Drill Stem Tests Database
Specific Well--15-187-20926
API: 15-187-20926
Operator: McCoy Petroleum Corp.
Field: Wildcat
Lease: Johns 'A'
Well 1-36
Location: T30S R41W, Sec. 36, NW NW NW
4621 North, 5074 West, from SE corner
Longitude: -101.7611379
Latitude: 37.4014456
County: Stanton
Status: O&G-P&A
Spud Date: 03/10/2000
Completion Date: 04/21/2000
Plugging Date: 11/16/2005
Total Depth: 5544
Form. at depth: MISSISSIPPIAN
Elevation: 3387 KB

Download DST Test Data

Test Number: 1 Data Source: TRILOBITE
Interval: 5433 to 5449
Formation tested: Keyes Sand
Date, Time: 03/19/2000; 09:36:05
Initial Hydro Pressure: 2599 PSI
First Initial Flow Pressure: 18 PSI
First Final Flow Pressure: 24 PSI
Initial Shut-in Pressure: 1291 PSI
Second Initial Flow Pressure: 45 PSI
Second Final Flow Pressure: 61 PSI
Final Shut-in Pressure: 1324 PSI
Final Hydro Pressure: 2579 PSI
Tool Data
Hole Size: 7.78 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 647 ft.
Drill Pipe Length: 4783 ft.
Initial Flow: Surface blow, built to 2 3/4"" in bucket in 30 minutes. Initial Shut-In: No blow back.
Final Flow: 1"" blow. Stable for 20 minutes. Built to strong. Bottom of bucket in 48 minutes.
Final Shut-In: No blow back.
Bottom Hole Temperature: 129 DEG F
Percent Porosity: 16
Samples: None
Gas Recovery:
Comments:
Recovery
105 of Total Fluid
105 of Fluid in Drill Collars
665 of Gas in pipe.
45 of Oil & Gas cut Mud
20 of Mud cut gassy oil
40 of Clean gassy oil
45 of Gravity (API)
View Pressures No Recovery Gas data.
 
Test Number: 2 Data Source: TRILOBITE
Interval: 5463 to 5480
Formation tested: Lower Keyes
Date, Time: 03/20/2000; 06:24:05
Initial Hydro Pressure: 2610 PSI
First Initial Flow Pressure: 372 PSI
First Final Flow Pressure: 373 PSI
Initial Shut-in Pressure: PSI
Second Initial Flow Pressure: PSI
Second Final Flow Pressure: PSI
Final Shut-in Pressure: 1363 PSI
Final Hydro Pressure: 2610 PSI
Tool Data
Hole Size: 7.78 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 647 ft.
Drill Pipe Length: 4812 ft.
Initial Flow: Weak 1/2"", built to 4 1/2"" in bucket in 30 minutes. Initial Shut-In: No blow back.
Final Flow: Surface blow, built to 2 3/4"" in 25 minutes. Decreased to 1"" in 60 minutes.
Final Shut-In: No blow back.
Bottom Hole Temperature: 140 DEG F
Percent Porosity: 15
Samples: None
Gas Recovery:
Comments:
Recovery
715 of Total Fluid
647 of Fluid in Drill Collars
68 of Fluid in Drill Pipe
65 of Mud
170 of Slightly oil & gas cut mud
300 of Heavy gas & oil cut mud
180 of Heavy oil & gas cut mud
3250 of Salinity (PPM)
View Pressures No Recovery Gas data.