|
Specific Well--15-093-00333Yearly Pressure Data |
API: 15-093-00333
Operator: Stanolind Oil and Gas Co. Field: Hugoton Gas Area Lease: Strop Gas Unit 'A' Well 1 |
Location: T25S R38W, Sec. 23, SW NE SW
1640 North, 1640 East, from SW corner Longitude: -101.4625374 Latitude: 37.8613022 County: Kearny Status: GAS |
Spud Date: 24-MAY-52
Completion Date: 10-JUN-52 Plugging Date: Total Depth: 2573 Form. at depth: FORT RILEY LIMESTONE Elevation: 3118 KB |
Year | Acreage | Shut-In Pressure |
Working Pressure |
Daily Rate | Open Flow | Adj. Deliverability |
Water Production |
Meter Pressure |
Differential | Coefficient | Dry Gas Gravity |
---|---|---|---|---|---|---|---|---|---|---|---|
1996 | 640 | 0 | 0 | 0 | 0 | 668 | 0 | 0 | 0 | 0 | |
1997 | 640 | 39.3 | 35.3 | 127.17 | 622 | 468 | 0 | 35 | 5.34 | 7829.6 | |
1998 | 640 | 0 | 0 | 0 | 0 | 468 | 0 | 0 | 0 | 0 | |
1999 | 640 | 34.6 | 29.6 | 187.04 | 699 | 699 | 0 | 29.3 | 70.01 | 3381.5 | |
2000 | 640 | 0 | 0 | 0 | 0 | 699 | 0 | 0 | 0 | 0 | |
2002 | 640 | 0 | 0 | 0 | 145 | 0 | 0 | ||||
2003 | 640 | 16.4 | 12.1 | 92.48 | 236 | 291 | 11.9 | 28.44 | 3381.5 | ||
2004 | 640 | 0 | 0 | 0 | 291 | 0 | 0 |