Drill Stem Tests Database
Specific Well--15-097-21443
API: 15-097-21443
Operator: VINCENT OIL CORP
Field: Nichols
Lease: Koehn
Well 1-24
Location: T29S R19W, Sec. 24, S2 SE NW
3085 North, 3411 West, from SE corner
Longitude: -99.3494
Latitude: 37.50681
County: Kiowa
Status: GAS-P&A
Spud Date: 10-SEP-99
Completion Date: 25-SEP-99
Plugging Date: 08-NOV-07
Total Depth: 5090
Form. at depth: MISSISSIPPIAN
Elevation: 2335 KB
Test Number: 1 Data Source: TRILOBITE
Interval: 4407 to 4441
Formation tested: Lans.
Date, Time: 16-SEP-99; 14:09:02
Initial Hydro Pressure: 2164 PSI
First Initial Flow Pressure: 16 PSI
First Final Flow Pressure: 21 PSI
Initial Shut-in Pressure: 1022 PSI
Second Initial Flow Pressure: 23 PSI
Second Final Flow Pressure: 27 PSI
Final Shut-in Pressure: 1047 PSI
Final Hydro Pressure: 2142 PSI
Tool Data
Hole Size: 7.875 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: ft.
Drill Pipe Length: 4413 ft.
Initial Flow: Strong blow bottom of bucket in 1 min. Initial Shut-in: Strong blow bottom of bucket in 8 mins.
Final Flow: Strong blow bottom of bucket in 5- 10 secs.
Final Shut-in: Weak blow 1""-3""
Bottom Hole Temperature: 110 DEG F
Percent Porosity: 10
Samples: none
Gas Recovery:
Comments:
Recovery
35 of Total Fluid
35 of Fluid in Drill Pipe
2830 of Gas in pipe,
35 of Drilling mud
5000 of Salinity (PPM)
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 2 Data Source: TRILOBITE
Interval: 4476 to 4510
Formation tested: Lans.
Date, Time: 18-SEP-99; 08:10:59
Initial Hydro Pressure: 2080 PSI
First Initial Flow Pressure: 50 PSI
First Final Flow Pressure: 81 PSI
Initial Shut-in Pressure: 1285 PSI
Second Initial Flow Pressure: 98 PSI
Second Final Flow Pressure: 140 PSI
Final Shut-in Pressure: 1245 PSI
Final Hydro Pressure: 2084 PSI
Tool Data
Hole Size: 7.875 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: ft.
Drill Pipe Length: 4474 ft.
Initial Flow: Strong blow bottom of bucket in 5-10 secs. Initial Shut-in: Fair to strong blow.
Final Flow: Strong blow bottom of bucket in 1 min. gas to surface in 3 mins. (see gas volume report)
Final Shut-in: Weak to fair blow
Bottom Hole Temperature: 112 DEG F
Percent Porosity: 12
Samples: gas sample
Gas Recovery:
Comments:
Recovery
275 of Total Fluid
275 of Fluid in Drill Pipe
150 of Drilling mud
125 of Salt water
127000 of Salinity (PPM)
View Pressures View Recovery Gas
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 3 Data Source: TRILOBITE
Interval: 4526 to 4590
Formation tested: Lans.
Date, Time: 19-SEP-99; 07:23:36
Initial Hydro Pressure: 2197 PSI
First Initial Flow Pressure: 118 PSI
First Final Flow Pressure: 695 PSI
Initial Shut-in Pressure: 1445 PSI
Second Initial Flow Pressure: 705 PSI
Second Final Flow Pressure: 1205 PSI
Final Shut-in Pressure: 1441 PSI
Final Hydro Pressure: 2097 PSI
Tool Data
Hole Size: 7.875 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: ft.
Drill Pipe Length: 4507 ft.
Initial Flow: Strong blow bottom of bucket in 2 1/2 mins. Initial Shut-in: Weak blow (1/4"")
Final Flow: Strong blow bottom of bucket in 3 mins.
Final Shut-in: No blow
Bottom Hole Temperature: 116 DEG F
Percent Porosity: 24
Samples: none
Gas Recovery:
Comments:
Recovery
2550 of Total Fluid
2550 of Fluid in Drill Pipe
120 of Muddy water 25% mud 75% water
2430 of Salt water
126000 of Salinity (PPM)
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 4 Data Source: TRILOBITE
Interval: 4672 to 4699
Formation tested: Lans.
