|
|
|
Specific Well--15-091-24438
Engineering Data |
|
|
| View General Well Data | Viewing Engineering Data |
|
API: 15-091-24438
KID: 1046118365 Lease: FASOLINO Well: HB 4 Original operator: HB Energy LLC Current operator: HB Energy LLC Field: Location: T14S R22E, Sec. 4 NE SW SW 884 North, 4573 West, from SE corner NAD27 Longitude: -94.9802049 NAD27 Latitude: 38.8573122 NAD83 Longitude: -94.98045 NAD83 Latitude: 38.85732 Lat-long from GPS |
County: Johnson
Permit Date: Nov-15-2016 Spud Date: Nov-19-2016 Completion Date: Nov-21-2016 Plugging Date: Well Type: OIL Status: Producing Total Depth: 890 Elevation: 984 GL Producing Formation: BARTLESVILLE IP Oil (bbl): IP Water (bbl): IP GAS (MCF): KDOR code for Oil: 121806 KCC Permit No.: |
|
View well on interactive map
View well in the Walter's Digital Library (WDL login required) | |
|
Drill Stem Tests Taken: No Samples Set to Survey: No Cores Taken: Yes Electric Logs Run: Yes GammaRayNeutronCCL Method of Completion: Date of First or Resumed Production/Injection: Dec. 01, 2016 |
Producing Method: Pumping Estimated production per 24 hours Oil: Water: Gas: Disposition of Gas: Tubing record Size: Set at: Packer at: Production intervals: |
Casing recordnew or used? New |
|||||||
| Purpose of String | Size Hole Drilled |
Size Casing Set (in O.D.) |
Weight Lbs/Ft |
Setting Depth |
Type of Cement |
# Sacks Used |
Type and Percent Additives |
|---|---|---|---|---|---|---|---|
| Surface | 9 | 7 | 10 | 20 | Portland | 10 | 50/50 POZ |
| Production | 6.25 | 2.875 | 8 | 875 | Portland | 115 | 50/50 POZ |
Additional Cementing/Squeeze Recordpurpose? |
|||||||
| Depth Top Bottom |
Type of Cement | # Sacks Used | Type and Percent Additives | ||||
|---|---|---|---|---|---|---|---|
Perforation Record |
|||||||
| Shots Per Foot | Perforation record | Material Record | Depth | ||||
|---|---|---|---|---|---|---|---|
| 3 | 814-818 | 2" DML RTG | 4 | ||||