API: 15-067-21449
Operator: Harris Oil and Gas Co. Field: Ryus North Lease: Merritt MLP Well 1-35 |
Location: T29S R35W, Sec. 35, S2 NW SE
1739 North, 1949 West, from SE corner Longitude: -101.11389 Latitude: 37.4796 County: Grant Status: O&G-P&A |
Spud Date: 10-APR-99
Completion Date: 28-MAY-99 Plugging Date: 20-JAN-09 Total Depth: 5700 Form. at depth: CHESTER Elevation: 3031 KB |
Test Number: 1 | Data Source: TRILOBITE |
Interval: 4530 to 4570
Formation tested: Kansas City ""A"" | Date, Time: 16-APR-98; 05:56:43 |
Initial Hydro Pressure: 2221 PSI
First Initial Flow Pressure: 35 PSI First Final Flow Pressure: 81 PSI Initial Shut-in Pressure: 1065 PSI Second Initial Flow Pressure: 90 PSI Second Final Flow Pressure: 125 PSI Final Shut-in Pressure: 1063 PSI Final Hydro Pressure: 2152 PSI |
Tool Data Hole Size: 7.78 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 545 ft. Drill Pipe Length: 3963 ft. |
Initial Flwo: Weak blow died in 8 mins. Final Flow: Bubblen then no blow NOTE: after test found 2"" valve on floor manifold was leaking. this is why there is more recovery then the blow indicates. |
|
Bottom Hole Temperature: 115 DEG F
Percent Porosity: Samples: NO Gas Recovery: Comments: | |
Recovery 200 of Total Fluid 200 of Fluid in Drill Collars 80 of Drilling Mud Film Oil 100% Mud 120 of Drilling Mud Sightly water Cut | |
View Pressures | No Recovery Gas data. |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |
Test Number: 2 | Data Source: TRILOBITE |
Interval: 4523 to 4582
Formation tested: Kansas City ""A"" | Date, Time: 16-APR-99; 19:30:33 |
Initial Hydro Pressure: 2060 PSI
First Initial Flow Pressure: 33 PSI First Final Flow Pressure: 128 PSI Initial Shut-in Pressure: 1088 PSI Second Initial Flow Pressure: 137 PSI Second Final Flow Pressure: 209 PSI Final Shut-in Pressure: 1080 PSI Final Hydro Pressure: 1999 PSI |
Tool Data Hole Size: 7.78 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 545 ft. Drill Pipe Length: 3995 ft. |
Initial Flow: Blow blow built to 4"" Final Flow: Weak blow built o .25"" in 10 mins. then stayed |
|
Bottom Hole Temperature: 115 DEG F
Percent Porosity: 15 Samples: NO Gas Recovery: Comments: | |
Recovery 375 of Total Fluid 375 of Fluid in Drill Collars 75 of Drilling mud 120 of Muddy water 50% Mud 50% Water 180 of Muddy Water 25% Mud 75% Water 15000 of Salinity (PPM) | |
View Pressures | No Recovery Gas data. |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |
Test Number: 3 | Data Source: TRILOBITE |
Interval: 5259 to 5342
Formation tested: Upper Morrow | Date, Time: 20-APR-99; 18:48:01 |
Initial Hydro Pressure: PSI
First Initial Flow Pressure: PSI First Final Flow Pressure: PSI Initial Shut-in Pressure: PSI Second Initial Flow Pressure: PSI Second Final Flow Pressure: PSI Final Shut-in Pressure: PSI Final Hydro Pressure: PSI |
Tool Data Hole Size: 7.78 in. Drill Collar ID: 3.8 in. Drill Pipe ID: 2.5 in. Drill Collar Length: 545 ft. Drill Pipe Length: 4778 ft. |
Initial Flow: Strong blow bottom of bucket in 1 min Initial Shut-in: Bled off blow had surface blow back built to .25"" Final Flow: Fair blow built to bottom of bucket in 6 mins. Final Shut-in: Bled off 2"" gas to surface 10 mins. into shut-in |
|
Bottom Hole Temperature: 123 DEG F
Percent Porosity: 1515 Samples: NO Gas Recovery: Comments: | |
Recovery 3560 of Total Fluid 545 of Fluid in Drill Collars 3015 of Fluid in Drill Pipe 120 of Gassy oily water cut mud 915 of Gassy heavy oil cut water 366 of Gassy oil and water cut mud 610 of Gassy oil cut water 30% gas 5% oil 65% water 1549 of Salt water 82000 of Salinity (PPM) | |
View Pressures | No Recovery Gas data. |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |