Drill Stem Tests Database
Specific Well--15-095-21769
API: 15-095-21769
Operator: MESSENGER PETROLEUM, INC.
Field: Settle
Lease: OAK
Well 1
Location: T29S R7W, Sec. 29, NE NW NE
330 South, 1650 West, from NE corner
Longitude: -98.1048674
Latitude: 37.5006893
County: Kingman
Status: GAS
Spud Date: 07/26/2000
Completion Date: 09/06/2000
Plugging Date:
Total Depth: 4580
Form. at depth: SIMPSON
Elevation: 1543 KB

Download DST Test Data

Test Number: 1 Data Source: TRILOBITE
Interval: 4132 to 4152
Formation tested: Mississippi
Date, Time: 08/02/2000; 23:59:30
Initial Hydro Pressure: 2102 PSI
First Initial Flow Pressure: 82 PSI
First Final Flow Pressure: 87 PSI
Initial Shut-in Pressure: 1110 PSI
Second Initial Flow Pressure: 46 PSI
Second Final Flow Pressure: 94 PSI
Final Shut-in Pressure: 1041 PSI
Final Hydro Pressure: 2049 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 249.23 ft.
Drill Pipe Length: ft.
Initial Flow: Strong blow Bottom of bucket in 20 seconds. Gas to surface in 18 minutes Gauge gas. Initial Shut-In: Bled down for 10 minutes. No blow back.
Final Flow: Strong blow. Bottom of bucket in 10 seconds. Gauge gas.
Final Shut-In: Bled down for 10 minutes. No blow back.
Bottom Hole Temperature: 130 DEG F
Percent Porosity:
Samples: Caraway Analytical
Gas Recovery:
Comments:
Recovery
255 of Total Fluid
249 of Fluid in Drill Collars
6 of Fluid in Drill Pipe
3868 of Gas in pipe.
255 of Very slightly gas cut mud
View Pressures View Recovery Gas
 
Test Number: 2 Data Source: TRILOBITE
Interval: 4152 to 4176
Formation tested: Mississippi
Date, Time: 08/02/2000; 16:05:17
Initial Hydro Pressure: 2117 PSI
First Initial Flow Pressure: 72 PSI
First Final Flow Pressure: 63 PSI
Initial Shut-in Pressure: 1128 PSI
Second Initial Flow Pressure: 53 PSI
Second Final Flow Pressure: 90 PSI
Final Shut-in Pressure: 1047 PSI
Final Hydro Pressure: 2131 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 249.23 ft.
Drill Pipe Length: ft.
Initial Flow: Weak blow built to bottom of bucket in 3 minutes. Initial Shut-In: Bled down for 2 minutes. No blow back.
Final Flow: Strong blow bottom of bucket in 10 seconds. Gas to surface in 30 minutes Gauge gas.
Final Shut-In: Bled down for 10 minutes. No blow back.
Bottom Hole Temperature: 129 DEG F
Percent Porosity:
Samples: Caraway
Gas Recovery:
Comments:
Recovery
200 of Total Fluid
200 of Fluid in Drill Collars
3954 of Gas in pipe.
200 of Gas & oil cut muddy water
140000 of Salinity (PPM)
View Pressures View Recovery Gas
 
Test Number: 3 Data Source: TRILOBITE
Interval: 4488 to 4522
Formation tested: Simpson
Date, Time: 08/04/2000; 06:07:39
Initial Hydro Pressure: 2227 PSI
First Initial Flow Pressure: 524 PSI
First Final Flow Pressure: 1076 PSI
Initial Shut-in Pressure: 1676 PSI
Second Initial Flow Pressure: 1101 PSI
Second Final Flow Pressure: 1571 PSI
Final Shut-in Pressure: 1675 PSI
Final Hydro Pressure: 2147 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 249.23 ft.
Drill Pipe Length: ft.
Initial Flow: Strong blow bottom of bucket in 40 seconds. Initial Shut-In: Bled down for 2 minutes. Built back to bottom of bucket in 10 minutes.
Final Flow: Strong blow bottom of bucket in 30 seconds.
Final Shut-In: Bled down for 2 minutes. Built back to weak surface blow.
Bottom Hole Temperature: 145 DEG F
Percent Porosity:
Samples: Caraway Analytical
Gas Recovery:
Comments:
Recovery
3400 of Total Fluid
249.23 of Fluid in Drill Collars
3151 of Fluid in Drill Pipe
400 of Heavy mud cut water
3000 of Salt water
50000 of Salinity (PPM)
View Pressures No Recovery Gas data.