API: 15-095-21768
Operator: Messenger Petroleum, Inc Field: Prather East Lease: HELM Well 1 |
Location: T28S R7W, Sec. 4, NE SE SE
990 North, 330 West, from SE corner Longitude: -98.0819624 Latitude: 37.635493 County: Kingman Status: GAS |
Spud Date: 06-JUL-00
Completion Date: 15-AUG-00 Plugging Date: Total Depth: 4285 Form. at depth: SIMPSON Elevation: 1500 KB |
Test Number: 1 | Data Source: TRILOBITE |
Interval: 3851 to 3870
Formation tested: Mississippian | Date, Time: 13-JUL-00; 04:13:52 |
Initial Hydro Pressure: 1878 PSI
First Initial Flow Pressure: 37 PSI First Final Flow Pressure: 50 PSI Initial Shut-in Pressure: 1408 PSI Second Initial Flow Pressure: 40 PSI Second Final Flow Pressure: 57 PSI Final Shut-in Pressure: 1346 PSI Final Hydro Pressure: 1865 PSI |
Tool Data Hole Size: 7.78 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 248 ft. Drill Pipe Length: 3603 ft. |
Initial Flow: Strong blow, gas to surface in 12 minutes. Final Flow: Gas to surface |
|
Bottom Hole Temperature: 123 DEG F
Percent Porosity: Samples: gas sample Gas Recovery: Comments: | |
Recovery 180 of Total Fluid 180 of Fluid in Drill Collars 60 of Gas cut mud 120 of Muddy water 49000 of Salinity (PPM) | |
View Pressures | View Recovery Gas |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |
Test Number: 2 | Data Source: TRILOBITE |
Interval: 4172 to 4200
Formation tested: Viola | Date, Time: 14-JUL-00; 17:12:55 |
Initial Hydro Pressure: 2020 PSI
First Initial Flow Pressure: 14 PSI First Final Flow Pressure: 15 PSI Initial Shut-in Pressure: 16 PSI Second Initial Flow Pressure: 16 PSI Second Final Flow Pressure: 16 PSI Final Shut-in Pressure: 16 PSI Final Hydro Pressure: 2008 PSI |
Tool Data Hole Size: 7.78 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 248 ft. Drill Pipe Length: 3913 ft. |
Initial Flow: Weak surface blow, died in 5 minutes. Final Flow: No blow. |
|
Bottom Hole Temperature: 117 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
View Pressures | No Recovery Gas data. |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |