|
API:
Operator: Gallagher Drilling Field: Unknown Lease: City of Grayville Well 6 |
Location: T3S R14W, Sec. 21,
Longitude: Latitude: County: Unknown Status: OTHER |
Spud Date:
Completion Date: 10-JUL-00 Plugging Date: Total Depth: 3890 Form. at depth: Warsaw Elevation: 409 KB |
| Test Number: 1 | Data Source: TRILOBITE |
|
Interval: 3810 to 3890
Formation tested: Warsaw | Date, Time: 10-JUL-00; 05:31:07 |
|
Initial Hydro Pressure: 1957 PSI
First Initial Flow Pressure: 31 PSI First Final Flow Pressure: 86 PSI Initial Shut-in Pressure: 1630 PSI Second Initial Flow Pressure: 91 PSI Second Final Flow Pressure: 155 PSI Final Shut-in Pressure: 1633 PSI Final Hydro Pressure: 1909 PSI |
Tool Data Hole Size: 7.875 in. Drill Collar ID: in. Drill Pipe ID: 3.8 in. Drill Collar Length: ft. Drill Pipe Length: 3866 ft. |
|
Initial Flow: 2"" @ open (surging blow) built to bottom of bucket in 11 minutes. Initial Shut-In: Bled off for 2 minutes. Return in 1 minute. Built to 2"". Final Flow: Bottom of bucket in 1 minute. Final Shut-In: Bled off for 4 minutes. Return in 1/2 minute. Built to bottom of bucket in 4 minutes. |
|
|
Bottom Hole Temperature: 102 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
|
Recovery 340 of Total Fluid 340 of Fluid in Drill Pipe 3200 of Gas in pipe. 40 of Slightly gassy mud 60 of Very slightly oil & gas cut mud 120 of Slightly oil cut gassy mud 120 of Slightly oil & mud cut gassy water | |
| View Pressures | No Recovery Gas data. |