Drill Stem Tests Database
Specific Well--15-033-20978
API: 15-033-20978
Operator: AMERICAN WARRIOR INC.
Field: Bird
Lease: Bird
Well 1-29
Location: T32S R19W, Sec. 29, SE SW NE
2220 South, 1600 West, from NE corner
Longitude: -99.4056609
Latitude: 37.2302228
County: Comanche
Status: D&A
Spud Date: 10-NOV-98
Completion Date: 20-NOV-98
Plugging Date: 21-NOV-98
Total Depth: 5350
Form. at depth: ARBUCKLE
Elevation: 1940 KB
Test Number: 1 Data Source: TRILOBITE
Interval: 4990 to 5063
Formation tested: Ft.Scott,Cherokee,Pw
Date, Time: 18-NOV-98; 11:57:50
Initial Hydro Pressure: 2435 PSI
First Initial Flow Pressure: 23 PSI
First Final Flow Pressure: 41 PSI
Initial Shut-in Pressure: 1542 PSI
Second Initial Flow Pressure: 52 PSI
Second Final Flow Pressure: 81 PSI
Final Shut-in Pressure: 1572 PSI
Final Hydro Pressure: 2327 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 294 ft.
Drill Pipe Length: 4735 ft.
Initial Flow: Weak surface blow built to 6"" in water bucket Initial Shutin: Bled down for 5 minutes no blow back
Final Flow: Weak blow built to 6"" in water
Final Flow: Bled down for 10 minutes no blow back
Bottom Hole Temperature: 117 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
150 of Total Fluid
150 of Fluid in Drill Collars
270 of Gas in pipe
80 of Very slight gas cut mud 2%gas 98%mud
70 of Slight mud cut water 85%water 15%mud
110000 of Salinity (PPM)
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 2 Data Source: TRILOBITE
Interval: 5129 to 5178
Formation tested: Miss.
Date, Time: 19-NOV-98; 21:44:04
Initial Hydro Pressure: 2497 PSI
First Initial Flow Pressure: 21 PSI
First Final Flow Pressure: 21 PSI
Initial Shut-in Pressure: 72 PSI
Second Initial Flow Pressure: 19 PSI
Second Final Flow Pressure: 19 PSI
Final Shut-in Pressure: 64 PSI
Final Hydro Pressure: 2451 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 294 ft.
Drill Pipe Length: 4861 ft.
Initial Flow: Weak blow built to 3 1/2"" died back to weak surface blow Initial Shutin: No blow back
Final Flow: Weak blow built to 1"" died in 14 minutes
Final Shutin: No blow back
Bottom Hole Temperature: 115 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
20 of Total Fluid
20 of Fluid in Drill Collars
160 of Gas in drill collar
20 of Very slight gas cut mud 1% gas 99% mud
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.