Drill Stem Tests Database
Specific Well--15-081-21302
API: 15-081-21302
Operator: HELMERICH & PAYNE
Field: Pleasant Prairie
Lease: MARY JONES
Well 1
Location: T27S R34W, Sec. 3, SW SW NE
2310 South, 2100 West, from NE corner
Longitude: -101.02388
Latitude: 37.73025
County: Haskell
Status: OIL
Spud Date: 22-JUN-00
Completion Date: 26-JUL-00
Plugging Date:
Total Depth: 5355
Form. at depth: CHESTER
Elevation: 2979 KB
Test Number: 1 Data Source: TRILOBITE
Interval: 4947 to 5100
Formation tested: Morrow
Date, Time: 29-JUN-00; 04:58:01
Initial Hydro Pressure: 2420 PSI
First Initial Flow Pressure: 34 PSI
First Final Flow Pressure: 39 PSI
Initial Shut-in Pressure: 201 PSI
Second Initial Flow Pressure: 41 PSI
Second Final Flow Pressure: 43 PSI
Final Shut-in Pressure: 127 PSI
Final Hydro Pressure: 2387 PSI
Tool Data
Hole Size: 7.875 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 712 ft.
Drill Pipe Length: 4367 ft.
Initial Flow: 1/4"" @ open, built to 1"". Initial Shut-In: No return.
Final Flow: Bubble to open tool, no blow.
Final Shut-In: No return.
Bottom Hole Temperature: 122 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
20 of Total Fluid
20 of Fluid in Drill Collars
20 of Drilling mud
1700 of Salinity (PPM)
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 2 Data Source: TRILOBITE
Interval: 5136 to 5235
Formation tested: Chester
Date, Time: 30-JUN-00; 07:08:15
Initial Hydro Pressure: 2626 PSI
First Initial Flow Pressure: 338 PSI
First Final Flow Pressure: 618 PSI
Initial Shut-in Pressure: 1376 PSI
Second Initial Flow Pressure: 645 PSI
Second Final Flow Pressure: 1146 PSI
Final Shut-in Pressure: 1377 PSI
Final Hydro Pressure: 2427 PSI
Tool Data
Hole Size: 7.875 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 712 ft.
Drill Pipe Length: 4479 ft.
Initial Flow: Bottom of bucket in 1 minute. Initial Shut-In: Bottom of bucket for 6 minutes. Return to bottom of bucket in 9 minutes.
Final Flow: Bottom of bucket @ open.
Final Shut-In: Bottom of bucket for 10 minutes. Gas to surface 5 minutes into shut-in. Return to bottom of bucket in 6 minutes.
Bottom Hole Temperature: 132 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
2880 of Total Fluid
712 of Fluid in Drill Collars
2168 of Fluid in Drill Pipe
2760 of Clean gassy oil
120 of Slightly mud cut gassy oil
26 of Gravity (API)
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.