Drill Stem Tests Database
Specific Well--15-051-25048
API: 15-051-25048
Operator: Murfin Drilling Co.
Field: Wildcat
Lease: PFEIFER
Well 1-8
Location: T11S R20W, Sec. 8, SW NW NW NW
4863 North, 5174 West, from SE corner
Longitude: -99.5731954
Latitude: 39.1159096
County: Ellis
Status: OIL
Spud Date: 01-AUG-00
Completion Date: 18-AUG-00
Plugging Date:
Total Depth: 3775
Form. at depth: ARBUCKLE
Elevation: 2047 KB
Between Mendota South and Fischer fields; listed as SALINE BOW originally.
Test Number: 1 Data Source: TRILOBITE
Interval: 3103 to 3125
Formation tested: Topeka
Date, Time: 05-AUG-00; 05:19:09
Initial Hydro Pressure: 1476 PSI
First Initial Flow Pressure: 15 PSI
First Final Flow Pressure: 106 PSI
Initial Shut-in Pressure: 834 PSI
Second Initial Flow Pressure: 108 PSI
Second Final Flow Pressure: 176 PSI
Final Shut-in Pressure: 832 PSI
Final Hydro Pressure: 1448 PSI
Tool Data
Hole Size: 8 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 245 ft.
Drill Pipe Length: 2866 ft.
Initial Flow: Weak surface blow built to 8"" Initial Shut-In: No return blow
Final Flow: Weak surface return in 10 minutes. Steady throughout
Final Shut-In: No return blow
Bottom Hole Temperature: 109 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
365 of Total Fluid
245 of Fluid in Drill Collars
120 of Fluid in Drill Pipe
365 of Salty water
45000 of Salinity (PPM)
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 2 Data Source: TRILOBITE
Interval: 3330 to 3422
Formation tested: A-F LKC
Date, Time: 06-AUG-00; 12:01:33
Initial Hydro Pressure: 1651 PSI
First Initial Flow Pressure: 80 PSI
First Final Flow Pressure: 139 PSI
Initial Shut-in Pressure: 682 PSI
Second Initial Flow Pressure: 182 PSI
Second Final Flow Pressure: 206 PSI
Final Shut-in Pressure: 683 PSI
Final Hydro Pressure: 1579 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 245 ft.
Drill Pipe Length: 3087 ft.
Initial Flow: Packer failure-reset packers-Packers held-Weak blow building to 6"" fair blow
Final Flow: Fair blow building to 9""
Bottom Hole Temperature: 109 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
337 of Total Fluid
245 of Fluid in Drill Collars
92 of Fluid in Drill Pipe
180 of Gas in pipe
337 of Slightly oil cut mud
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 3 Data Source: TRILOBITE
Interval: 3477 to 3550
Formation tested: H-L LKC
Date, Time: 07-AUG-00; 08:45:13
Initial Hydro Pressure: 1766 PSI
First Initial Flow Pressure: 29 PSI
First Final Flow Pressure: 188 PSI
Initial Shut-in Pressure: 785 PSI
Second Initial Flow Pressure: 194 PSI
Second Final Flow Pressure: 333 PSI
Final Shut-in Pressure: 775 PSI
Final Hydro Pressure: 1712 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 245 ft.
Drill Pipe Length: 3241 ft.
Initial Flow: Strong bottom of bucket in 11 minutes
Final Flow: Strong bottom of bucket in 16 minutes
Bottom Hole Temperature: 114 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
797 of Total Fluid
245 of Fluid in Drill Collars
552 of Fluid in Drill Pipe
180 of Drilling mud
372 of Muddy water
245 of Water
65000 of Salinity (PPM)
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 4 Data Source: TRILOBITE
Interval: 3634 to 3643
Formation tested: Arbuckle
Date, Time: 08-AUG-00; 00:09:22
Initial Hydro Pressure: 1798 PSI
First Initial Flow Pressure: 263 PSI
First Final Flow Pressure: 374 PSI
Initial Shut-in Pressure: 897 PSI
Second Initial Flow Pressure: 464 PSI
Second Final Flow Pressure: 708 PSI
Final Shut-in Pressure: 879 PSI
Final Hydro Pressure: 1777 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 245 ft.
Drill Pipe Length: 3395 ft.
Initial Flow: Strong bottom of bucket in 2 minutes. Initial Shut-In: No blow back.
Final Flow: Strong bottom of bucket in 1 minutes.
Final Shut-In: Weak steady surface blow.
Bottom Hole Temperature: 118 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
1751 of Total Fluid
245 of Fluid in Drill Collars
1506 of Fluid in Drill Pipe
120 of Gas in pipe
573 of Clean gassy oil
186 of Oil cut gassy water
992 of Water w/ scum of oil on top
32000 of Salinity (PPM)
34 of Gravity (API)
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 5 Data Source: TRILOBITE
Interval: 3662 to 3674
Formation tested: Arbuckle
Date, Time: 08-AUG-00; 16:33:05
Initial Hydro Pressure: 1793 PSI
First Initial Flow Pressure: 112 PSI
First Final Flow Pressure: 661 PSI
Initial Shut-in Pressure: 1197 PSI
Second Initial Flow Pressure: 667 PSI
Second Final Flow Pressure: 952 PSI
Final Shut-in Pressure: 1197 PSI
Final Hydro Pressure: 1718 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 245 ft.
Drill Pipe Length: 3426 ft.
Initial Flow: Strong bottom of bucket in 1.5 minutes. Initial Shut-In: No blow back.
Final Flow: Strong bottom of bucket in 2 minutes.
Final Shut-In: No blow back
Bottom Hole Temperature: 118 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
2356 of Total Fluid
245 of Fluid in Drill Collars
2111 of Fluid in Drill Pipe
65 of Clean oil
500 of Slightly oil cut water
1791 of Water w/ scum of oil on top
30000 of Salinity (PPM)
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.