Select location of well to view details.Click on column heading to sort. | |||
T-R-S |
Original
operator |
Well | API | Spud, Plug Dates |
Logger, Tool | Scan | Top, Bottom |
Log Date |
---|---|---|---|---|---|---|---|---|
T22S R7W, Sec. 25 SE | Oneok | Oneok - Yaggy 2 | Reno |
Unknown
Unknown |
Eli Wireline Services Temperature Log Run #2 |
3679; 4099 | 25-APR-95 | |
Electra Log Inc. Radiation Accurlog |
1000; 4080 | 23-FEB-78 | ||||||
Eli Wireline Services Composite Temperature Log |
Y | 3700; 4240 | 06-MAY-00 | |||||
Eli Wireline Services Temperature Log Base Log |
Y | 0; 4240 | 05-MAY-00 | |||||
Eli Wireline Services Temperature Log Final Run |
Y | 0; 4240 | 06-MAY-00 | |||||
Eli Wireline Services Temperature Log 2 Hour Run |
Y | 3700; 4240 | 06-MAY-00 | |||||
Eli Wireline Services Temperature Log 4 Hour Run |
Y | 3700; 4240 | 06-MAY-00 | |||||
Chet Brown Co. Dual Temperature Survey |
10; 4082 | 09-APR-85 | ||||||
Phoenix Wireline, Inc. Fluid Level Log |
Y | 400; 600 | 10-MAR-92 | |||||
Great Guns Temperature Correlation Log |
Y | 0; 4116 | 04-DEC-90 | |||||
Eli Wireline Services Temperature Log 1 Hour Run |
Y | 3700; 4240 | 06-MAY-00 | |||||
Eli Wireline Services Temperature Log Run #1 |
Y | 0; 4099 | 25-APR-95 | |||||
Electra Log Inc. Radiation Log |
Y | 0; 1032 | 08-MAR-78 | |||||
Electra Log Inc. Radiation Log |
0; 1032 | 08-MAR-75 | ||||||
Eli Wireline Services Composite Temperature Log |
0; 4129 | 15-APR-04 | ||||||
Electra Log Inc. Radiation Accurlog |
Y | 1000; 4080 | 23-FEB-78 | |||||
Electra Log Inc. Radiation Log |
Y | 0; 1032 | 08-MAR-78 | |||||
Electra Log Inc. Radiation Accurlog |
Y | 1000; 4080 | 23-FEB-78 | |||||
Eli Wireline Services Fluid Level |
Y | 1; 664 | 28-MAY-98 | |||||
Eli Wireline Services Temperature Fluid Level Log |
Y | 1; 606 | 18-JUN-97 | |||||
Eli Wireline Services Fluid Level |
Y | 369; 900 | 08-OCT-96 | |||||
Eli Wireline Services Composite Temperature Log |
Y | 1; 4099 | 25-APR-95 | |||||
Electra Log Inc. Radiation Log |
0; 1032 | 08-MAR-78 | ||||||
Eli Wireline Services Composite Temperature Log |
Y | 0; 4129 | 15-APR-04 | |||||
Eli Wireline Services Temperature Log Run #5 |
Y | 1; 4099 | 25-APR-95 | |||||
Eli Wireline Services Temperature Log Run #4 |
Y | 3690; 4099 | 25-APR-95 | |||||
Electra Log Inc. Radiation Accurlog |
1000; 4080 | 23-FEB-78 | ||||||
Chet Brown Co. Temperature Survey |
10; 4082 | 09-APR-85 | ||||||
Great Guns Temperature Correlation Log |
0; 4116 | 04-DEC-90 | ||||||
Electra Log Inc. Radiation Log |
0; 1032 | 08-MAR-78 | ||||||
Phoenix Wireline, Inc. Fluid Level Log |
Y | 400; 600 | 10-MAR-92 | |||||
Eli Wireline Services Gamma Ray Temperature Log |
Y | 0; 700 | 11-MAR-02 | |||||
Eli Wireline Services Fluid Level Log |
639; 900 | 08-OCT-96 | ||||||
