Specific Well--15-175-21275Yearly Pressure Data |
API: 15-175-21275
Operator: Amoco Production Co. Field: Hugoton Gas Area Lease: Eubank Gas Unit Well 2HI |
Location: T31S R32W, Sec. 19, NE NE SW SW
1250 North, 4030 West, from SE corner Longitude: -100.8477134 Latitude: 37.3332013 County: Seward Status: GAS-P&A |
Spud Date: 12/08/1992
Completion Date: 04/02/1993 Plugging Date: 10/17/2001 Total Depth: 2965 Form. at depth: FORT RILEY LIMESTONE Elevation: 2877 KB |
Production on the lease #220796 through 12/31/2001 came from the Eubanks 2HI. Production on lease #220796 from 01/01/2002 should be attributed to the Eubanks 3HI. Essentially, the operator plugged the 2HI in October, 2000 and started producing small amounts from the 3HI, but full production didn't really begin until very late 2001. 04/15/08-KDOR. We have the cement tickets for the plug back done for the workover 15-175-21514-00-01 and the date is 10/08/2000 on both the Schlumberger tickets and BP's letter accompanying them. And although the ACO-1 has a spud date of 10/17/2000 and completion date of 11/22/2000 the date of resumed production is 06/18/2001. So although they recompleted it in 2000 doesn't look like they started slight production until the latter of 2001. 04/15/08-KCC. |
Year | Acreage | Shut-In Pressure |
Working Pressure |
Daily Rate | Open Flow | Adj. Deliverability |
Water Production |
Meter Pressure |
Differential | Coefficient | Dry Gas Gravity |
---|---|---|---|---|---|---|---|---|---|---|---|
1996 | 618 | 109.2 | 96.1 | 18.75 | 73 | 65 | 23.3 | 95.1 | 1.5 | 1463.4 | |
1997 | 618 | 149.4 | 133.9 | 21.83 | 93 | 88 | 0 | 134 | 1.5 | 1463.4 | |
1998 | 618 | 120.4 | 98.7 | 15.94 | 44 | 42 | 0 | 98.6 | 1.05 | 1463.4 | |
1999 | 618 | 274.8 | 234.9 | 30.03 | 95 | 92 | 6 | 234.8 | 1.69 | 1463.4 | |
2000 | 618 | 0 | 0 | 0 | 0 | 92 | 0 | 0 | 0 | 0 |