API: 15-081-21301-0001
Operator: JOHN O. FARMER, INC. Field: Radio Tower Lease: Cooper Trust Well 1-34 |
Location: T30S R31W, Sec. 34, NW SE
1990 North, 1963 West, from SE corner Longitude: -100.6953343 Latitude: 37.3930671 County: Haskell Status: O&G-P&A |
Spud Date: 12-AUG-01
Completion Date: 16-AUG-00 Plugging Date: 26-OCT-18 Total Depth: 5605 Form. at depth: Elevation: 2840 KB |
Test Number: 1 | Data Source: TRILOBITE |
Interval: 5285 to 5384
Formation tested: Morrow | Date, Time: 31-MAY-00; 02:41:06 |
Initial Hydro Pressure: 2542 PSI
First Initial Flow Pressure: 93 PSI First Final Flow Pressure: 157 PSI Initial Shut-in Pressure: 1554 PSI Second Initial Flow Pressure: 178 PSI Second Final Flow Pressure: 250 PSI Final Shut-in Pressure: 1667 PSI Final Hydro Pressure: 2464 PSI |
Tool Data Hole Size: 7.78 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 275 ft. Drill Pipe Length: 5003 ft. |
Initial Flow: Weak 2"" built to strong bottom of bucket in 4 minutes. Initial Shut-In: No blow back. Final Flow: Strong bottom of bucket immediately. Gas to surface in 11 minutes. Gauged 21,900 CFPD. Decreased to 14,100 CFPD in 90 minutes. Final Shut-In: Strong bottom of bucket blow back. Remarks: Est. 8 Ft. of Pay. Gas burned. |
|
Bottom Hole Temperature: 126 DEG F
Percent Porosity: 25 Samples: One Gas Recovery: Comments: | |
Recovery 720 of Total Fluid 275 of Fluid in Drill Collars 445 of Fluid in Drill Pipe 4558 of Gas in pipe. 230 of Clean gassy oil 370 of Mud cut gassy oil 120 of Gassy mud cut oil 28 of Gravity (API) | |
View Pressures | View Recovery Gas |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |
Test Number: 4 | Data Source: TRILOBITE |
Interval: 5376 to 5441
Formation tested: Morrow | Date, Time: 01-JUN-00; 14:30:06 |
Initial Hydro Pressure: 2693 PSI
First Initial Flow Pressure: 101 PSI First Final Flow Pressure: 58 PSI Initial Shut-in Pressure: 229 PSI Second Initial Flow Pressure: 41 PSI Second Final Flow Pressure: 51 PSI Final Shut-in Pressure: 595 PSI Final Hydro Pressure: 2506 PSI |
Tool Data Hole Size: 7.78 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 275 ft. Drill Pipe Length: 5097 ft. |
Initial Flow: Weak 1/2"" built to 2 1/2"" in 5 minutes. Initial Shut-In: No blow back. Final Flow: Fair 6"" built to strong bottom of bucket in 20 minutes. Final Shut-In: No blow back. Remarks: Est. 13 Ft. of pay. Had plugging on I.F.P. |
|
Bottom Hole Temperature: 128 DEG F
Percent Porosity: 15 Samples: None Gas Recovery: Comments: | |
Recovery 70 of Total Fluid 70 of Fluid in Drill Collars 110 of Gas in pipe. 70 of Slightly gas cut mud | |
View Pressures | No Recovery Gas data. |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |