|
API: 15-119-21026
Operator: Raydon Exploration, Inc. Field: Wildcat Lease: Xit Well 2 |
Location: T35S R30W, Sec. 14, NE SW NW
1876 South, 4321 West, from NE corner Longitude: -100.556498 Latitude: 37.0058129 County: Meade Status: GAS |
Spud Date: 17-JUN-00
Completion Date: 21-JUL-00 Plugging Date: Total Depth: 6360 Form. at depth: CHESTER Elevation: 2384 KB |
| Test Number: 1 | Data Source: TRILOBITE |
|
Interval: 5680 to 5716
Formation tested: Morrow | Date, Time: 27-JUN-00; 18:25:14 |
|
Initial Hydro Pressure: 2685 PSI
First Initial Flow Pressure: 30 PSI First Final Flow Pressure: 32 PSI Initial Shut-in Pressure: 72 PSI Second Initial Flow Pressure: 26 PSI Second Final Flow Pressure: 33 PSI Final Shut-in Pressure: 75 PSI Final Hydro Pressure: 2630 PSI |
Tool Data Hole Size: 7.78 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 359 ft. Drill Pipe Length: 5325 ft. |
|
Initial Flow: Weak surface blow built to fair 4"" blow in 30 minutes. Initial Shut-In: No blow back. Final Flow: Weak, 1/2"" blow decreased to surface blow. Final Shut-In: No blow back. |
|
|
Bottom Hole Temperature: 119 DEG F
Percent Porosity: 10 Samples: None Gas Recovery: Comments: | |
|
Recovery 30 of Total Fluid 30 of Fluid in Drill Collars 30 of Drilling mud | |
| View Pressures | No Recovery Gas data. |
| Test Number: 2 | Data Source: TRILOBITE |
|
Interval: 5805 to 5865
Formation tested: Chester Limestone | Date, Time: 29-JUN-00; 05:19:01 |
|
Initial Hydro Pressure: 2765 PSI
First Initial Flow Pressure: 69 PSI First Final Flow Pressure: 47 PSI Initial Shut-in Pressure: 1930 PSI Second Initial Flow Pressure: 41 PSI Second Final Flow Pressure: 31 PSI Final Shut-in Pressure: 1863 PSI Final Hydro Pressure: 2704 PSI |
Tool Data Hole Size: 7.78 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 359 ft. Drill Pipe Length: 5451 ft. |
|
Initial Flow: Strong blow bottom of bucket in 15 seconds. Gas to surface in 6 minutes. Initial Shut-In: No blow back. Final Flow: Strong blow bottom of bucket immediately. Final Shut-In: No blow back. Gas will burn. |
|
|
Bottom Hole Temperature: 120 DEG F
Percent Porosity: 10 Samples: Caught one sample Gas Recovery: Comments: | |
|
Recovery 5 of Total Fluid 5 of Fluid in Drill Collars 5800 of Gas in pipe. 5 of Drilling mud | |
| View Pressures | View Recovery Gas |