|
API: 15-187-20926
Operator: McCoy Petroleum Corp. Field: Wildcat Lease: Johns 'A' Well 1-36 |
Location: T30S R41W, Sec. 36, NW NW NW
4621 North, 5074 West, from SE corner Longitude: -101.7611379 Latitude: 37.4014456 County: Stanton Status: O&G-P&A |
Spud Date: 03/10/2000
Completion Date: 04/21/2000 Plugging Date: 11/16/2005 Total Depth: 5544 Form. at depth: MISSISSIPPIAN Elevation: 3387 KB |
| Test Number: 1 | Data Source: TRILOBITE |
|
Interval: 5433 to 5449
Formation tested: Keyes Sand | Date, Time: 03/19/2000; 09:36:05 |
|
Initial Hydro Pressure: 2599 PSI
First Initial Flow Pressure: 18 PSI First Final Flow Pressure: 24 PSI Initial Shut-in Pressure: 1291 PSI Second Initial Flow Pressure: 45 PSI Second Final Flow Pressure: 61 PSI Final Shut-in Pressure: 1324 PSI Final Hydro Pressure: 2579 PSI |
Tool Data Hole Size: 7.78 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 647 ft. Drill Pipe Length: 4783 ft. |
|
Initial Flow: Surface blow, built to 2 3/4"" in bucket in 30 minutes. Initial Shut-In: No blow back. Final Flow: 1"" blow. Stable for 20 minutes. Built to strong. Bottom of bucket in 48 minutes. Final Shut-In: No blow back. |
|
|
Bottom Hole Temperature: 129 DEG F
Percent Porosity: 16 Samples: None Gas Recovery: Comments: | |
|
Recovery 105 of Total Fluid 105 of Fluid in Drill Collars 665 of Gas in pipe. 45 of Oil & Gas cut Mud 20 of Mud cut gassy oil 40 of Clean gassy oil 45 of Gravity (API) | |
| View Pressures | No Recovery Gas data. |
| Test Number: 2 | Data Source: TRILOBITE |
|
Interval: 5463 to 5480
Formation tested: Lower Keyes | Date, Time: 03/20/2000; 06:24:05 |
|
Initial Hydro Pressure: 2610 PSI
First Initial Flow Pressure: 372 PSI First Final Flow Pressure: 373 PSI Initial Shut-in Pressure: PSI Second Initial Flow Pressure: PSI Second Final Flow Pressure: PSI Final Shut-in Pressure: 1363 PSI Final Hydro Pressure: 2610 PSI |
Tool Data Hole Size: 7.78 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 647 ft. Drill Pipe Length: 4812 ft. |
|
Initial Flow: Weak 1/2"", built to 4 1/2"" in bucket in 30 minutes. Initial Shut-In: No blow back. Final Flow: Surface blow, built to 2 3/4"" in 25 minutes. Decreased to 1"" in 60 minutes. Final Shut-In: No blow back. |
|
|
Bottom Hole Temperature: 140 DEG F
Percent Porosity: 15 Samples: None Gas Recovery: Comments: | |
|
Recovery 715 of Total Fluid 647 of Fluid in Drill Collars 68 of Fluid in Drill Pipe 65 of Mud 170 of Slightly oil & gas cut mud 300 of Heavy gas & oil cut mud 180 of Heavy oil & gas cut mud 3250 of Salinity (PPM) | |
| View Pressures | No Recovery Gas data. |