Drill Stem Tests Database
Specific Well--15-033-21129
API: 15-033-21129
Operator: AMERICAN WARRIOR, INC. PELICAN HILL
Field: Yorklaw
Lease: York
Well 1-6
Location: T32S R17W, Sec. 6, NW NE NW
4643 North, 3365 West, from SE corner
Longitude: -99.21289
Latitude: 37.29411
County: Comanche
Status: GAS-P&A
Spud Date: 22-AUG-00
Completion Date: 01-SEP-00
Plugging Date: 02-NOV-04
Total Depth: 5350
Form. at depth: ARBUCKLE
Elevation: 2121 KB
Test Number: 1 Data Source: TRILOBITE
Interval: 4945 to 4982
Formation tested: Altamont
Date, Time: 28-AUG-00; 20:31:29
Initial Hydro Pressure: 2457 PSI
First Initial Flow Pressure: 58 PSI
First Final Flow Pressure: 62 PSI
Initial Shut-in Pressure: 1745 PSI
Second Initial Flow Pressure: 101 PSI
Second Final Flow Pressure: 80 PSI
Final Shut-in Pressure: 1733 PSI
Final Hydro Pressure: 2416 PSI
Tool Data
Hole Size: 7.875 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 270 ft.
Drill Pipe Length: 4651 ft.
Initial Flow: Strong blow. Gas to surface in 8 minutes. (see gas volume report) Initial Shut-In: Weak to fair blow.
Final Flow: Strong blow. (see gas volume report)
Final Shut-In: Weak to fair blow.
Bottom Hole Temperature: 125 DEG F
Percent Porosity: 12
Samples: Gas sample
Gas Recovery:
Comments:
Recovery
210 of Total Fluid
210 of Fluid in Drill Pipe
210 of Gas cut mud
5000 of Salinity (PPM)
View Pressures View Recovery Gas
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 2 Data Source: TRILOBITE
Interval: 5079 to 5150
Formation tested: Mississippi
Date, Time: 29-AUG-00; 23:50:23
Initial Hydro Pressure: 2484 PSI
First Initial Flow Pressure: 220 PSI
First Final Flow Pressure: 127 PSI
Initial Shut-in Pressure: 1726 PSI
Second Initial Flow Pressure: 164 PSI
Second Final Flow Pressure: 128 PSI
Final Shut-in Pressure: 1725 PSI
Final Hydro Pressure: 2425 PSI
Tool Data
Hole Size: 7.875 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 270 ft.
Drill Pipe Length: 4805 ft.
Initial Flow: Strong blow. Gas to surface in 3 1/2 minutes. (see gas volume report) Initial Shut-In: Fair blow.
Final Flow: Strong blow. (see gas volume report)
Final Shut-In: Fair blow.
Bottom Hole Temperature: 134 DEG F
Percent Porosity: 16
Samples: Gas sample
Gas Recovery:
Comments:
Recovery
300 of Total Fluid
270 of Fluid in Drill Collars
30 of Fluid in Drill Pipe
300 of Gas cut mud
8000 of Salinity (PPM)
View Pressures View Recovery Gas
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.