|
|
|
Specific Well--15-093-00728Yearly Pressure Data |
|
API: 15-093-00728
Operator: Champlin Refining Co. Field: Hugoton Gas Area Lease: Heintz Well 1 |
Location: T25S R37W, Sec. 6, SE NW SE
1650 North, 1650 West, from SE corner Longitude: -101.4189908 Latitude: 37.9050947 County: Kearny Status: GAS |
Spud Date: 02/05/1951
Completion Date: 04/24/1951 Plugging Date: Total Depth: 2625 Form. at depth: FORT RILEY LIMESTONE Elevation: 3150 DF |
| Year | Acreage | Shut-In Pressure |
Working Pressure |
Daily Rate | Open Flow | Adj. Deliverability |
Water Production |
Meter Pressure |
Differential | Coefficient | Dry Gas Gravity |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1996 | 634 | 79.8 | 68 | 118.05 | 396 | 340 | 6 | 67.5 | 15.7 | 3292.1 | |
| 1997 | 634 | 0 | 0 | 0 | 0 | 340 | 0 | 0 | 0 | 0 | |
| 1998 | 634 | 72.4 | 61 | 108.49 | 350 | 336 | 10 | 60.5 | 14.5 | 3292.1 | |
| 1999 | 634 | 0 | 0 | 0 | 0 | 336 | 0 | 0 | 0 | 0 | |
| 2000 | 634 | 43.8 | 34.7 | 91.95 | 251 | 249 | 12 | 34 | 5.1 | 5852.6 | |
| 2002 | 634 | 0 | 0 | 0 | 0 | 0 | 0 | ||||
| 2003 | 634 | 0 | 0 | 0 | 0 | 0 | 0 | ||||
| 2004 | 634 | 0 | 0 | 0 | 0 | 0 | 0 |