Drill Stem Tests Database
Specific Well--15-171-20549
API: 15-171-20549
Operator: Wabash Energy Corp.
Field: Beckley North
Lease: Schowalter
Well 5
Location: T18S R32W, Sec. 12, NW NE
4480 North, 1980 West, from SE corner
Longitude: -100.8028417
Latitude: 38.5097802
County: Scott
Status: OIL-P&A
Spud Date: 16-JUN-00
Completion Date: 24-JUN-00
Plugging Date: 10-JUL-14
Total Depth: 4640
Form. at depth: MISSISSIPPIAN
Elevation: 2973 KB
Test Number: 1 Data Source: TRILOBITE
Interval: 4556 to 4578
Formation tested: Cherokee
Date, Time: 22-JUN-00; 20:02:30
Initial Hydro Pressure: 2272 PSI
First Initial Flow Pressure: 17 PSI
First Final Flow Pressure: 27 PSI
Initial Shut-in Pressure: 928 PSI
Second Initial Flow Pressure: 27 PSI
Second Final Flow Pressure: 44 PSI
Final Shut-in Pressure: 924 PSI
Final Hydro Pressure: 2260 PSI
Tool Data
Hole Size: 7.78 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.38 in.
Drill Collar Length: 31 ft.
Drill Pipe Length: 4534 ft.
Initial Flow: Weak surface blow built to 3 1/2"". Initial Shut-in: Bled 2"" no blow back.
Final Flow: Weak blow built to 4""
Final Shut-In: No blow back.
Bottom Hole Temperature: 140 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
90 of Total Fluid
31 of Fluid in Drill Collars
59 of Fluid in Drill Pipe
120 of Gas in pipe.
20 of Clean oil
70 of Gas cut oily mud
30 of Gravity (API)
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.