API: 15-187-20935
Operator: Berexco, Inc. Field: Arroyo Lease: P & P Well 2-28 |
Location: T29S R41W, Sec. 28, NE NE SE
2300 North, 330 West, from SE corner Longitude: -101.7991247 Latitude: 37.4967959 County: Stanton Status: D&A |
Spud Date: 13-AUG-00
Completion Date: 27-AUG-00 Plugging Date: 27-AUG-00 Total Depth: 5605 Form. at depth: ST LOUIS Elevation: 3382 KB |
Test Number: 1 | Data Source: TRILOBITE |
Interval: 5340 to 5360
Formation tested: Keyes | Date, Time: 23-AUG-00; 06:45:05 |
Initial Hydro Pressure: 2612 PSI
First Initial Flow Pressure: 27 PSI First Final Flow Pressure: 28 PSI Initial Shut-in Pressure: 428 PSI Second Initial Flow Pressure: 37 PSI Second Final Flow Pressure: 47 PSI Final Shut-in Pressure: 370 PSI Final Hydro Pressure: 2603 PSI |
Tool Data Hole Size: 7.78 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 363 ft. Drill Pipe Length: 4979 ft. |
Initial Flow: Surface blow built to 3"" in bucket. Initial Shut-In: No blow back. Final Flow: Surface blow built to 2 1/2"" in 40 minutes. Stabilized. Final Shut-In: No blow back. Remarks: Est. 6 Ft. of Pay. |
|
Bottom Hole Temperature: 132 DEG F
Percent Porosity: 12 Samples: None Gas Recovery: Comments: | |
Recovery 40 of Total Fluid 40 of Fluid in Drill Collars 200 of Gas in pipe 40 of Oil cut Mud | |
View Pressures | No Recovery Gas data. |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |
Test Number: 2 | Data Source: TRILOBITE |
Interval: 5359 to 5370
Formation tested: Keyes | Date, Time: 24-AUG-00; 11:29:08 |
Initial Hydro Pressure: 2565 PSI
First Initial Flow Pressure: 24 PSI First Final Flow Pressure: 25 PSI Initial Shut-in Pressure: 325 PSI Second Initial Flow Pressure: 27 PSI Second Final Flow Pressure: 32 PSI Final Shut-in Pressure: 556 PSI Final Hydro Pressure: 2514 PSI |
Tool Data Hole Size: 7.78 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 363 ft. Drill Pipe Length: 4979 ft. |
Initial Flow: Surface blow built to 2 1/4"" in bucket in 30 minutes. Initial Shut-In: No blow back. Final Flow: Surface blow built to 2 1/2"" in bucket in 60 minutes. Final Shut-In: No blow back. Remarks: Est. 9 Ft. of Pay. |
|
Bottom Hole Temperature: 130 DEG F
Percent Porosity: 12 Samples: None Gas Recovery: Comments: | |
Recovery 30 of Total Fluid 30 of Fluid in Drill Collars 90 of Gas in pipe 30 of Oil cut Mud | |
View Pressures | No Recovery Gas data. |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |