|
API: 15-195-22201
Operator: Denis F. Roberts Field: Wildcat Lease: Bodine Well 1 |
Location: T11S R21W, Sec. 35, W2 NW NW
4515 North, 4840 West, from SE corner Longitude: -99.6284488 Latitude: 39.0570339 County: Trego Status: D&A |
Spud Date: 23-MAY-00
Completion Date: 30-MAY-00 Plugging Date: 30-MAY-00 Total Depth: 4003 Form. at depth: ARBUCKLE Elevation: 2301 KB |
| Test Number: 1 | Data Source: TRILOBITE |
|
Interval: 3614 to 3687
Formation tested: C-D-E-F LKC | Date, Time: 28-MAY-00; 02:31:49 |
|
Initial Hydro Pressure: 1774 PSI
First Initial Flow Pressure: 17 PSI First Final Flow Pressure: 42 PSI Initial Shut-in Pressure: 561 PSI Second Initial Flow Pressure: 43 PSI Second Final Flow Pressure: 59 PSI Final Shut-in Pressure: 523 PSI Final Hydro Pressure: 1740 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 30 ft. Drill Pipe Length: 3570 ft. |
|
Initial Flow: Weak-building to 3"" fair blow. Final Flow: Weak-building to 1/4"". |
|
|
Bottom Hole Temperature: 113 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
|
Recovery 90 of Total Fluid 30 of Fluid in Drill Collars 60 of Fluid in Drill Pipe 90 of Drilling mud with show of free oil on top. | |
| View Pressures | No Recovery Gas data. |
| Test Number: 2 | Data Source: TRILOBITE |
|
Interval: 3452 to 3545
Formation tested: Topeka | Date, Time: 29-MAY-00; 17:30:40 |
|
Initial Hydro Pressure: PSI
First Initial Flow Pressure: PSI First Final Flow Pressure: PSI Initial Shut-in Pressure: PSI Second Initial Flow Pressure: PSI Second Final Flow Pressure: PSI Final Shut-in Pressure: PSI Final Hydro Pressure: PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 30 ft. Drill Pipe Length: 3440 ft. |
| Set packers-Packer failure Reset packers-Packer failure | |
|
Bottom Hole Temperature: 110 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
|
Recovery 90 of Total Fluid 30 of Fluid in Drill Collars 60 of Fluid in Drill Pipe 90 of Drilling Mud | |
| View Pressures | No Recovery Gas data. |
| Test Number: 3 | Data Source: TRILOBITE |
|
Interval: 3456 to 3545
Formation tested: Topeka | Date, Time: 29-MAY-00; 21:20:50 |
|
Initial Hydro Pressure: PSI
First Initial Flow Pressure: PSI First Final Flow Pressure: PSI Initial Shut-in Pressure: PSI Second Initial Flow Pressure: PSI Second Final Flow Pressure: PSI Final Shut-in Pressure: PSI Final Hydro Pressure: PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 30 ft. Drill Pipe Length: 3444 ft. |
| Set Packers- Packer failure Reset packers- Packer Failure | |
|
Bottom Hole Temperature: 110 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
|
Recovery 180 of Total Fluid 30 of Fluid in Drill Collars 150 of Fluid in Drill Pipe 180 of Drilling mud | |
| View Pressures | No Recovery Gas data. |
| Test Number: 4 | Data Source: TRILOBITE |
|
Interval: 3509 to 3545
Formation tested: Topeka | Date, Time: 30-MAY-00; 01:33:21 |
|
Initial Hydro Pressure: 1793 PSI
First Initial Flow Pressure: 39 PSI First Final Flow Pressure: 72 PSI Initial Shut-in Pressure: 1150 PSI Second Initial Flow Pressure: 76 PSI Second Final Flow Pressure: 121 PSI Final Shut-in Pressure: 1118 PSI Final Hydro Pressure: 1722 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 30 ft. Drill Pipe Length: ft. |
|
Initial Flow: Weak-building to 10"" fair blow. Final Flow: Weak- building to 1"". |
|
|
Bottom Hole Temperature: 113 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
|
Recovery 240 of Total Fluid 30 of Fluid in Drill Collars 210 of Fluid in Drill Pipe 240 of Muddy water 48000 of Salinity (PPM) | |
| View Pressures | No Recovery Gas data. |