Specific Well--15-093-00590Yearly Pressure Data |
|
API: 15-093-00590
Operator: Stanolind Oil & Gas Co. Field: Hugoton Gas Area Lease: H. E. Johnston Well 1 |
Location: T26S R38W, Sec. 17, SW SW NE
2707 North, 2470 West, from SE corner Longitude: -101.4994811 Latitude: 37.7873732 County: Kearny Status: GAS-P&A |
Spud Date: 04/09/1948
Completion Date: 04/09/1948 Plugging Date: 10/10/2002 Total Depth: 2676 Form. at depth: FORT RILEY LIMESTONE Elevation: 3275 DF |
| Year | Acreage | Shut-In Pressure |
Working Pressure |
Daily Rate | Open Flow | Adj. Deliverability |
Water Production |
Meter Pressure |
Differential | Coefficient | Dry Gas Gravity |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1996 | 640 | 0 | 0 | 0 | 0 | 572 | 0 | 0 | 0 | 0 | |
| 1997 | 640 | 46.5 | 38.6 | 125.67 | 399 | 324 | 2.5 | 38.5 | 5.44 | 7407.9 | |
| 1998 | 640 | 0 | 0 | 0 | 0 | 324 | 0 | 0 | 0 | 0 | |
| 1999 | 640 | 39.5 | 33.5 | 106.08 | 375 | 375 | .5 | 33.4 | 4.29 | 7407.9 | |
| 2000 | 640 | 0 | 0 | 0 | 0 | 375 | 0 | 0 | 0 | 0 | |
| 2002 | 640 | 0 | 0 | 0 | 236 | 0 | 0 |