|
|
|
Specific Well--15-205-27550
Engineering Data |
|
|
| View General Well Data | Viewing Engineering Data |
|
API: 15-205-27550
KID: 1038096906 Lease: Jackson, Kay Well: 2-13A Original operator: SEK Energy, LLC Current operator: SEK Energy, LLC Field: Cherokee Basin Coal Area Location: T30S R15E, Sec. 13 NE NE SE 2015 North, 460 West, from SE corner NAD27 Longitude: -95.7076868 NAD27 Latitude: 37.4339682 NAD83 Longitude: -95.7079451 NAD83 Latitude: 37.4340273 Lat-long calculated from footages |
County: Wilson
Permit Date: May-06-2008 Spud Date: Jun-05-2008 Completion Date: Dec-17-2010 Plugging Date: Well Type: CBM Status: Inactive Well Total Depth: 1062 Elevation: 813 GL Producing Formation: MISSISSIPPI IP Oil (bbl): IP Water (bbl): IP GAS (MCF): KDOR code for Gas: 230967 KCC Permit No.: |
|
View well on interactive map
View well in the Walter's Digital Library (WDL login required) | |
|
Drill Stem Tests Taken: No Samples Set to Survey: No Cores Taken: No Electric Logs Run: Yes Den-neu Log DIL Log Temp Log Method of Completion: Perforated Date of First or Resumed Production/Injection: Dec. 17, 2010 |
Producing Method: Pumping Estimated production per 24 hours Oil: 0 Water: 20 Gas: 10 Disposition of Gas: Sold Tubing record Size: 2 3/8 Set at: 971.90 Packer at: n/a Production intervals: |
Casing recordnew or used? New |
|||||||
| Purpose of String | Size Hole Drilled |
Size Casing Set (in O.D.) |
Weight Lbs/Ft |
Setting Depth |
Type of Cement |
# Sacks Used |
Type and Percent Additives |
|---|---|---|---|---|---|---|---|
| Surface | 11 | 8.625 | 18 | 24 | Portland | 25 | |
| Production | 6.75 | 4.5 | 10.5 | 1050 | Thickset | 120 | |
Additional Cementing/Squeeze Recordpurpose? |
|||||||
| Depth Top Bottom |
Type of Cement | # Sacks Used | Type and Percent Additives | ||||
|---|---|---|---|---|---|---|---|
Perforation Record |
|||||||
| Shots Per Foot | Perforation record | Material Record | Depth | ||||
|---|---|---|---|---|---|---|---|
| 4 | 17 Shots at 765-769' | Spot 100gal 15%HCl, Breakdown, | 765-769' | ||||
| 4 | 21 Shots at 697-702' | Stage 500gal 15%HCl with 75 ball | 697-702' | ||||
| 4 | 13 Shots at 671-674' | sealers,14,000# sand & 681 bbls | 671-674' | ||||
| water | |||||||