Drill Stem Tests Database
Specific Well--15-119-21026
API: 15-119-21026
Operator: Raydon Exploration, Inc.
Field: Wildcat
Lease: Xit
Well 2
Location: T35S R30W, Sec. 14, NE SW NW
1876 South, 4321 West, from NE corner
Longitude: -100.556498
Latitude: 37.0058129
County: Meade
Status: GAS
Spud Date: 17-JUN-00
Completion Date: 21-JUL-00
Plugging Date:
Total Depth: 6360
Form. at depth: CHESTER
Elevation: 2384 KB

Download DST Test Data

Test Number: 1 Data Source: TRILOBITE
Interval: 5680 to 5716
Formation tested: Morrow
Date, Time: 27-JUN-00; 18:25:14
Initial Hydro Pressure: 2685 PSI
First Initial Flow Pressure: 30 PSI
First Final Flow Pressure: 32 PSI
Initial Shut-in Pressure: 72 PSI
Second Initial Flow Pressure: 26 PSI
Second Final Flow Pressure: 33 PSI
Final Shut-in Pressure: 75 PSI
Final Hydro Pressure: 2630 PSI
Tool Data
Hole Size: 7.78 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 359 ft.
Drill Pipe Length: 5325 ft.
Initial Flow: Weak surface blow built to fair 4"" blow in 30 minutes. Initial Shut-In: No blow back.
Final Flow: Weak, 1/2"" blow decreased to surface blow.
Final Shut-In: No blow back.
Bottom Hole Temperature: 119 DEG F
Percent Porosity: 10
Samples: None
Gas Recovery:
Comments:
Recovery
30 of Total Fluid
30 of Fluid in Drill Collars
30 of Drilling mud
View Pressures No Recovery Gas data.
 
Test Number: 2 Data Source: TRILOBITE
Interval: 5805 to 5865
Formation tested: Chester Limestone
Date, Time: 29-JUN-00; 05:19:01
Initial Hydro Pressure: 2765 PSI
First Initial Flow Pressure: 69 PSI
First Final Flow Pressure: 47 PSI
Initial Shut-in Pressure: 1930 PSI
Second Initial Flow Pressure: 41 PSI
Second Final Flow Pressure: 31 PSI
Final Shut-in Pressure: 1863 PSI
Final Hydro Pressure: 2704 PSI
Tool Data
Hole Size: 7.78 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 359 ft.
Drill Pipe Length: 5451 ft.
Initial Flow: Strong blow bottom of bucket in 15 seconds. Gas to surface in 6 minutes. Initial Shut-In: No blow back.
Final Flow: Strong blow bottom of bucket immediately.
Final Shut-In: No blow back. Gas will burn.
Bottom Hole Temperature: 120 DEG F
Percent Porosity: 10
Samples: Caught one sample
Gas Recovery:
Comments:
Recovery
5 of Total Fluid
5 of Fluid in Drill Collars
5800 of Gas in pipe.
5 of Drilling mud
View Pressures View Recovery Gas