![]() ![]() |
![]() |
Specific Well--15-067-21365Yearly Pressure Data |
API: 15-067-21365
Operator: Mobil Oil Corp. Field: Hugoton Gas Area Lease: J. P. Sullivan Unit Well 3 |
Location: T29S R36W, Sec. 27, SW NE NE
1250 South, 1250 West, from NE corner Longitude: -101.2384638 Latitude: 37.5001345 County: Grant Status: GAS |
Spud Date: 26-DEC-95
Completion Date: 22-JAN-96 Plugging Date: Total Depth: 2832 Form. at depth: CHASE GROUP Elevation: 2942 KB |
Year | Acreage | Shut-In Pressure |
Working Pressure |
Daily Rate | Open Flow | Adj. Deliverability |
Water Production |
Meter Pressure |
Differential | Coefficient | Dry Gas Gravity |
---|---|---|---|---|---|---|---|---|---|---|---|
1996 | 560 | 95.4 | 85 | 115.71 | 489 | 386 | 0 | 85.6 | 1.6 | 9147.5 | |
1997 | 560 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
1998 | 560 | 0 | 0 | 0 | 0 | 594 | 0 | 0 | 0 | 0 | |
1999 | 560 | 55.2 | 44.1 | 106.02 | 290 | 254 | 0 | 44 | 2.3 | 9147.5 | |
2000 | 560 | 54.5 | 47.3 | 96.32 | 367 | 321 | 0 | 47.2 | 1.8 | 9147.5 | |
2002 | 560 | 0 | 0 | 0 | 311 | 0 | 0 | ||||
2003 | 560 | 0 | 0 | 0 | 0 | 0 | 0 | ||||
2004 | 560 | 0 | 0 | 0 | 0 | 0 | 0 |