Drill Stem Tests Database
Specific Well--15-051-25032
API: 15-051-25032
Operator: HESS OIL COMPANY
Field: Gasaway
Lease: BILLINGER
Well 1-2
Location: T11S R19W, Sec. 2, S2 NE NW
1100 South, 1900 East, from NW corner
Longitude: -99.3993823
Latitude: 39.129658
County: Ellis
Status: OIL
Spud Date: 22-JUN-00
Completion Date: 18-JUL-00
Plugging Date:
Total Depth: 3709
Form. at depth: ARBUCKLE
Elevation: 2135 KB
Test Number: 1 Data Source: TRILOBITE
Interval: 3080 to 3110
Formation tested: Topeka
Date, Time: 25-JUN-00; 16:40:24
Initial Hydro Pressure: 1525 PSI
First Initial Flow Pressure: 17 PSI
First Final Flow Pressure: 43 PSI
Initial Shut-in Pressure: 748 PSI
Second Initial Flow Pressure: 41 PSI
Second Final Flow Pressure: 81 PSI
Final Shut-in Pressure: 711 PSI
Final Hydro Pressure: 1515 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 208 ft.
Drill Pipe Length: 2863 ft.
Initial Flow: Weak 1/2"" blow building 3"". Initial Shut-In: No blow.
Final Flow: Weak surface blow building to 2.5"".
Final Shut-In: No blow.
Bottom Hole Temperature: 102 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
130 of Total Fluid
130 of Fluid in Drill Collars
70 of Mud & water cut oil
60 of Slighty oil & mud cut water
34000 of Salinity (PPM)
View Pressures View Recovery Gas
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 2 Data Source: TRILOBITE
Interval: 3350 to 3440
Formation tested: Lansing
Date, Time: 26-JUN-00; 18:20:55
Initial Hydro Pressure: 1728 PSI
First Initial Flow Pressure: 54 PSI
First Final Flow Pressure: 101 PSI
Initial Shut-in Pressure: 701 PSI
Second Initial Flow Pressure: 100 PSI
Second Final Flow Pressure: 125 PSI
Final Shut-in Pressure: 746 PSI
Final Hydro Pressure: 1683 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 114 ft.
Drill Pipe Length: 3242 ft.
Initial Flow: Weak 1/4"" blow building to 6"" Initial Shut-In: Very weak surface blow
Final Flow: Weak surface blow building bottom of bucket in 50 minutes
Final Shut-In: No blow.
Bottom Hole Temperature: 102 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
190 of Total Fluid
114 of Fluid in Drill Collars
76 of Fluid in Drill Pipe
180 of Gas in pipe
15 of Heavy oil cut mud
120 of Gassy mud & water cut oil
55 of Gassy heavy mud & water cut oil
24000 of Salinity (PPM)
View Pressures View Recovery Gas
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 3 Data Source: TRILOBITE
Interval: 3445 to 3560
Formation tested: lkc
Date, Time: 27-JUN-00; 12:03:22
Initial Hydro Pressure: 1751 PSI
First Initial Flow Pressure: 27 PSI
First Final Flow Pressure: 62 PSI
Initial Shut-in Pressure: 1001 PSI
Second Initial Flow Pressure: 72 PSI
Second Final Flow Pressure: 87 PSI
Final Shut-in Pressure: 976 PSI
Final Hydro Pressure: 1701 PSI
Tool Data
Hole Size: 7.78 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 114 ft.
Drill Pipe Length: 3341 ft.
Initial Flow: 1"" blow building to 5"". Initial Shut-In: No blow.
Final Flow: Surface blow building to 2""
Final Shut-In: No blow.
Bottom Hole Temperature: 98 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
165 of Total Fluid
114 of Fluid in Drill Collars
45 of Fluid in Drill Pipe
25 of Clean oil
20 of Heavy oil cut mud
120 of Oil cut mud
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 4 Data Source: TRILOBITE
Interval: 3590 to 3652
Formation tested: Arbuckle
Date, Time: 28-JUN-00; 04:02:12
Initial Hydro Pressure: 1838 PSI
First Initial Flow Pressure: 19 PSI
First Final Flow Pressure: 33 PSI
Initial Shut-in Pressure: 1028 PSI
Second Initial Flow Pressure: 36 PSI
Second Final Flow Pressure: 55 PSI
Final Shut-in Pressure: 973 PSI
Final Hydro Pressure: 1771 PSI
Tool Data
Hole Size: 7.78 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 240 ft.
Drill Pipe Length: 3360 ft.
Initial Flow: Weak blow throughout 1/2"" blow. Initial Shut-In: No blow.
Final Flow: Very weak blow throughout. 1/4"" blow.
Final Shut-In: No blow
Bottom Hole Temperature: 104 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
90 of Total Fluid
90 of Fluid in Drill Collars
50 of Clean Oil
40 of Heavy oil cut mud
25 of Gravity (API)
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 5 Data Source: TRILOBITE
Interval: 3648 to 3657
Formation tested: Arbuckle
Date, Time: 28-JUN-00; 15:12:38
Initial Hydro Pressure: 1844 PSI
First Initial Flow Pressure: 14 PSI
First Final Flow Pressure: 26 PSI
Initial Shut-in Pressure: 1114 PSI
Second Initial Flow Pressure: 27 PSI
Second Final Flow Pressure: 43 PSI
Final Shut-in Pressure: 1096 PSI
Final Hydro Pressure: 1791 PSI
Tool Data
Hole Size: 7.78 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 145 ft.
Drill Pipe Length: 3489 ft.
Initial Flow: Weak blow throughout 1/4"" blow. Initial Shut-In: No blow.
Final Flow: Very weak surface blow throughout.
Final Shut-In: No blow.
Bottom Hole Temperature: 106 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
60 of Total Fluid
60 of Fluid in Drill Collars
60 of Slightly oil cut muddy water
14000 of Salinity (PPM)
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.