API: 15-033-21029
Operator: CLX Energy, Inc. and KFG Petroleum Corp. Field: Nescatunga Lease: Acres Well 2 |
Location: T32S R18W, Sec. 21, NW NE SW
2275 North, 3529 West, from SE corner Longitude: -99.2855 Latitude: 37.24357 County: Comanche Status: GAS-P&A |
Spud Date: 16-SEP-99
Completion Date: 29-SEP-99 Plugging Date: 20-APR-05 Total Depth: 5440 Form. at depth: MISSISSIPPIAN Elevation: 2124 KB |
Test Number: 1 | Data Source: TRILOBITE |
Interval: 4714 to 4740
Formation tested: Drum | Date, Time: 23-SEP-99; 21:51:49 |
Initial Hydro Pressure: 2312 PSI
First Initial Flow Pressure: 18 PSI First Final Flow Pressure: 26 PSI Initial Shut-in Pressure: 1658 PSI Second Initial Flow Pressure: 32 PSI Second Final Flow Pressure: 33 PSI Final Shut-in Pressure: 1590 PSI Final Hydro Pressure: 2188 PSI |
Tool Data Hole Size: 7.875 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: ft. Drill Pipe Length: 4717 ft. |
Initial Flow: Weak blow 1/2"" Initial Shut-in: No blow Final Flow: Very weak blow (surface) Final Shut-in: No blow |
|
Bottom Hole Temperature: 112 DEG F
Percent Porosity: 9 Samples: none Gas Recovery: Comments: | |
Recovery 25 of Total Fluid 25 of Fluid in Drill Pipe 25 of Heavy mud 6000 of Salinity (PPM) | |
View Pressures | No Recovery Gas data. |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |
Test Number: 2 | Data Source: TRILOBITE |
Interval: 4810 to 4861
Formation tested: Swope | Date, Time: 24-SEP-99; 17:49:59 |
Initial Hydro Pressure: 2357 PSI
First Initial Flow Pressure: 35 PSI First Final Flow Pressure: 188 PSI Initial Shut-in Pressure: 1594 PSI Second Initial Flow Pressure: 188 PSI Second Final Flow Pressure: 271 PSI Final Shut-in Pressure: 1557 PSI Final Hydro Pressure: 2251 PSI |
Tool Data Hole Size: 7.875 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: ft. Drill Pipe Length: 4797 ft. |
Initial Flow: Fair to strong blow bottom of bucket in 14 mins. Initial Shut-in: No blow. Final Flow: Fair to strong blot bottom of bucket in 28 mins. Final Shut-in: No blow |
|
Bottom Hole Temperature: 122 DEG F
Percent Porosity: 15 Samples: none Gas Recovery: Comments: | |
Recovery 525 of Total Fluid 525 of Fluid in Drill Pipe 90 of Drilling mud 435 of Muddy water 12% mud 88% water 127000 of Salinity (PPM) | |
View Pressures | No Recovery Gas data. |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |
Test Number: 3 | Data Source: TRILOBITE |
Interval: 5066 to 5129
Formation tested: Pawnee/Ft.Scott | Date, Time: 26-SEP-99; 03:44:15 |
Initial Hydro Pressure: 2512 PSI
First Initial Flow Pressure: 30 PSI First Final Flow Pressure: 42 PSI Initial Shut-in Pressure: 167 PSI Second Initial Flow Pressure: 66 PSI Second Final Flow Pressure: 77 PSI Final Shut-in Pressure: 1847 PSI Final Hydro Pressure: 2368 PSI |
Tool Data Hole Size: 7.875 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: ft. Drill Pipe Length: 5048 ft. |
Initial Flow: Strong blow gas to surface in 24 mins (see gas volume report) Initial Shut-in: Strong blow throughout. Final Flow: Strong blow (see gas volume report) Final Shut-in: No blow |
|
Bottom Hole Temperature: 116 DEG F
Percent Porosity: 14 Samples: gas sample Gas Recovery: Comments: | |
Recovery 130 of Total Fluid 130 of Fluid in Drill Pipe 130 of Slight gas cut mud 2% gas 98% mud 9000 of Salinity (PPM) | |
View Pressures | View Recovery Gas |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |
Test Number: 4 | Data Source: TRILOBITE |
Interval: 5180 to 5240
Formation tested: Miss. | Date, Time: 27-SEP-99; 03:47:47 |
Initial Hydro Pressure: 2561 PSI
First Initial Flow Pressure: 35 PSI First Final Flow Pressure: 33 PSI Initial Shut-in Pressure: 264 PSI Second Initial Flow Pressure: 31 PSI Second Final Flow Pressure: 39 PSI Final Shut-in Pressure: 262 PSI Final Hydro Pressure: 2472 PSI |
Tool Data Hole Size: 7.875 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: ft. Drill Pipe Length: 5175 ft. |
Initial Flow: Weak to fair blow, slow increase to 8"" Initial Shut-in: No blow. Final Flow: Strong blow bottom of bucket in 4 mins. Final Shut-in: No blow |
|
Bottom Hole Temperature: 117 DEG F
Percent Porosity: 14 Samples: none Gas Recovery: Comments: | |
Recovery 61 of Total Fluid 61 of Fluid in Drill Pipe 430 of Gas in pipe. 61 of Slight gas cut mud 2% gas 98% mud 9000 of Salinity (PPM) | |
View Pressures | No Recovery Gas data. |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |