Drill Stem Tests Database
Specific Well--15-095-21770
API: 15-095-21770
Operator: American Energies Corp.
Field: Wildcat
Lease: ANTHONY
Well A-1
Location: T30S R10W, Sec. 34, SW SW
660 North, 660 East, from SW corner
Longitude: -98.4074968
Latitude: 37.3858425
County: Kingman
Status: GAS-P&A
Spud Date: 31-JUL-00
Completion Date: 20-SEP-00
Plugging Date: 20-FEB-02
Total Depth: 4546
Form. at depth: MISSISSIPPIAN
Elevation: 1711 KB
Test Number: 1 Data Source: TRILOBITE
Interval: 4162 to 4203
Formation tested: Swope
Date, Time: 05-AUG-00; 23:34:11
Initial Hydro Pressure: 2067 PSI
First Initial Flow Pressure: 29 PSI
First Final Flow Pressure: 65 PSI
Initial Shut-in Pressure: 1560 PSI
Second Initial Flow Pressure: 65 PSI
Second Final Flow Pressure: 93 PSI
Final Shut-in Pressure: 1456 PSI
Final Hydro Pressure: 2029 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 241.83 ft.
Drill Pipe Length: ft.
Initial Flow: Weak blow built to 1"" in H2O bucket. Initial Shut-In: Bled down for 2 minutes. No blow back
Final Flow: Weak blow built to 1/4"" in H2O.
Final Shut-In: No blow back.
Bottom Hole Temperature: 124 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
130 of Total Fluid
130 of Fluid in Drill Collars
130 of Heavy mud cut water
18000 of Salinity (PPM)
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 2 Data Source: TRILOBITE
Interval: 4361 to 4423
Formation tested: Mississippian
Date, Time: 07-AUG-00; 03:08:26
Initial Hydro Pressure: 2221 PSI
First Initial Flow Pressure: 247 PSI
First Final Flow Pressure: 209 PSI
Initial Shut-in Pressure: 1453 PSI
Second Initial Flow Pressure: 166 PSI
Second Final Flow Pressure: 171 PSI
Final Shut-in Pressure: 1244 PSI
Final Hydro Pressure: 1082 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 241.83 ft.
Drill Pipe Length: ft.
Initial Flow: Strong blow built to bottom of bucket in 30 seconds. Gas to surface in 5 minutes. Gauge gas. Initial Shut-In: Bled down for 10 minutes. No blow back.
Final Flow: Strong blow bottom of bucket in 10 seconds. Gauge gas.
Final Shut-In: Bled down for back.
Bottom Hole Temperature: 130 DEG F
Percent Porosity:
Samples: Caraway Analytical 728 N.Roosevelt
Gas Recovery:
Comments:
Recovery
361 of Total Fluid
241.83 of Fluid in Drill Collars
119.17 of Fluid in Drill Pipe
3992 of Gas in pipe.
120 of Slightly gas cut mud
241 of Heavy gas cut watery mud
25000 of Salinity (PPM)
View Pressures View Recovery Gas
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 3 Data Source: TRILOBITE
Interval: 4390 to 4428
Formation tested: Mississippi
Date, Time: 08-AUG-00; 11:52:53
Initial Hydro Pressure: 2240 PSI
First Initial Flow Pressure: 86 PSI
First Final Flow Pressure: 138 PSI
Initial Shut-in Pressure: 1531 PSI
Second Initial Flow Pressure: 120 PSI
Second Final Flow Pressure: 167 PSI
Final Shut-in Pressure: 1379 PSI
Final Hydro Pressure: 2152 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 241.83 ft.
Drill Pipe Length: ft.
Initial Flow: Fair blow built to bottom of bucket in 4 minutes. Gas to surface in 16 minutes. Gauge gas. Initial Shut-In: Bled down for 10 minutes. No blow back.
Final Flow: Strong blow bottom of bucket in 20 seconds. Gauge gas.
Final Shut-In: Bled down for 10 minutes. Very slight surface blow back.
Bottom Hole Temperature: 128 DEG F
Percent Porosity:
Samples: Caraway Ananlytical
Gas Recovery:
Comments:
Recovery
430 of Total Fluid
241.83 of Fluid in Drill Collars
188.17 of Fluid in Drill Pipe
3955 of Gas in pipe
90 of Slightly gas cut water mud
340 of Gas & oil cut muddy water
18000 of Salinity (PPM)
View Pressures View Recovery Gas
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.