Date, Time: 20-SEP-99; 10:24:38
Initial Hydro Pressure: 2234 PSI
First Initial Flow Pressure: 22 PSI
First Final Flow Pressure: 35 PSI
Initial Shut-in Pressure: 1292 PSI
Second Initial Flow Pressure: 36 PSI
Second Final Flow Pressure: 49 PSI
Final Shut-in Pressure: 1251 PSI
Final Hydro Pressure: 2177 PSI
Tool Data
Hole Size: 7.875 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: ft.
Drill Pipe Length: 4661 ft.
Initial Flow: Weak blow 1"" slowly increasing to 3"" Initial Shut-in: No blow.
Final Flow: Weak blow slow increase to 1/2""
Final Shut-in: No blow
Bottom Hole Temperature: 111 DEG F
Percent Porosity: 10
Samples: none
Gas Recovery:
Comments:
Recovery
75 of Total Fluid
75 of Fluid in Drill Pipe
75 of Muddy water 20% mud 80% water
67000 of Salinity (PPM)
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 5 Data Source: TRILOBITE
Interval: 4768 to 4930
Formation tested: Lans/Marmaton
Date, Time: 22-SEP-99; 01:26:53
Initial Hydro Pressure: 2322 PSI
First Initial Flow Pressure: 28 PSI
First Final Flow Pressure: 30 PSI
Initial Shut-in Pressure: 296 PSI
Second Initial Flow Pressure: 31 PSI
Second Final Flow Pressure: 35 PSI
Final Shut-in Pressure: 424 PSI
Final Hydro Pressure: 2184 PSI
Tool Data
Hole Size: 7.875 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: ft.
Drill Pipe Length: 4756 ft.
Initial Flow: Fair to strong blow bottom of bucket in 20 mins. Initial Shut-in: Weak blow. 1/2""
Final Flow: Fair to strong blow bottom of bucket in 9 mins.
Final Shut-in: Weak blow 1/2""
Bottom Hole Temperature: 111 DEG F
Percent Porosity: 10
Samples: none
Gas Recovery:
Comments:
Recovery
35 of Total Fluid
35 of Fluid in Drill Pipe
250 of Gas in pipe.
35 of Drilling mud
8000 of Salinity (PPM)
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 6 Data Source: TRILOBITE
Interval: 4987 to 5051
Formation tested: Miss.
Date, Time: 23-SEP-99; 06:02:20
Initial Hydro Pressure: 2420 PSI
First Initial Flow Pressure: 29 PSI
First Final Flow Pressure: 34 PSI
Initial Shut-in Pressure: 173 PSI
Second Initial Flow Pressure: 31 PSI
Second Final Flow Pressure: 39 PSI
Final Shut-in Pressure: 176 PSI
Final Hydro Pressure: 2367 PSI
Tool Data
Hole Size: 7.875 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: ft.
Drill Pipe Length: 4975 ft.
Initaial Flow: Strong blow bottom of bucket in 10 mins. Initial Shut-in: Weak blow. 1 - 2 1/2""
Final Flow: Strong blow bottom of bucket in 5-10 secs.
Final Shut-in: No blow back
Bottom Hole Temperature: 115 DEG F
Percent Porosity: 12
Samples: none
Gas Recovery:
Comments:
Recovery
60 of Total Fluid
60 of Fluid in Drill Pipe
1800 of Gas in pipe.
60 of Gassy mud 10% gas 90% mud
8000 of Salinity (PPM)
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 7 Data Source: TRILOBITE
Interval: 3465 to 3582
Formation tested: Stalnecker
Date, Time: 24-SEP-99; 03:38:20
Initial Hydro Pressure: PSI
First Initial Flow Pressure: PSI
First Final Flow Pressure: PSI
Initial Shut-in Pressure: PSI
Second Initial Flow Pressure: PSI
Second Final Flow Pressure: PSI
Final Shut-in Pressure: PSI
Final Hydro Pressure: PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: ft.
Drill Pipe Length: ft.
Initial Flow: Mis run top packer didn't hold
Bottom Hole Temperature: 98 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
2150 of Total Fluid
2150 of Fluid in Drill Pipe
2150 of Drilling mud
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 8 Data Source: TRILOBITE
Interval: 3360 to 3579
Formation tested: Stalnecker
Date, Time: 24-SEP-99; 10:03:40
Initial Hydro Pressure: PSI
First Initial Flow Pressure: PSI
First Final Flow Pressure: PSI
Initial Shut-in Pressure: PSI
Second Initial Flow Pressure: PSI
Second Final Flow Pressure: PSI
Final Shut-in Pressure: PSI
Final Hydro Pressure: PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: ft.
Drill Pipe Length: ft.
Initial Flow: Packer failure
Bottom Hole Temperature: 98 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
2150 of Total Fluid
2150 of Fluid in Drill Pipe
2150 of Drilling mud
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.