Eli Wireline Services Temperature Fluid Level Log |
1; 606 | 18-JUN-97 | ||||||
Eli Wireline Services Fluid Level Log |
1; 664 | 28-MAY-98 | ||||||
Eli Wireline Services Composite Temperature Log |
3700; 4240 | 06-MAY-00 | ||||||
Eli Wireline Services Temperature Log Base Log |
0; 4240 | 05-MAY-00 | ||||||
Eli Wireline Services Temperature Log Final Run |
0; 4240 | 06-MAY-00 | ||||||
Eli Wireline Services Temperature Log 2 Hour Run |
3700; 4240 | 06-MAY-00 | ||||||
Eli Wireline Services Temperature Log 4 Hour Run |
3700; 4240 | 06-MAY-00 | ||||||
Eli Wireline Services Temperature Log 1 Hour Run |
3700; 4240 | 06-MAY-00 | ||||||
T32S R33W, Sec. 1 SW NW | NORTHERN NATURAL GAS PRODUCTION | SUBLETTE DISPOSAL 1-W | 15-175-60002-0001 |
Unknown
Unknown |
Schlumberger Logarithmic Overlay |
Y | 2600; 4300 | 09-MAR-68 |
Schlumberger Perforating Depth Control |
Y | 2500; 4246 | 14-MAR-68 | |||||
Schlumberger Dual Induction Laterolog |
Y | 603; 4288 | 09-MAR-68 | |||||
Schlumberger Cement Bond |
Y | 1500; 4251 | 14-MAR-68 | |||||
Halliburton Hydrostatic Test Report |
Y | 4125; 4291 | 09-MAR-68 | |||||
Eli Wireline Services Gamma Ray CCL Temperature Log |
Y | 0; 4044 | 18-SEP-89 | |||||
Eli Wireline Services Temperature Log Base Log |
Y | 2; 4029 | 02-NOV-99 | |||||
Eli Wireline Services Temperature Log Run #3 |
Y | 3500; 4032 | 03-NOV-99 | |||||
Eli Wireline Services Temperature Log |
Y | 0; 4033 | 19-NOV-84 | |||||
Eli Wireline Services Gamma Ray Temperature Log |
Y | 3496; 4032 | 24-JUN-94 | |||||
Eli Wireline Services Temperature Log Run #4 |
Y | 3500; 4031 | 03-NOV-84 | |||||
Eli Wireline Services Gamma Ray Temperature Log |
Y | 1; 4033 | 24-JUN-94 | |||||
Eli Wireline Services Initial Base Log Gamma Ray Temp CCL Log |
Y | 0; 4066 | 18-SEP-89 | |||||
Eli Wireline Services Gamma Ray CCL Temperature Log |
Y | 3500; 4044 | 18-SEP-89 | |||||
Eli Wireline Services Gamma Ray CCL Temperature Log |
Y | 3500; 4044 | 18-SEP-89 | |||||
Eli Wireline Services Composite Temperature Log |
Y | 3500; 4029 | 02-NOV-99 | |||||
Eli Wireline Services Gamma Ray Temperature Log |
Y | 3; 4032 | 23-JUN-94 | |||||
Eli Wireline Services Gamma Ray Temperature Log |
Y | 3499; 4032 | 24-JUN-94 | |||||
Eli Wireline Services Composite Temperature Log |
Y | 0; 4032 | 23-JUN-94 | |||||
Eli Wireline Services Temperature Log 2 Hour Run |
Y | 3500; 4033 | 03-NOV-84 | |||||
Eli Wireline Services Gamma Ray CCL Temperature Log |
Y | 3500; 4044 | 18-SEP-89 | |||||
Eli Wireline Services Gamma Ray CCL Temperature Log |
Y | 3500; 4044 | 18-SEP-89 | |||||
Eli Wireline Services Gamma Ray CCL Temperature Log |
Y | 3500; 4044 | 18-SEP-89 | |||||
Schlumberger Compensated Formation Density Log |
Y | 2700; 4292 | 09-MAR-68 | |||||
Eli Wireline Services Gamma Ray Temperature Log |
Y | 3500; 4033 | 24-JUN-94 |