Drill Stem Tests Database
Specific Well--15-033-21113
API: 15-033-21113
Operator: AMERICAN WARRIOR INC.
Field: Wildcat
Lease: Barnes
Well 1-12
Location: T32S R19W, Sec. 12, NE SW
2129 North, 1933 East, from SW corner
Longitude: -99.3392563
Latitude: 37.2716948
County: Comanche
Status: O&G
Spud Date: 29-JUL-00
Completion Date: 21-AUG-00
Plugging Date:
Total Depth: 6024
Form. at depth: ARBUCKLE
Elevation: 2083 KB
Test Number: 1 Data Source: TRILOBITE
Interval: 5645 to 5687
Formation tested: Viola
Date, Time: 08-AUG-00; 21:04:05
Initial Hydro Pressure: 2714 PSI
First Initial Flow Pressure: 1903 PSI
First Final Flow Pressure: 1949 PSI
Initial Shut-in Pressure: 2012 PSI
Second Initial Flow Pressure: 1906 PSI
Second Final Flow Pressure: 1955 PSI
Final Shut-in Pressure: 2012 PSI
Final Hydro Pressure: 2692 PSI
Tool Data
Hole Size: 7.78 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.38 in.
Drill Collar Length: 414 ft.
Drill Pipe Length: 5230 ft.
Initial Flow: Strong blow bottom of bucket immediately. Gas to surface in 1 1/2 minutes. Gas will burn. Initial Shut-In: Bled 2"". No blow back.
Final Flow: Bottom of bucket immediately.
Final Shut-In: No blow back.
Bottom Hole Temperature: 140 DEG F
Percent Porosity:
Samples: Yes
Gas Recovery:
Comments:
Recovery
120 of Total Fluid
120 of Fluid in Drill Collars
120 of Water
70000 of Salinity (PPM)
View Pressures View Recovery Gas
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 2 Data Source: TRILOBITE
Interval: 5991 to 6024
Formation tested: Arbuckle
Date, Time: 10-AUG-00; 14:58:43
Initial Hydro Pressure: 2985 PSI
First Initial Flow Pressure: 113 PSI
First Final Flow Pressure: 949 PSI
Initial Shut-in Pressure: 2178 PSI
Second Initial Flow Pressure: 897 PSI
Second Final Flow Pressure: 1440 PSI
Final Shut-in Pressure: 2182 PSI
Final Hydro Pressure: 2932 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 414.21 ft.
Drill Pipe Length: ft.
Initial Flow: Fair blow bottom of bucket in 4 minutes. Initial Shut-In: Bled down for 90 seconds. Built back to 2 1/2"".
Final Flow: Strong blow built to bottom of bucket in 3 minutes.
Final Shut-In: Bled down for 10 minutes. no blow back.
Bottom Hole Temperature: 147 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
3365 of Total Fluid
414 of Fluid in Drill Collars
2951 of Fluid in Drill Pipe
120 of Slightly mud cut water
3245 of Salt water
100000 of Salinity (PPM)
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.