API: 15-095-21769
Operator: MESSENGER PETROLEUM, INC. Field: Settle Lease: OAK Well 1 |
Location: T29S R7W, Sec. 29, NE NW NE
330 South, 1650 West, from NE corner Longitude: -98.1048674 Latitude: 37.5006893 County: Kingman Status: GAS |
Spud Date: 26-JUL-00
Completion Date: 06-SEP-00 Plugging Date: Total Depth: 4580 Form. at depth: SIMPSON Elevation: 1543 KB |
Test Number: 1 | Data Source: TRILOBITE |
Interval: 4132 to 4152
Formation tested: Mississippi | Date, Time: 02-AUG-00; 23:59:30 |
Initial Hydro Pressure: 2102 PSI
First Initial Flow Pressure: 82 PSI First Final Flow Pressure: 87 PSI Initial Shut-in Pressure: 1110 PSI Second Initial Flow Pressure: 46 PSI Second Final Flow Pressure: 94 PSI Final Shut-in Pressure: 1041 PSI Final Hydro Pressure: 2049 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 249.23 ft. Drill Pipe Length: ft. |
Initial Flow: Strong blow Bottom of bucket in 20 seconds. Gas to surface in 18 minutes Gauge gas. Initial Shut-In: Bled down for 10 minutes. No blow back. Final Flow: Strong blow. Bottom of bucket in 10 seconds. Gauge gas. Final Shut-In: Bled down for 10 minutes. No blow back. |
|
Bottom Hole Temperature: 130 DEG F
Percent Porosity: Samples: Caraway Analytical Gas Recovery: Comments: | |
Recovery 255 of Total Fluid 249 of Fluid in Drill Collars 6 of Fluid in Drill Pipe 3868 of Gas in pipe. 255 of Very slightly gas cut mud | |
View Pressures | View Recovery Gas |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |
Test Number: 2 | Data Source: TRILOBITE |
Interval: 4152 to 4176
Formation tested: Mississippi | Date, Time: 02-AUG-00; 16:05:17 |
Initial Hydro Pressure: 2117 PSI
First Initial Flow Pressure: 72 PSI First Final Flow Pressure: 63 PSI Initial Shut-in Pressure: 1128 PSI Second Initial Flow Pressure: 53 PSI Second Final Flow Pressure: 90 PSI Final Shut-in Pressure: 1047 PSI Final Hydro Pressure: 2131 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 249.23 ft. Drill Pipe Length: ft. |
Initial Flow: Weak blow built to bottom of bucket in 3 minutes. Initial Shut-In: Bled down for 2 minutes. No blow back. Final Flow: Strong blow bottom of bucket in 10 seconds. Gas to surface in 30 minutes Gauge gas. Final Shut-In: Bled down for 10 minutes. No blow back. |
|
Bottom Hole Temperature: 129 DEG F
Percent Porosity: Samples: Caraway Gas Recovery: Comments: | |
Recovery 200 of Total Fluid 200 of Fluid in Drill Collars 3954 of Gas in pipe. 200 of Gas & oil cut muddy water 140000 of Salinity (PPM) | |
View Pressures | View Recovery Gas |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |
Test Number: 3 | Data Source: TRILOBITE |
Interval: 4488 to 4522
Formation tested: Simpson | Date, Time: 04-AUG-00; 06:07:39 |
Initial Hydro Pressure: 2227 PSI
First Initial Flow Pressure: 524 PSI First Final Flow Pressure: 1076 PSI Initial Shut-in Pressure: 1676 PSI Second Initial Flow Pressure: 1101 PSI Second Final Flow Pressure: 1571 PSI Final Shut-in Pressure: 1675 PSI Final Hydro Pressure: 2147 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 249.23 ft. Drill Pipe Length: ft. |
Initial Flow: Strong blow bottom of bucket in 40 seconds. Initial Shut-In: Bled down for 2 minutes. Built back to bottom of bucket in 10 minutes. Final Flow: Strong blow bottom of bucket in 30 seconds. Final Shut-In: Bled down for 2 minutes. Built back to weak surface blow. |
|
Bottom Hole Temperature: 145 DEG F
Percent Porosity: Samples: Caraway Analytical Gas Recovery: Comments: | |
Recovery 3400 of Total Fluid 249.23 of Fluid in Drill Collars 3151 of Fluid in Drill Pipe 400 of Heavy mud cut water 3000 of Salt water 50000 of Salinity (PPM) | |
View Pressures | No Recovery Gas data. |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |