Final Flow Pressure: 96 PSI Final Shut-in Pressure: 1293 PSI Final Hydro Pressure: 2616 PSI |
Tool Data Hole Size: 7.875 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: ft. Drill Pipe Length: 5347 ft. |
|
Initial Flow: Strong blow. Bottom of bucket in 30 seconds. Initial Shut-In: Gas to surface in 1 minute. No blow after blow down. Final Flow: Strong blow. (see gas volume report) Final Shut-In: No blow. |
|
|
Bottom Hole Temperature: 129 DEG F
Percent Porosity: 10 Samples: none Gas Recovery: Comments: | |
|
Recovery 210 of Total Fluid 210 of Fluid in Drill Pipe 90 of Gas cut mud 120 of Muddy water 94000 of Salinity (PPM) | |
| View Pressures | View Recovery Gas |