Drill Stem Tests Database
Specific Well--15-033-21029
API: 15-033-21029
Operator: CLX Energy, Inc. and KFG Petroleum Corp.
Field: Nescatunga
Lease: Acres
Well 2
Location: T32S R18W, Sec. 21, NW NE SW
2275 North, 3529 West, from SE corner
Longitude: -99.2855
Latitude: 37.24357
County: Comanche
Status: GAS-P&A
Spud Date: 16-SEP-99
Completion Date: 29-SEP-99
Plugging Date: 20-APR-05
Total Depth: 5440
Form. at depth: MISSISSIPPIAN
Elevation: 2124 KB
Test Number: 1 Data Source: TRILOBITE
Interval: 4714 to 4740
Formation tested: Drum
Date, Time: 23-SEP-99; 21:51:49
Initial Hydro Pressure: 2312 PSI
First Initial Flow Pressure: 18 PSI
First Final Flow Pressure: 26 PSI
Initial Shut-in Pressure: 1658 PSI
Second Initial Flow Pressure: 32 PSI
Second Final Flow Pressure: 33 PSI
Final Shut-in Pressure: 1590 PSI
Final Hydro Pressure: 2188 PSI
Tool Data
Hole Size: 7.875 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: ft.
Drill Pipe Length: 4717 ft.
Initial Flow: Weak blow 1/2"" Initial Shut-in: No blow
Final Flow: Very weak blow (surface)
Final Shut-in: No blow
Bottom Hole Temperature: 112 DEG F
Percent Porosity: 9
Samples: none
Gas Recovery:
Comments:
Recovery
25 of Total Fluid
25 of Fluid in Drill Pipe
25 of Heavy mud
6000 of Salinity (PPM)
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 2 Data Source: TRILOBITE
Interval: 4810 to 4861
Formation tested: Swope
Date, Time: 24-SEP-99; 17:49:59
Initial Hydro Pressure: 2357 PSI
First Initial Flow Pressure: 35 PSI
First Final Flow Pressure: 188 PSI
Initial Shut-in Pressure: 1594 PSI
Second Initial Flow Pressure: 188 PSI
Second Final Flow Pressure: 271 PSI
Final Shut-in Pressure: 1557 PSI
Final Hydro Pressure: 2251 PSI
Tool Data
Hole Size: 7.875 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: ft.
Drill Pipe Length: 4797 ft.
Initial Flow: Fair to strong blow bottom of bucket in 14 mins. Initial Shut-in: No blow.
Final Flow: Fair to strong blot bottom of bucket in 28 mins.
Final Shut-in: No blow
Bottom Hole Temperature: 122 DEG F
Percent Porosity: 15
Samples: none
Gas Recovery:
Comments:
Recovery
525 of Total Fluid
525 of Fluid in Drill Pipe
90 of Drilling mud
435 of Muddy water 12% mud 88% water
127000 of Salinity (PPM)
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 3 Data Source: TRILOBITE
Interval: 5066 to 5129
Formation tested: Pawnee/Ft.Scott
Date, Time: 26-SEP-99; 03:44:15
Initial Hydro Pressure: 2512 PSI
First Initial Flow Pressure: 30 PSI
First Final Flow Pressure: 42 PSI
Initial Shut-in Pressure: 167 PSI
Second Initial Flow Pressure: 66 PSI
Second Final Flow Pressure: 77 PSI
Final Shut-in Pressure: 1847 PSI
Final Hydro Pressure: 2368 PSI
Tool Data
Hole Size: 7.875 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: ft.
Drill Pipe Length: 5048 ft.
Initial Flow: Strong blow gas to surface in 24 mins (see gas volume report) Initial Shut-in: Strong blow throughout.
Final Flow: Strong blow (see gas volume report)
Final Shut-in: No blow
Bottom Hole Temperature: 116 DEG F
Percent Porosity: 14
Samples: gas sample
Gas Recovery:
Comments:
Recovery
130 of Total Fluid
130 of Fluid in Drill Pipe
130 of Slight gas cut mud 2% gas 98% mud
9000 of Salinity (PPM)
View Pressures View Recovery Gas
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 4 Data Source: TRILOBITE
Interval: 5180 to 5240
Formation tested: Miss.
Date, Time: 27-SEP-99; 03:47:47
Initial Hydro Pressure: 2561 PSI
First Initial Flow Pressure: 35 PSI
First Final Flow Pressure: 33 PSI
Initial Shut-in Pressure: 264 PSI
Second Initial Flow Pressure: 31 PSI
Second Final Flow Pressure: 39 PSI
Final Shut-in Pressure: 262 PSI
Final Hydro Pressure: 2472 PSI
Tool Data
Hole Size: 7.875 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: ft.
Drill Pipe Length: 5175 ft.
Initial Flow: Weak to fair blow, slow increase to 8"" Initial Shut-in: No blow.
Final Flow: Strong blow bottom of bucket in 4 mins.
Final Shut-in: No blow
Bottom Hole Temperature: 117 DEG F
Percent Porosity: 14
Samples: none
Gas Recovery:
Comments:
Recovery
61 of Total Fluid
61 of Fluid in Drill Pipe
430 of Gas in pipe.
61 of Slight gas cut mud 2% gas 98% mud
9000 of Salinity (PPM)
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.