Drill Stem Tests Database
Specific Well--15-155-21443
API: 15-155-21443
Operator: Corsair Energy, LC
Field: Huntsville East Ext
Lease: Holmes
Well 1-16
Location: T23S R9W, Sec. 16, SE SE NW
2310 South, 2310 East, from NW corner
Longitude: -98.3176044
Latitude: 38.0509341
County: Reno
Status: D&A
Spud Date: 08-AUG-00
Completion Date: 16-AUG-00
Plugging Date: 15-AUG-00
Total Depth: 3770
Form. at depth: VIOLA
Elevation: 1742 KB
Test Number: 1 Data Source: TRILOBITE
Interval: 3054 to 3105
Formation tested: Douglas
Date, Time: 12-AUG-00; 05:25:46
Initial Hydro Pressure: 1448 PSI
First Initial Flow Pressure: 135 PSI
First Final Flow Pressure: 433 PSI
Initial Shut-in Pressure: 1195 PSI
Second Initial Flow Pressure: 445 PSI
Second Final Flow Pressure: 670 PSI
Final Shut-in Pressure: 1190 PSI
Final Hydro Pressure: 1492 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 248.78 ft.
Drill Pipe Length: ft.
Initial Flow: Strong blow bottom of bucket in 45 seconds. Tool slid 18' to bottom. Initial Shut-In: Bled down for 5 minutes. No blow back
Final Flow: Fair blow bottom of bucket in 5 1/2 minutes.
Final Shut-In: Bled down for 10 minutes. No blow back.
Bottom Hole Temperature: 107 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
1400 of Total Fluid
248.78 of Fluid in Drill Collars
1152 of Fluid in Drill Pipe
120 of Slightly mud cut water
1280 of Salt water
55000 of Salinity (PPM)
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 2 Data Source: TRILOBITE
Interval: 3634 to 3697
Formation tested: Miss./Conglomerate
Date, Time: 14-AUG-00; 02:06:18
Initial Hydro Pressure: 1885 PSI
First Initial Flow Pressure: 198 PSI
First Final Flow Pressure: 510 PSI
Initial Shut-in Pressure: 1155 PSI
Second Initial Flow Pressure: 513 PSI
Second Final Flow Pressure: 755 PSI
Final Shut-in Pressure: 1155 PSI
Final Hydro Pressure: 1828 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 248.78 ft.
Drill Pipe Length: ft.
Initial Flow: Strong blow bottom of bucket in 30 seconds. Initial Shut-In: Bled down for 2 minutes. No blow back.
Final Flow: Strong blow bottom of bucket in 1 minutes.
Final Shut-In: Bled down for 10 minutes. Built back to 1 1/2"" in H2O bucket.
Bottom Hole Temperature: 119 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
1775 of Total Fluid
248.78 of Fluid in Drill Collars
1849 of Gas in pipe
525 of Very Slightly oil cut gassy mud
1250 of Slightly gas cut water
46000 of Salinity (PPM)
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.